Remove Schedule 2 from the baseline statement
Date of latest update
Type
Change
ID
C3-0053
Urgent
No
Latest Update
-
Summary
Remove Schedule 2 from the REC baseline statement as it no longer exists
Status
Implementation Status
Date Raised
Date of Update to Priority
Stages Selection
Company Name
Code Manager (RPS)
Review status
Review required
Updated GES Online Portal User Guide
Date of latest update
Type
Change
ID
C3-0052
Urgent
No
Latest Update
-
Summary
Updated GES Online Portal User Guide to reflect the changes being implemented as part of the November 2023 Major Release. Overview of changes to the content: R0088 - XRN5186 - Modification 0701: Aligning Capacity booking under the UNC and arrangements set out in relevant NExAs. • Section 3.3 Search Details: new screen shot to include new data items - NExA Valid From Date, NExA Valid To Date • Supply Meter Point Information Glossary: added NExA Valid From Date and NExa Valid To Date to the table • Section 3.9 Supply Meter Point Quantities: new screenshot to include new data items – NExA SOQ, NExA SHQ • SMP Quantities Glossary: added NExA SOQ and NExA SHQ to the table XRN5482 - Replacement of reads associated to a meter asset technical details change or update (RGMA) • Read Types Class 3 & 4: Removed Discontinued Read Type codes table. • Read Types Class 3 & 4: Added new Read Type of K to Current Read Type codes table. GES P1 Screen Changes • Section 3.3 Search Details: New screen shot to include new Registration Active Date data item. Also updated data item label from ‘Confirmation Effective Date’ to ‘UNC Confirmation Effective Date’ • Supply Meter Point Information Glossary: Added Registration Active Date to the table and updated Confirmation Effective Date to UNC Confirmation Effective Date. • Section 3.3 Search Details: Added statement regarding conditional formatting data field text to display red where the Registration Active Date and the UNC Confirmation Effective date do not align • Section 3.15 CSS Switching Data tab: Added statement regarding conditional formatting data field text to display red where the Registration Active Date, the Shipper From Date and the Registration Status From Date do not align General • 3.14 Interruption Results: Removed duplicate screenshot. • Supply Meter Point Information Glossary: Updated in line with data items displayed on the screen - Removed ‘Emergency Contacts’, ‘iGT’, ‘iGT Short Code’, ‘EUC’, ‘EUC Effective Date’ and ‘Supply Point EUC’ • Meter Asset Data Glossary: Updated in line with data items displayed on the screen - Removed ‘Location ID’ and ‘LDZ’. Added ‘MAM Short Code’ • Convertor Asset Data Glossary: Updated in line with data items displayed on the screen - Removed ‘Convertor’. Added ‘Correction Factor’ • Section 3.10 Related Meter Points: Cropped screenshot to just display the Related Meter points tab • Section 3.13 Emergency Contact: Cropped screenshot to just display the Emergency Contact tab • Section 3.14 Interruption Results: Cropped screenshot to just display the Interruption Results tab The changes will have no obligation for REC parties to take any additional actions.
Status
Implementation Status
Date Raised
Date of Update to Priority
Stages Selection
Company Name
GES Provider
Review status
Review required
On-site Aggregation as a method to facilitate Third Party Access - BSC P455
Date of latest update
Type
Change
ID
R0150
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Following a modification proposal to the Balancing and Settlement Code (BSC) to allow on-site aggregation as a method for third party access on private networks, the Code Manager is required to amend the REC to place a requirement on the Meter Equipment Managers (MEMs) appointed by the boundary points Electricity Supplier, to rectify any faults found with the submeters used in the on-site aggregation methodology.
Change Plan
Preliminary Change Report and Consultation Issued
Completed
Start:
15 Jan 2024Due:
22 Mar 2024Completion:
22 Mar 2024Party Impact Assessment
Completed
Start:
30 Oct 2023Due:
15 Jan 2024Completion:
15 Jan 2024Final Change Report Issued
Completed
Start:
22 Mar 2024Due:
26 Apr 2024Completion:
25 Apr 2024Responsible Committee Decision
Completed
Start:
26 Apr 2024Due:
08 May 2024Completion:
08 May 2024Status
Implementation Date
08 November 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0105 | Review of ONAGE SLAs |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- The BSC Modification P455 Modification proposes to place a requirement on the SVA MOA (MEMs) appointed by the Boundary Point Supplier to rectify any faults found with the sub meters used in the On-Site Aggregation methodology; and to produce and submit the On-Site Aggregation Form to the HHDC. As MEMs (SVA MOAs) are governed under the Retail Energy Code (REC), R0150 is the REC's subsequent change to propose this.
