Help
This page shows the Flow Structure for one Market Message, including its Scenario Variants and the REC Data Specification version it belongs to.
MM00401
Estimated Half Hourly Data Report
Select version
Latest
- Local Catalogue Reference
- D0022
- Message Version
- 1
- Description
- A report listing the dates over a period for which HH data has been estimated including the total consumption estimated.
- Notes
- This is a report (by MSID) showing dates for which meter period data has been estimated and includes total consumption estimated and number of half'hour periods affected.. Where an AMVLP (Asset Metering Virtual Lead Party) is involved, the MPAN Core must contain an AMSID (Asset Metering System Identifier) and not an MPAN.
| Variant ID | Name | Source | Target | Owner | Actions |
|---|---|---|---|---|---|
| Variant ID SV00401 | Name Estimated Half Hourly Data Report | Source Half Hourly Data Collector | Target Distribution Network Operator | Owner Balancing and Settlement Code Company | Change selection |
Structure
SV00401
| ID | Name | Range | Level | Required |
|---|---|---|---|---|
| 062 | MPAN Cores | Range: 1-* | L1 |
|
| MPAN Core |
|
|||
| Estimation Reason Code |
|
|||
| Additional Information | Optional | |||
| 063 | Dates for Which HH Data Estimated | Range: 1-* | L2 |
|
| Date (Midnight to Midnight UTC) |
|
|||
| Number of Periods Estimated |
|
|||
| Measurement Quantity Id |
|
|||
| Total kWh (and kVArh) of Estimated Periods |
|