REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled
Summary
A BSC CP has been raised to clarify Supplier obligations for IF-002 messages where a Switch is cancelled. This obligation is also in REC Schedule 14 Metering Operations, so a REC change is required or the obligation remains in place.
Latest update and next planned activity
Date of latest update
Latest Update
06/08/2026 - Change Proposal accepted in by Code Manager
Impacts Overview
Impacted REC Parties and Market Participants
Energy Supplier
Impacted REC Documents
Schedule 14 - Metering Operations
Other Industry Codes impacted
Balancing and Settlement Code (BSC)
Priority and rationale
Standard
Priority last updated on 17 Sep 2026
Solution development
No documents available.
There is currently no Change Plan.
Original submission
Change details
- - -
6 Aug 2026
Change details
REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled
A BSC CP has been raised to clarify Supplier obligations for IF-002 messages where a Switch is cancelled. This obligation is also in REC Schedule 14 Metering Operations, so a REC change is required or the obligation remains in place.
If the BSC CP progresses without the associated REC change, then Suppliers may not take the correct action as the obligations within the REC would remain unchanged.
The BSC CP specifies that where a IF-002 is received for a Switch request that has been cancelled, no actions are to be taken.
Similar clarifies are to be added to REC Schedule 14 Metering Operations 22.6.1 and 22.9.1
Similar clarifies are to be added to REC Schedule 14 Metering Operations 22.6.1 and 22.9.1
n/a
Impacts
No details provided
Other (please provide details in Additional information box below)
No Consumer impact identified
Schedule 14 - Metering Operations
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
Energy Suppliers
-
Balancing and Settlement Code (BSC)
BSC CP Clarify Supplier obligations for IF/PUB-002 messages where a registration switch is cancelled – BSC is the lead code
-
No details provided
Priority & timing
No
-
-
-
No details provided