Proposed Solution Document
Document title
Metering Operations - R0150 Legal Drafting (Published with Consultation 22.03.2024)
Archive
Off
Document title
Schedule 14 - Metering Operations Schedule - R0150 Legal Drafting (Published with Final Change Report) 25.04.2024
Archive
Off
Document title
Extract: R0150 - Schedule 14 Legal Drafting (Published with Final Change Report) 25.04.2024
Archive
Off
Document title
Approved for Implementation - R0150 Legal Solution (Schedule 14 Extract)
Archive
Off
Document title
Approved for Implementation - R0150 Legal Solution (Schedule 14).
Archive
Off
Document title
Ofgem - BSC Modification P455 Decision
Archive
Off
Problem Statement
Under the proposed solution for BSC Modification P455, Consumers will require a Market Participant to oversee the maintenance of their sub-meter, including installations and rectification of metering faults. To ensure this, the REC will need to place a requirement on the MEMs appointed by the boundary point Electricity Supplier to rectify any faults found with the sub-meters used in the On-Site Aggregation.
Stages Selection
R0150 - On-site Aggregation as a method to facilitate Third Party Access - BSC P455
R0150 Change Proposal Plan V1.0 (Approved 19.12.2023)
R0150 - Change Proposal Re-Plan (Approved) 08.02.2024
R0150 Initial Assessment Report V1.0 (Approved) 19.12.2023
R0150 - Preliminary Change Report V1.0 (Published for Consultation 22.03.2024)
R0150 - Consolidated Consultation Responses (17.04.2024)
R0150 - Final Change Report V2.0 (Approved) 08.05.2024
Company Name
-
Review status
Review required
Updates to the EES API Interface Specification
Date of latest update
Type
Change
ID
R0149
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
The EES Provider has made some alterations to the EES API Interface Specification to incorporate new data items that support MHHS Stage 0 as well as some housekeeping changes and clarifications to the methods within the API.
Change Plan
Preliminary Change Report and Consultation published
Completed
Start:
20 Oct 2023Due:
03 Nov 2023Completion:
03 Nov 2023Consultation close
Completed
Start:
03 Nov 2023Due:
17 Nov 2023Completion:
17 Nov 2023Final Change Report issued
Completed
Start:
17 Nov 2023Due:
22 Nov 2023Completion:
22 Nov 2023Responsible Committee Decision
Completed
Start:
22 Nov 2023Due:
29 Nov 2023Completion:
29 Nov 2023Status
Implementation Date
06 December 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0106 | Performance Assurance Report Catalogue V5.1 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As an EES API User, I want to ensure that I have the most up to date technical information so that I can use the API in the most effective way.
- As the EES Provider, I want to ensure that the most up to date technical information is available to Users.
Proposed Solution Document
Document title
EES API Interface Specification v3.1.5. Redline (30.10.2023)
Archive
Off
Problem Statement
The current version of the EES API Technical Specification (V3.1.4) does not contain the latest updates from the EES Provider. Without these updates, API users will not be able to utlilise the new data items or have further detail on the data items returned within SearchUtilityAddress and GetTechnicalDetailsByMpan.
