ESME ID Update Rejections

Date of latest update
Type
Change
ID
R0222
Change Path
Priority
Urgent
No
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
The Electricity Smart Meter Equipment (ESME) ID is a unique identifier that provides a designation for a Smart Meter. Electricity Retail Data Agent (ERDA) systems were updated as per the requirements in R0033 to not allow for multiple incidences of an individual ESME ID to be registered, and reject the update, even when a second incidence of an ESME ID would be legitimate, for example in the case of a re-use of Metering Asset or a crossed meter. This Issue seeks to resolve this feature of the ESME ID validation while maintain data accuracy.
Proposer
Carl Carl Dennis
Impacted Consumers
Status
Implementation Date
Status Live
EMAR Version _live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0222 Data Spec DI51544 V1.0
Archive
Off
Problem Statement
ERDA data validation on the ESME ID Data Item in the D0312(MM00256) Market Message is imperfect, and can result in invalid rejections. This occurs when more than one incidence of an ESME ID is passed through individual ERDA system, as it only allows for a single occurrence, even if historic ones have been end-dated. In situations where a Metering Asset has been re-used, thus re-using the ESME ID, a rejection will occur, in an example of an unintended functionality of the validation system.
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
I0222 Change Report (Plan) (Approved) V1.0 04.02.25
I0222 Change Report (IA) (Pre-Approval) V1.0 23.04.25
R0222 Change Report (Consultation) V1.0 01.05.25
R0222 Consolidated Consultation Responses V1.0
R0222 Change Report (Post-Vote) V1.0 25.06.25
Company Name
REC Code Manager
Review status
Review required

Stranded RMPs in Defunct Suppliers

Date of latest update
Type
Issue
ID
I0219
Change Path
Priority
Urgent
No
Latest Update
27/02/2025 - Change is now not being merged into any other changes and will proceed as a standalone change. A potential solution has been identified, but will be discussed for potential cross code impacts
Summary
Currently within Schedule 23 a Registration can only be undertaken on RMPs with an Operational or Dormant RMP Status, and not Terminated. Terminated is a status that the RMP is set to when the Meter Point Status is no longer operational or the site is isolated. It is right that these sites are not able to be Registered as there is a risk that Suppliers could inadvertently Register such Meter Points. We do have instances where such sites are stranded in defunct Supplier portfolios - and the Supplier no longer has the capability to take the relevant action to Deactivate the Registrations. This may because the operational staff have left and the business is in administration.
Proposer
David Addison
Change Plan

Discussed at Technical Change Workshop

Completed

Start:

Due:

Completion:

25 Feb 2025
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
Lead Analyst
James Hardy
Date of Update to Priority
Solution Development
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Issue Proposal Form
Company Name
Xoserve
Review status
Review required

Proposal to Enable Broader Use of Retail Energy Location (REL) Data for Non-Switching Applications

Date of latest update
Type
Issue
ID
I0218
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/08/2026 - On 04 August 2026, the REC Change Panel approved the extension to plan for I0218. Service Provider Impact Assessments are in progress.
Summary
The problem being addressed is the current restriction within the Retail Energy Code (REC) that limits the use of Retail Energy Location (REL) data solely to switching purposes. This restriction prevents the full utilisation of REL data, which could be valuable for a broader range of operational, regulatory, and industry applications. Key Issues: - Currently, REL data, enriched with Unique Property Reference Numbers (UPRNs), is available via the Electricity and Gas Enquiry Services. However, Schedule 29 (Address Management) of the REC restricts its use to switching purposes only, preventing its use in other important industry initiatives. - Various industry stakeholders, including REC and non-REC data requestors as well as Ofgem (the regulator), have expressed a strong interest in utilising REL data for non-switching purposes. The restriction is seen as a limitation, especially for initiatives that require accurate property data to support wider operational and regulatory functions. - By restricting the use of REL data to switching, stakeholders are unable to fully leverage it for improving operational efficiency, regulatory compliance, and overall service delivery. Lifting this restriction would enable the wider use of REL data, allowing stakeholders to benefit from its full potential across various non-switching applications.
Proposer
Elise Handy
Change Plan

Proposal plan approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jan 2025

Extension to Proposal Plan approved by REC Change Panel

Completed

Start:

Due:

Completion:

