Changes to Energy Theft User Guide

  • 1
    Initial Assessment
  • 2
    Solution Development
  • 3
    Consultation
  • 4
    Decision
  • 5
    Awaiting Implementation
  • 6
    Implemented
Step 6 of 6
Implemented
Summary
Minor changes to the user guide have been identified following the receipt of stakeholder feedback: • The opening sentence on Slide 4 previously referred to the Theft Assessment Methodology indicating the likely scale of Electricity Theft but it is meant to be referring to the likely scale of Theft across both fuels. Hence, ‘electricity theft’ has been changed as per the attached to ‘energy theft’ • The Venn diagram on Slide 9 gave the impression that a Supplier’s theft performance was based on a consideration of their overall theft investigation performance rather than their proportion of the confirmed thefts submitted. Hence, the wording has been changed from ‘total number of tip offs’ to ‘potential instances of energy theft’, again, outlined in red.

Latest update and next planned activity

Date of latest update
Latest Update
-

Impacts Overview

Priority and rationale

Priority last updated on 17 Sep 2026

No documents available.

There is currently no Change Plan.

Unable to load the original submission data.