Stages Selection
R0149 - Change Proposal Form.docx
R0149 - Change Proposal Plan (Approved) 07.11.2023
R0149 - Preliminary Change Report (Published for Consultation) 03.11.2023
R0149 Initial Assessment Report (Approved) 07.11.2023
R0149 - Consolidated Consultation Responses (22.11.2023)
R0149 - Final Change Report v2.0 (Approved) 29.11.2023
Company Name
-
Review status
Review required
C3-0051- Remove Product from REC Baseline Statement
Date of latest update
Type
Change
ID
C3-0051
Urgent
No
Latest Update
-
Summary
Electricity REL Data Access Matrix- Needs removing as a product from the REC baseline statement as it no longer exists (Can be deleted it as part of the Nov release, along side updates to REC schedule version numbers)
Status
Implementation Status
Date Raised
Date of Update to Priority
Stages Selection
Company Name
Code Manager (RPS)
Review status
Review required
Retail Risk Register update
Date of latest update
Type
Change
ID
C3-0050
Urgent
No
Latest Update
-
Summary
1. MHHS Design Artefacts currently available have been reviewed along with REC Code drafting for MHHS to add MHHS considerations. As next steps, the Code Manager will work with the DIP Manager, Electralink and the Registration Services to agree appropriate reporting to monitor Retail Risks. 2. Retail Risk Priority Score has been reviewed and updated. The Priority Score for Retail Risk 9 which looks at performance of REC Services has been increased based on recent market events. 3. Retail Risks and Risk Drivers have been updated to focus on areas of greater impact to consumers and/or to the retail energy market. As a result, we have: a. Removed areas with low volume of processes, where general compliance across the industry has been acceptable, e.g., Green Deal obligations, Meter Point relationship request rejections, to allow Performance Assurance activities to focus on areas of higher risk. b. Removed monitoring of obligations that are governed under other codes but referenced within the REC, e.g., sending the read to the Non-Half Hourly Data Collector (NHHDC) on resolution of Switch Meter Read dispute. c. Added new Risk Drivers focusing on areas that require improvement, e.g., accuracy of MTDs, Switches with Change of Occupier, MEM appointment, Consumer-impacting REC Service issues. d. Replaced Risk Drivers to allow more flexibility in risk monitoring, e.g., objections for domestic versus non-domestic switches. e. Updated Retail Risk and Risk Driver titles to further clarify the obligations covered and/or risk monitored. 4. General housekeeping changes.
Status
Implementation Status
Date Raised
Date of Update to Priority
Stages Selection
Company Name
Code Manager (RPA)
Review status
Review required
Prepayment Levelisation
Date of latest update
Type
Change
ID
R0147
Change Category
Urgent
Yes
Latest Update
This change was implemented as part of the the Extraordinary release on 28 March 2024. *This Change Proposal has no impacts on Market-wide Half Hourly Settlement
Summary
This Change Proposal seeks to introduce the necessary governance and charging arrangements into the Retail Energy Code, to reconcile the impact on Domestic Energy Suppliers of levelling the cost of standing charges to Domestic Consumers paying by means of a Prepayment Meter with those paying by Direct Debit. This proposal is being raised on a contingent basis pending the decision of the Authority on whether to modify the standard conditions of the Gas and Electricity Supply Licences to levelise standing charges. That decision is expected in January 2024. This Change Proposal is being progressed in anticipation of the reconciliation of levelisation costs being administered by the Retail Energy Code Company.
Change Plan
Solution development completed
Completed
Start:
22 Sep 2023Due:
12 Oct 2023Completion:
12 Oct 2023Impact assessment period started
Completed
Start:
12 Oct 2023Due:
13 Oct 2023Completion:
13 Oct 2023Impact assessment completed
Completed
Start:
13 Oct 2023Due:
08 Nov 2023Completion:
08 Nov 2023Preliminary Change Report issued
Completed
Start:
08 Nov 2023Due:
17 Nov 2023Completion:
17 Nov 2023Responsible Committee review of Preliminary Change Report
Completed
Start:
17 Nov 2023Due:
21 Nov 2023Completion:
21 Nov 2023Consultation started
Completed
Start:
21 Nov 2023Due:
22 Nov 2023Completion:
22 Nov 2023Consultation closed
Completed
Start:
22 Nov 2023Due:
13 Dec 2023Completion:
13 Dec 2023Final Change Report issued
Completed
Start:
13 Dec 2023Due:
12 Jan 2024Completion:
11 Jan 2024Responsible Committee decision
Completed
Start:
12 Jan 2024Due:
16 Jan 2024Completion:
16 Jan 2024Authority Determination requested
Completed
Start:
16 Jan 2024Due:
17 Jan 2024Completion:
17 Jan 2024Status
Implementation Date
28 March 2024
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As a Domestic Consumer, I want to be charged the same standing charges regardless of whether I pay by DD or have a Prepayment Meter.
- As an Energy Supplier, I want my obligations regarding data provision to be clear so that I can provide accurate data. As an Energy Supplier, I want there to be a fair reconciliation mechanism calculates, reports, invoices and credits my organisation with the outcome of applying the payment levelisation methodology. As an Energy Supplier, I want the arrangements for the payment mechanism and terms, charging arrangements and invoicing to be clearly set out in the REC, so I can meet my obligations and have confidence in how the scheme operates.
- As RECCo, I want my responsibilities in relation to the development and administration of the levelisation scheme to be clearly set out in the REC so that I can successfully deliver the scheme for the industry. As the REC Code Manager, I want the levelisation scheme arrangements to be clearly set out in the REC, so that I can fulfil my role in administering and assuring the scheme.