06 May 2025
Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Date of Update to Priority
Solution Development
Proposed solution summary
  1. RECCo would acquire a AddressBase Core license from Ordinance Survey and the REC would be updated to allow parties to take full advantage of this data. In order for parties to use the REL data, they would need to acquire an AddressBase Premium license from Ordinance Survey or other relevant license.
Problem Statement
Retail Energy Location (REL) data currently is not permitted for uses such as improving customer service and streamlining internal processes. This means that stakeholders, such as Ofgem and data requestors, have been unable to benefit from this data and Consumers are therefore unable to benefit from the full potential use of their data.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Issue proposal form
I0218 - Change Report (Proposal Plan) V2.0 (07.05.2025)
I0218 - Extension to Plan V1.0 (06.05.2025) (Approved)
I0218 - Update to Plan V2.0 (09.09.2025) (Approved)
I0218 - Update to Plan V3.0 (18.11.2025) Approved
I0218 Extension to Plan V1.0 Pre-Approval
I0218 - Extension to Plan V2.0 (04.08.2026) Approved
Company Name
RECCo
Review status
Review required

Multiple Switch Requests Increasing Objection Rate

Date of latest update
Type
Issue
ID
I0214
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/05/2025 - the Code Manager has withdrawn this Issue, as there are no adequate solution options and minimal Consumer detriment. The adoption window has closed.
Summary
REC Parties have told the Code Manager that they are seeing multiple registrations attempts (10 plus attempts on consecutive days in some instances) on individual MPxNs. They are concerned about Consumer detriment as those trying to switch are not getting time to review objection related communications from their current Supplier to allow them to act and resolve the issue. This was initially presented as a non-domestic issue, but initial Code Manager investigations have also highlighted potential concern around proposed domestic transfers as well. There is also a risk of Party Performance impacts with initial analysis flagging potential impacts on Performance Assurance Risk Drivers, 8.9, 8.10 & 8.11.
Proposer
carl.dennis
Change Plan

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Mar 2025
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Non-Domestic Consumers are having their Switch experience affected by multiple Objection attempts following a single initial attempt to register for their supply by a prospective gaining Supplier. This results in Consumer detriment, as multiple Objections result in repeated rounds of communications to the Supplier. This results from automated Registration systems employed by Non-Domestic Suppliers.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Issue Proposal Form
I0214 Change Report (Plan) (Approved) V1.0 17.12.24
I0214 Rebaselined Plan v1.0 Approved 28.03.25
Company Name
Code Manager
Review status
Review required

Introducing Third Party Intermediary (energy broker) assurance and accreditation (Alternate)

Date of latest update
Type
Change
ID
R0137A
Change Category
Urgent
No
Latest Update
16/05/2025 - the Authority have published their decision to reject R0137 and R0137A.
Summary
This change seeks to expand the obligation for Energy Suppliers to only work with TPIs who are adhering to principles as set out in the REC TPI Code of Practice to all Non-Domestic Consumers. It also looks to reduce the burden on Energy Suppliers having to perform their own audits by introducing a REC Services Accreditation Scheme and allowing companies to qualify as an Industry-Recognised Accreditation Body.
Proposer
Caroline Freimuller
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Legal Text R0137A Consultation
Archive
Off
Document title
Legal Text for R0137A - Final
Archive
Off
Problem Statement
Non-Domestic Consumers have more limited protections than Domestic and Microbusiness Consumers in the energy market, and so may not always experience best practice from all parties they interact with. The aim is to expand these protections while limiting the audit burdens on Suppliers and TPIs.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0137A Change Proposal Form
Authority decision on REC modification proposal R0137 and R0137A
Company Name
REC Code Manager
Review status
Review required

Creation of a Mechanism to Allow Third Parties to Report Objection Activity

Date of latest update
Type
Issue
ID
I0213
Change Category
Change Path
Priority
Urgent
No
Latest Update
15/07/2025 - The Code Manager has rejected Issue I0213. This Issue has been deemed out of scope of the REC and has been rejected following a legal review. This decision was ratified by the REC Change Panel at their meeting on 15 July 2025.
Summary
Presently only industry parties can raise the matter of non-compliant or unwarranted objections activity that a supplier may be participating in. This Issues has been raised to request RECCo to consider accepting notice and evidence (that can be acted upon) from qualifying 'non industry' parties, from third party consultants and brokers.
Proposer
Simon Askew
Change Plan

Proposal Plan Approved at REC Change Panel

Completed

Start:

Due:

Completion:

