New value for Site Visit Check Code (J0024)
Summary
The Change introduces a change to the MM00036/(D0139), to introduce a new Site Visit Check Code to reflect site specific capacity charges being levied by the Distribution Network Operators (DNOs) on Suppliers for their Consumers.
Latest update and next planned activity
Date of latest update
Latest Update
12/10/2023 - Change Proposal has been rejected, as the change needs to be raised under the Balancing & Settlement Code - as the impacted Data Item is a BSC owned Data Item, and is not able to be amended by a REC Change.
Impacts Overview
Priority and rationale
High
Priority last updated on 29 May 2026
Solution development
Problem Statement
DNOs need to be able to communicate to Suppliers that they will charge site-specific DUoS for de-energised sites where there is an ongoing need for the connection to be maintained.
Proposed solution summary
- As a Consumer, I need my Supplier to be aware of any charges that will be applied by the DNO for the provision of the connection while the site is De-energised.
- As a Supplier I need to know if charges are expected to be levied by the DNO for retained capacity for De-energised Metering Points, so that I can pass the costs on to my Consumer.
No documents available.
Change Plan
Impact Assessment Report Published
Completed
Start:
14 Aug 2023Due:
25 Aug 2023Completion:
25 Aug 2023Original submission
Change details
- - -
14 Aug 2023
Change details
New value for Site Visit Check Code (J0024)
-
-
-
-
Impacts
No details provided
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
-
No details provided
Priority & timing
Yes
-
-
-
No details provided
-