Proposed Solution Document
Document title
Prepayment Levelisation - High level Solution Overview 05.10.2023
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v2.0 13.10.2023
Archive
Off
Document title
R0147 Draft Legal Text 05.10.2023
Archive
Off
Document title
R0147 Legal Text for PCR 17.11.2023
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v3.0 (17.11.2023)
Archive
Off
Document title
Payment Method Levelisation Solution Requirements (17.11.2023)
Archive
Off
Document title
Schedule XX Appendix - Supplier Data Reporting Specification v1.0
Archive
Off
Document title
R0147 Legal Text For Consultation 22.11.23
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v4.0 For Consultation 22.11.2023
Archive
Off
Document title
PPM Levelisation - High level Solution Overview v5.0 11.01.2024
Archive
Off
Document title
Payment Method Levelisation Solution Requirements_11.01.2024
Archive
Off
Document title
R0147 Legal Text for FCR 11.01.2024
Archive
Off
Document title
Ofgem Letter Levelisation - Alignment of legal text and license conditions 20.12.2023
Archive
Off
Document title
R0147 Legal text - Consultation to FCR comparison
Archive
Off
Document title
Levelisation - Alignment of legal text and licence modifications REC Response 17.01.2024
Archive
Off
Document title
R0147 Additional data specification guidance 23.02.2024
Archive
Off
Problem Statement
Ofgem are working towards and consulting on the design and implementation of a levelisation scheme to align the standing charges of Domestic Consumers who pay through a Prepayment Meter with those who pay via DD. RECCo will be the delivery partner for this scheme, however, the requirements and arrangements for the scheme need to be established in the REC.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0147 - Change Proposal Form.docx
R0147 Change Proposal Plan v2.0 (Approved) 14.11.2023
R0147 - Change Proposal Re-Plan (Approved) 19.12.2023
R0147 Initial Assessment Report v2.0 (Approved) 03.10.2023
R0147 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0147 Preliminary Change Report v2.0 (Approved) 22.11.2023
R0147 Consolidated Consultation Responses v1.0 PUBLIC
R0147 Final Change Report v2.0 (Post-Vote) 16.01.2024
Authority decision on REC modification proposal R0147 - Prepayment Levelisation 23.02.24
Company Name
-
Review status
Review required
Data Specification Update for Refresh Functionality
Date of latest update
Type
Change
ID
R0146
Change Category
Change Path
Priority
Urgent
No
Latest Update
23/08/2024 - This change was successfully implemented as part of the August 2024 Extraordinary REC Release on 23 August 2024.
Summary
This change has been raised to update the Data Specification and to align it with the changes made during implementation of change proposal ‘R0067 – Introduction of CSS Refresh Functionality’.
Change Plan
Preliminary Change Report Published
Completed
Start:
21 Aug 2023Due:
16 May 2024Completion:
16 May 2024Consultation Issued
Completed
Start:
16 May 2024Due:
16 May 2024Completion:
16 May 2024Final Change Report Issued
Data Specification Update for Refresh Functionality > Change Plan
Start:
16 May 2024Due:
19 Jun 2024Completion:
Responsible Committee Decision
Data Specification Update for Refresh Functionality > Change Plan
Start:
19 Jun 2024Due:
26 Jun 2024Completion:
Impacted Consumers
Status
Implementation Date
23 August 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0103 | Central provision of DCC Technical Contacts for requesting test certificates |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As a Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
Proposed Solution Document
Document title
R0146 Solution Development Report
Archive
Off
Document title
R0146 Attachment A - Proposed Data Specification Changes
Archive
Off
Problem Statement
Following implementation of R0067, a small number of Market Messages and Data Items need to be appropriately reflected within the Data Specification.
Stages Selection
R0146 - Change Proposal Form
R0146 - Change Proposal Plan v1.0 (Approved)
R0146 - Initial Assessment Report v1.0 (Approved)
R0146 - Preliminary Change Report v1.0
R0146 Final Change Report (Post-Vote) v1.0 26.06.2024
Company Name
Code Manager
Review status
Review required
Amendment to Multiplication Factor Enumerations to Support Hydrogen Trials
Date of latest update
Type
Change
ID
R0142
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
The H100 hydrogen gas trial involves the supply of hydrogen gas to households in place of natural gas. The quantity of gas supplies needs to be billed in a way that is comparable to standard gas supply. To facilitate the trial, a multiplication factor enumeration value must be established within the Data Specification that can replicate hydrogen’s calorific value, therefore allowing accurate billing.