06 May 2025
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Date of Update to Priority
Solution Development
Proposed solution summary
  1. I0213 has been raised with a suggestion that the Code Manager should consider accepting notice and evidence from qualifying non-industry Parties, including Third Party consultants and brokers (Third Party Intermediaries (TPIs)). A possible solution for this may include a new submission page, or form, on the REC Portal, that would allow Third Parties to submit evidence of non-compliant Objection activity.
Problem Statement
There is currently not a method for Third Parties, who may be involved in the Switching process, to report non-compliant Objection activity. Non-Compliant Objection activity can result in time consuming procedures for Consumers, creating unnecessary engagement with Energy Suppliers, and may result in a financial burden.
Stages Selection
Stages Selection
I0213 - Change Proposal Form
I0213 - Change Report (Proposal Plan) 25.04.2025 (Approved)
I0213 - Solution Development Report (for Party impact assessment) V1.0 (16.05.2025)
I0213 Consolidated Impact Assessment Responses V1.0 (Non-Confidential) 07.07.2025
Company Name
Energy Consultants Association
Review status
Review required

Review of the REC's Address Management Service

Date of latest update
Type
Issue
ID
I0200
Change Category
Change Path
Priority
Urgent
No
Latest Update
13/05/2026 - The REC Code Manager is establishing a new REC working group to support the progression of I0200 – Review of the REC’s Address Management Service. If you would like to attend the I0200 Working Group, please register your interest by contacting the Code Manager at change.management@recmanager.co.uk. The first meeting will take place in June 2026, with the exact date and time to be confirmed in due course and communicated via the REC Change Bulletin and via email to all those who register their interest.
Summary
Having the incorrect address can lead to a range of Consumer issues, including switching, billing and meter reading problems. The Meter Point Location (MPL) and Retail Energy Location (REL) have been added to the Code to resolve this issue. Whilst there had been progress resolving address data issues, there is not currently a mechanism to establish Code level targets for address improvement, resulting in around 2.8 million unmatched addresses.
Proposer
Claire Hemmens
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Date of Update to Priority
Solution Development
Problem Statement
There has been progress resolving address data issues, but there is no mechanism to clearly establish Code level targets for address improvement, or overall market performance.
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0200 - Improving Address Management Targets (Issue Form)
I0200 - Change Issues Group paper
I0200 - Change Report (Proposal Plan) V1.1 (Approved) 18.02.2025
I0200 - Update to Plan (Pre Approval) 14.04.2026
Company Name
REC Code Manager
Review status
Review required

A process for resolution of gas unregistered sites

Date of latest update
Type
Issue
ID
I0199
Other Industry Codes impacted
Change Path
Urgent
No
Latest Update
09/10/2024 - This Issue has been withdrawn as it will be progressed as part of I0172 and any Issues not related to the REC will be handed off to UNC & IGTUNC.
Summary
Issue raised by RECCo at RIG. Healthy discussions have led to a recommendation that RIG refer this to ChIG for further discussion. GTs have reported to RECCo that there are approx 85,000 unregistered sites on the networks with no process for resolution between GTs and Suppliers
Proposer
shelley.rouse
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
Date of Update to Priority
Solution Development
Stages Selection
Stages Selection
I0199 - Gas Unregistered Sites (PDF)
Company Name
REC Code Manager
Review status
Review required

Addition of MEMs to the Gas Enquiry Service (GES) API

Date of latest update
Type
Issue
ID
I0195
Urgent
No
Latest Update
16/10/2024 - This Change Issue has been rejected as is already being progressed under the data access change process implemented as R0118.
Summary
Empty
Proposer
Amy Crowe-Lamont
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
Stages Selection
I0195-~1.doc
Company Name
Code Manager
Review status
Review required

Review of Metering Asset data transferred from MAMs to the CDSP

Date of latest update
Type
Issue
ID
I0196
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
02/09/2026 - Update to plan published ahead of review at the REC Metering Expert Panel on 09 September 2026.
Summary
It has emerged that a high proportion of gas Data Items contain mismatches when comparing between Metering Asset Managers (MAM), Gas Suppliers, and the Central Data Service Provider. This Issue seeks to explore this issue and identify mechanisms by which these mismatches may be resolved.
Proposer
Amy Crowe-Lamont
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Work conducted by RPA has identified a significant number of mismatches between gas Data Items held by key stakeholders. This may result in Consumer detriment, as information relevant to an MPRN may not be held accurately by any given Party. As such, there is a need to review processes pertaining to the communication of gas data by MAMs onward to the CDSP to mitigate the potential for mismatches.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0196 Issue Proposal Form (Word)
I0196 Issue Proposal Form (PDF)
I0196 Change Report (Plan) (Approved) V2.0 07.05.25
I0196 Change Re-Plan (Approved) V1.0 02.05.25
Company Name
-
Review status