Housekeeping February 2026
Date of latest update
Type
Change
ID
R0293
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
The Code Manager has identified a number of non-material clarifications, typographical errors and changes needed to REC products.
Status
Implementation Date
27 February 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
This Housekeeping Change Proposal seeks to make typographical and formatting corrections that have been identified and improve consistency across the REC.
Stages Selection
February 2026 Housekeeping Summary spreadsheet V1.0
February 2026 Housekeeping legal text (zip file) V1.0
R0293 Housekeeping Change Report v1.0 approved 16.12.25
Company Name
-
Review status
Review required
Obligate Energy Suppliers to provide photo evidence of Theft in Conveyance to Network Parties
Date of latest update
Type
Change
ID
R0292
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/08/2026 - the consultation open, responses must be received by 23:59 14 September 2026.
Summary
This Issue seeks to introduce an additional clause for Suppliers that have attended Sites with suspected or actual Energy Theft in Conveyance to share and store evidence of the tampering to be made available to Network Parties upon request.
Status
Implementation Date
27 February 2027
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0292 Schedule 8 draft V0.1
Archive
Off
Document title
I0292 Schedule 8 draft V0.2
Archive
Off
Problem Statement
There are cases where Energy Suppliers (or its Revenue Protection Agent) have provided the Network Parties with minimal information and no photos following Site visits for Theft in Conveyance, which results in additional time for Energy Theft Desktop Investigations and additional costs where jobs are raised for attendance that aren’t always needed.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0292 submission form
I0292 Change Report (Proposal Plan) V1.0
I0292 Consolidated Information Request Responses V1.0
I0292 Update to Plan V1.0 approved 21.07.26
I0292 Consolidated Impact Assessment Responses PUBLIC v1.0
R0292 Change Report (For Consultation) V1.0 approved 18.08.26
Company Name
-
Review status
Review required
Data Cleanse – Report Guidance V6.10
Date of latest update
Type
Change
ID
C3-0144
Urgent
No
Latest Update
-
Summary
Updates to reflect Sprint 5, including new reports: • Electricity MEM – EES Reconciliation • Related MPAN with inconsistent DPI Changes to existing reports: • Invalid Topline
Status
Implementation Status
Date Raised
Date of Update to Priority
Stages Selection
Company Name
Code Manager (RPA)
Review status
Review required
C3-0143 - Secure Data Exchange Portal (SDEP) User Guide V5.1
Date of latest update
Type
Change
ID
C3-0143
Urgent
No
Latest Update
-
Summary
The implementation of R0232 - Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) has introduced four new process types for the Change of Occupier process into SDEP. This Category 3 Change Proposal updates the SDEP User Guide to include these in the list of process types and provides the required clarity and detail for each one.
Status
Implementation Status
Date Raised
Date of Update to Priority
Stages Selection
Company Name
Code Manager (RPS)
Review status
Review required
Performance Assurance Methodology and Techniques v4.1
Date of latest update
Type
Change
ID
C3-0142
Urgent
No
Latest Update
-
Summary
PAM&T v4.0 was approved by PAB in October 2024. A minor update was made to augment the information on Data Cleanse, and several housekeeping changes were made to the document.
Status
Implementation Status
Date Raised
Date of Update to Priority
Stages Selection
Company Name
Code Manager (RPA)
Review status
Review required
Review of Schedule 1 Interpretations and Definitions
Date of latest update
Type
Change
ID
R0291
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
During the quality checks of REC Schedules for MHHS, several capitalised terms throughout schedules were identified with no entry in Schedule 1. It has also been identified that there are definitions that link to Schedules (such as 2, 20 and 21) which are no longer live REC Schedules. The Code Manager has reviewed these and determined some changes are required to Schedule 1.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
26 June 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0103 | Central provision of DCC Technical Contacts for requesting test certificates |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0291 REC Main Body draft V0.1
Archive
Off
Document title
R0291 Schedule 1 draft V0.1
Archive
Off
Document title
R0291 Schedule 25 (CSS) draft V0.1
Archive
Off
Document title
R0291 Schedule 1 draft V0.2
Archive
Off
Document title
R0291 REC Main Body draft V0.1
Archive
Off
Document title
R0291 Schedule 25 (CSS) draft V0.1
Archive
Off
Problem Statement
Without clear definitions of all defined terms within the REC, there may be confusion for REC Parties and other industry participants who use REC documents.
