DNOs Create Export MPANs after approving G98/99 commissioning documents
Date of latest update
Type
Change
ID
R0321
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/08/2026 - the consultation is open, responses must be received by 23:59 14 September 2026.
Summary
The creation of Import Metering Points for new Premises sits with the Distribution Network Operator (DNO), while the Export Metering Points generally sit with the Electricity Supplier. When the DNO approves the G98 Engineering Recommendation Installation Document (Form B) or G99 Engineering Recommendation Installation Document (Form A3-1 or A3-2) under the Distribution Code, they could create Export Metering Points at this time (with the logical Disconnection process being available for any Export Metering Points that are then not required).
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
25 June 2027
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Schedule 27 RMP lifecycle draft V0.1
Archive
Off
Document title
Schedule 27 RMP lifecycle draft V0.2
Archive
Off
Problem Statement
The information required by the DNO to create an Export Metering Point sits with the Consumer rather than the Electricity Supplier, and leads to the Electricity Supplier acting as an unnecessary third party in the process. This is leading to unnecessary time being added to the process, negatively impacting Consumers and the journey to Net Zero. This is particularly apparent for large new housing developments, which may have several tens of thousands of Export Metering Points to create with the same DNO and require the use of the Bulk Request process. This process is cumbersome and has no two DNOs operating the process in the same way.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0321 submission form
R0321 Change Report (Proposal Plan) Approved 05.05.26
R0321 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0321 Update to Plan V1.0 approved 18.08.26
R0321 Change Report (For Consultation) approved 18.08.26
Company Name
-
Review status
Review required
Extending R0067 Refresh Functionality
Date of latest update
Type
Issue
ID
I0281
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/07/2026 - The Service Provider Impact Assessment is ongoing and expected to be completed by 07 August 2026.
Summary
CSS Market Messages sent by the Central Switching Service (CSS) to Switching Data Service Providers (SDSPs) are either not being received, being received after Gate Closure, or are being received out of the order that they were originally sent in. This Issue originally aimed to extend the Refresh functionality, implemented for the Gas Retail Data Agent (GRDA).to the Electricity Retail Data Agent (ERDA). Following solution development for I0281, it was agreed that the Refresh functionality would be made available for all Market Participants in receipt of the in-scope messages.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
CSS messages are not received by the SDSPs in the order in which they were originally sent, or after Gate Closure, so it can be difficult to detect and often requires significant manual effort to resolve. This issue can directly impact Consumer switching experiences, causing disruption and possible delays in a switch.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0281_Change Report (Update to Plan) v1.0 (Pre-approval)
I0281_Change Report (Update to Plan) v1.0 Approved 20.05.2026
Company Name
-
Review status
Review required
Schedule 27 - RMP Lifecycle 2.0
– Implemented on
Loading...
Schedule 27 - RMP Lifecycle 1.5
– Implemented on
Loading...
Sequence order of CSS00200 message
Date of latest update
Type
Issue
ID
I0204
Urgent
No
Latest Update
08/11/2024 - The Proposer has withdrawn this issue as it is being progressed under MHHS CR056. The adoption window has now closed. * This is Issue relates to the Market-wide Half Hourly Settlement design.
Summary
Empty
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
Stages Selection
Company Name
St.Clements
Review status
Review required
Introduction of SLA for Supplier De-Registration on Disconnected Meters
Date of latest update
Type
Change
ID
R0191
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
Issue has been discussed twice at RIG and has been identified via data cleanse activity. Parties identified that there are a number of meters (NG alone have 5k in this state) that are showing as terminated but an active Energy Supplier appointment. Discussion at RIG identified that REC Is potentially lacking detail/obligations/timescales on suppliers/DNOs to report/update/respond to disconnection queries.
Change Plan
Change Plan approved by Change Panel
Completed
Start:
Due:
Completion:
01 Apr 2025Presented at Change Issues Group
Completed
Start:
Due:
Completion:
03 Apr 2025Change Report (For Consultation) approved by Change Panel
Completed
Start:
Due:
Completion:
17 Jun 2025Approved at Change Panel
Completed
Start:
Due:
Completion:
05 Aug 2025Impacted Consumers
Impacted REC Documents
Status
Implementation Date
07 November 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0003 | Market-wide Half-Hourly Settlement Implementation |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0191 draft legal text for IA
Archive
Off
Document title
R0191 draft legal text for consultation - pre MHHS
Archive
Off
Document title
R0191 draft legal text for consultation - post MHHS
Archive
Off
Problem Statement
There is no time scale by which Energy Suppliers need to have submitted the Registration De-Activation Request or for electricity to have raised a query with the Distribution Network Operator (DNO) if they believe the Metering Point should not be Disconnected. This raises difficulties for the REC Performance Assurance team when monitoring and enforcing this obligation.
Stages Selection
I0191- De-energisation of disconnected meters
I0191 Change Report (Proposal Plan) V1.1 Approved 01.04.25
I0191 Consolidated Impact Assessment Responses v1.0
R0191 Change Report (For Consultation) V1.1
R0191 Consolidated Consultation Responses V1.0
R0191 Change Report (Final Recommendation) Approved 05.08.25
Company Name
REC Issues Group
Review status
Review required
Schedule 27 - RMP Lifecycle 1.2