Cross code change to align with BSC CP1598

  • 1
    Initial Assessment
  • 2
    Solution Development
  • 3
    Consultation
  • 4
    Decision
  • 5
    Awaiting Implementation
  • 6
    Implemented
Step 6 of 6
Implemented
Summary
This Change Proposal has been raised to align with BSC CP1598, which states that six Scenario Variants of Market Messages specified within the early drafting of P375 were not progressed to the final solution of P375 and REC CP R0008.

Latest update and next planned activity

Date of latest update
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.

Impacts Overview

Priority and rationale
Standard

Priority last updated on 29 May 2026

Solution development

Problem Statement
As these Scenario Variants are not captured in the Data Specification, the relevant Market Participants won’t be able to use the Data Transfer Network (DTN) to exchange the relevant data, which would result in them having to use a less secure mechanism to send and receive data. This means the original intent of Elexon Modification P375 has yet to be achieved as not all Market Message changes have been implemented.

No documents available.

There is currently no Change Plan.

Original submission

Change details

- - -
22 Aug 2024

Change details

Cross code change to align with BSC CP1598
-
-
-
-

Impacts

No details provided
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
-
No details provided

Priority & timing

Yes
-
-
-
No details provided
-

Activity

Implementation Date has been updated to 08 Nov 2024.
Orphaned SME: Lead Technical Analyst, Orphaned SME: Lead Assurance Analyst have been allocated as SME.