Consequential Cross-Code Change for BSC P441 - Complex Site Classes Creation

  • 1
    Withdrawn
Step 1 of 1
Withdrawn
Summary
A Balancing & Settlement Code (BSC) Modification P441 is looking to introduce additional Complex Site classes which would categorise the types of Complex Site, with each having clearly defined criteria within the BSC, whilst also facilitating a new "type" of Complex Site (referred to as a Class 6 Complex Site) to allow approval of "non-standard" complex sites. It will also clarify when the netting of Imports from Exports for multiple Metering Systems registered in Supplier Volume Allocation (SVA) is permitted.

Latest update and next planned activity

Date of latest update
Latest Update
22/03/2024 - Withdrawn.

Impacts Overview

Priority and rationale
High

Priority last updated on 29 May 2026

Solution development

Problem Statement
The introduction of new Complex Site classes is needed into the REC to make the solutions under P441 and DCP 424 work. Meter Equipment Managers (MEMs) will need to understand what their new obligations are in respect of metering requirements, as well as impacts on any of the metering processes associated with a Complex Site.
Proposed solution summary
  1. As a consumer, I want more choice to take up low-carbon technology and more flexible energy solutions through local energy schemes, such as the Ofgem BEIS Smart System Flexibility Plan and any other future flexibility service provisions that may be developed.
  2. For MEMs, l want to remove ambiguity around the current Complex Site arrangements and will facilitate the advancement of community energy schemes.
  3. For Suppliers, I want to encourage more innovation that will lead to the better use of local energy schemes.

No documents available.

Change Plan

Solution Development

Completed

Start:

04 Jul 2023

Due:

14 Aug 2023

Completion:

14 Aug 2023

Party Impact Assessment

Completed

Start:

14 Aug 2023

Due:

14 Aug 2023

Completion:

04 Sep 2023

Preliminary change report

Completed

Start:

14 Aug 2023

Due:

22 Sep 2023

Completion:

22 Sep 2023

Original submission

Change details

- - -
4 Jul 2023

Change details

Consequential Cross-Code Change for BSC P441 - Complex Site Classes Creation
-
-
-
-

Impacts

No details provided
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
No details provided
-
-
No details provided

Priority & timing

No
-
-
-
No details provided
-

Activity

Proposed solution summary changed to As a consumer, I want more choice to take up low-carbon technology and more flexible energy solutions through local energy schemes, such as the Ofgem BEIS Smart System Flexibility Plan and any other future flexib…
Show more