Stages Selection
I0291 submission form
I0291 Change Report (Proposal Plan) V1.0
R0291 Change Report (For Consultation) V1.0
R0291 Consolidated Consultation Responses v1.0
R0291 Change Report (Final Recommendation) V1.1 approved 21.04.26
Company Name
-
Review status
Review required
Clarification and Amendments to Annulment Definition in Schedule 23 – Alignment with SLC Obligations
Date of latest update
Type
Change
ID
R0287
Change Category
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
The current wording of the Annulment definition in REC Schedule 23 – Registration Services does not sufficiently align with the obligations set out in Ofgem’s Electricity Supply Standard Licence Conditions (SLC) 14.2(d),14.4(c) and 14.10. This misalignment has led to inconsistent interpretations of the usage of the Annulment process across the industry compared to the intention of the REC change and the licence obligation. This Issue is seeking further amendments to REC Schedule 23 - Registration Services and clearer guidance. This clarification is essential to prevent retention-based misuse, ensure regulatory compliance, and uphold Consumer trust in the Switching process.
Alternative Change Proposals
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
27 February 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0287 Draft Legal Changes - For Consultation
Archive
Off
Problem Statement
The current wording of the Annulment definition in the REC Schedule 23 – Registration Services is insufficiently aligned with the obligations set out in Ofgem’s Electricity Supply Standard Licence Conditions (SLC). This has led to inconsistent interpretations of the usage of the Annulment process.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
vaishnsharma@deloitte.co.uk
SME Role
Lead Assurance Analyst
I0287 submission form
R0287 and R0287A Change Report (Proposal Plan and Consultation) v1.0 approved 02.12.25
R0287 and R0287A Consolidated Consultation Responses PUBLIC
R0287 and R0287A Change Report (Final Recommendation) Post Vote 20.01.2026 v1.0
Ofgem decision to approve R0287
Company Name
-
Review status
Review required
Clarification on Detailed Impact Assessment Activities
Date of latest update
Type
Change
ID
R0286
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
The first complex technical change R0067 (Introduction of CSS Refresh Functionality) encountered a number of challenges within the design and implementation process, the change was scheduled for implementation on the 6th December 2023, however, the change was deployed with defects and was not fully operational until February 2024. Following that session, the Code Manager held discussions, and a formal Lessons Learned session with all Service Providers and identified a number of challenges with the technical change process. Some of these challenges can be attributed to the timing of the detailed design, Detailed Impact Assessments (DIA) and party impact assessments
Status
Status
Implementation Date
26 June 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0103 | Central provision of DCC Technical Contacts for requesting test certificates |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- An update to the REC Schedule 5 - Change Management.
Proposed Solution Document
Document title
R0286 Proposed legal text v1.1
Archive
Off
Problem Statement
The technical change process currently creates five challenges which can be attributed to the timing of the detailed design, PIA and DIAs. These are as follows: Lack of Clarity, Limited Feedback, Misalignment, High Contingency Costs and Inaccurate Timelines.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Change Management v3.5 RedLine for IA Clarifications
I0286 submission form
R0286_Consolidated Consultation responses V1.0
Company Name
-
Review status
Review required
New Category of SMETS Service Desk on EES and GES, and Addition of Data Items to EES Category
Date of latest update
Type
Change
ID
C3-0141
Urgent
No
Latest Update
-
Summary
This change proposes that several data items are added to the Third-Party Service Provider (Non-switching) EES Category. It also proposes that the SMETS Service Desk be added to both the Electricity and Gas DAM with the same permissions as the Switching Service Desk.