Change Plan
SERVICE PROVIDER IMPACT ASSESSMENT ISSUED
Completed
Start:
11 Aug 2023Due:
27 Nov 2023Completion:
27 Nov 2023PARTY IMPACT ASSESSMENT ISSUED
Completed
Start:
27 Nov 2023Due:
01 Dec 2023Completion:
01 Dec 2023PRELIMINARY CHANGE REPORT PUBLISHED
Completed
Start:
01 Dec 2023Due:
19 Jan 2024Completion:
19 Jan 2024CONSULTATION ISSUED
Completed
Start:
19 Jan 2024Due:
19 Jan 2024Completion:
19 Jan 2024FINAL CHANGE REPORT PUBLISHED
Completed
Start:
19 Jan 2024Due:
20 Feb 2024Completion:
16 Feb 2024RESPONSIBLE COMMITTEE DECISION
Completed
Start:
20 Feb 2024Due:
28 Feb 2024Completion:
28 Feb 2024Status
Implementation Date
28 June 2024
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As a Consumer taking part in the H100 trial, I want to be charged based on the amount of gas I consume, such that I am not charged more than I would have been, had I consumed the equivalent energy from natural gas.
- As a Gas Supplier, I want to ensure H100 trial Consumers, are not charged more than they would have been, had they consumed the equivalent energy from natural gas. 2- As a Gas Transporter, I want to accurately know how much hydrogen gas is being offtaken, so that I can support Suppliers. 3- As the Central Data Service Provider (CDSP), I want Market Messages relating to meter asset information to be accurate, so that I am better able to support dependant REC Parties. 4- As a Meter Equipment Manager (MEM), I want my metering assets compatible with the H100 trial to be underpinned by accurate Market Messages, so that I able to manage these meters correctly.
Proposed Solution Document
Document title
R0142 Solution - DI40145 - A0120 - Multiplication Factor Change v2.0
Archive
Off
Document title
R0142 Solution-DI40145-A0120-Multiplication Factor Change v2.1
Archive
Off
Problem Statement
In order for the H100 gas trial to be successful, a billable value for hydrogen gas needs to be accurately calculated from supplied physical volumes. To do this, relevant Data Items (relating to the calculation of billable gas volumes) within the Data Specification need to be updated to allow a new value for the multiplication factor. This change seeks to introduce a new enumeration value for the multiplication factor needed to facilitate the addition of this new value.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
DI40145 Multiplication Factor - 23.06.2023
R0142 - Change Proposal Form.pdf
R0142 - Change Proposal Form
R0142 Change Proposal Plan v1.0 (Approved) - 05.12.2023
R0142 Initial Assessment Report v1.0 (Approved) - 05.12.23
R0142 Consolidated Impact Assessment Responses V1.0 16.01.24
R0142 Preliminary Change Report (Published for Consultation) V1.0 19.01.24
R0142 Consolidated Consultation Responses v1.0 16.02.24
R0142 Final Change Report (Post-Vote) v1.0 - 28.02.24
Company Name
-
Review status
Review required
Housekeeping amendments
Date of latest update
Type
Change
ID
R0140
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
The Code Manager has identified a number of typographical and formatting errors, as well as opportunities to provide clarity, improve consistency and accuracy across the REC Services and products. These changes have been assessed as meeting the criteria to be progressed via a Housekeeping Change Proposal. Schedule 27 – RMP Lifecycle Schedule 1 – Interpretations and Definitions Schedule 5 – Change Management Schedule 9 – Qualification and Maintenance
Change Plan
Publish House Keeping Change Report
Completed
Start:
11 Aug 2023Due:
08 Sep 2023Completion:
08 Sep 2023Responsible Committee decision
Completed
Start:
08 Sep 2023Due:
19 Sep 2023Completion:
19 Sep 2023Implemented
Completed
Start:
19 Sep 2023Due:
03 Nov 2023Completion:
03 Nov 2023Impacted Consumers
Status
Implementation Date
03 November 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0104 | Clarifying requirement for continuous billing following an Erroneous Switch |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 08 Jun 2026 | ||
| 1.0 | 08 Jun 2026 |
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0140 Final Draft Legal text
Archive
Off
Problem Statement
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard change process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical and consistency errors. It also provides an opportunity to introduce necessary clarifications.
Stages Selection
R0140 - Housekeeping Change Report v1.0 (Approved) 19.09.23
Company Name
Gemserv
Review status
Review required