Status
Implementation Status
Date Raised
Date of Update to Priority
Stages Selection
Company Name
Code Manager (RPA)
Review status
Review required
Retail Risk Register
Date of latest update
Type
Change
ID
C3-0140
Urgent
No
Latest Update
-
Summary
The Risk Register is a key document set out in the Performance Assurance Schedule. This schedule drives the structure of the risk register as follows: 1. It drives the Risk Register to focus on Retail Risk, which includes both compliance with the Code, but also the delivery of right outcomes, both for customers and market participants. 2. It is clear that the Risk Register covers both Party performance and that of the REC Service Providers. 3. It limits any Performance Assurance interventions to areas identified in the Risk Register. Retail markets are both dynamic and complex, often with specific issues occurring and needing to be resolved quickly, with information from multiple participants needed to identify their root cause. The Risk Register, therefore, is structured with risks structured around the REC objectives. ‘Risk Drivers’ are associated with risks which measure the market and trigger appropriate action. These Risk Drivers can measure either compliance or customer outcomes. This Risk Register is reviewed annually by the Code Manager and approved by PAB. The Code Manager has conducted a review for 2025-26 and proposed changes covering: • Removed Retail Risk VI which was added last year as a result of expected increase in transformation activities resulting from transfer of responsibility for the Central Registration Service (CRS) from DCC to RECCo. Whilst there continues to be transformation of REC Service Provision, the level of risk associated with it is reduced. This is, therefore, no longer viewed as a key risk affecting the effective operation of REC arrangements. • Introduction of new Risk Drivers to monitor: o Usage of Change of Occupier (CoO) flag during switching. These are separated by Domestic and Non-Domestic supply points as trends and behaviours in both segments may vary. Based on insights from R0155, which clarified the REC requirements for CoO, we understand if the CoO flag is misused, it can lead to Erroneous Switches especially if some Suppliers have opted to not object to CoO Switch Request. Introducing this Risk Driver helps us monitor if any Supplier have disproportionality high usage, indicating if outcomes were at risk. Once these Risk Drivers are live, we will review performance for the previous 6 months as the CSS reporting is already available and propose thresholds for PAB approval in the following month. o IF045 for issues with Meter Operator Agent (MOA) Appointments. Suppliers are required to appoint a qualified MOA to every meter point they supply, and it measure would help us measure their compliance and identify any meter points open to safety risk due to lack of MOA appointment. This is dependent on reporting from DIP after migration to MHHS arrangements starts. Once the reporting is available and we have a view for c. 6 months of performance data, we will use that to propose thresholds for this Risk Driver. • General housekeeping changes, including: o Removed reference to activities that formed part of the Performance Assurance Operating Plan (PAOP) for 2024-25. o Added reference to activities within PAOP 2025-26. o Updated reference to active REC Change Issues and Proposals. When making these updates, we also considered other possible updates to the Risk Register. Notably this included considering items that have progressed through the change process and rejected or withdrawn, but evidence suggests there is still a user need or risk. These include: a. R0169 Introduction of End of Gate Closure notifications, a change raised in response to the CSS Major Incident in 2023, which intended to help CSS Users identify when all processing is completed. b. R0009 Introduction of SDEP and EES User Maintenance API, which recent sandbox applications indicate a continued need for machine-to-machine interactivity. Both of these were rejected or withdrawn as a cost beneficial solution could not be identified. Whilst we considered raising a Retail Risk, we think these kinds of identified issues are best managed through the Change Panel and Codes Roadmap, or the future Design Authority. This consultation offers REC Parties and Service Providers an opportunity to feedback on the updates proposed to the Retail Risk Register. The Code Manager has also presented this document to the Performance Assurance Board (PAB) on 30 September 2025 and sought their approval, contingent to any refinements that may be made in response to the feedback received. As the Retail Risk Register is a Category 3 document, an industry wide consultation is not required as part of updating the document. Notwithstanding, we have identified that engaging with industry is a key part of implementing the changes and are therefore seeking feedback through a consultation in order to support our Performance Assurance activity.
Status
Implementation Status
Date Raised
Date of Update to Priority
Stages Selection
Company Name
Code Manager (RPA)
Review status
Review required