ECOES API for Export MPAN Creation at Scale

Date of latest update
Type
Issue
ID
I0228
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/06/2026 - on 02 June 2026, the Technical Expert Panel approved via ex-committee vote to place I0228 on hold, until the outcome of R0321 is known.
Summary
Electricity Suppliers believe there is a significant bottleneck to Export Metering Point creation, which is resulting in them feeling unable to offer Export smart products to a wider audience of Consumer and scale low-carbon technology. The most effective solution is an API within the Electricity Enquiry Service (EES) that allows the Electricity Supplier to request the creation of an Export Metering Point. This could work for both Electricity Suppliers and Distribution Network Operators (DNOs) ensuring that scalable solutions are applied at both sides of the process.
Proposer
Ben Atkinson
Change Plan

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Mar 2025
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
A restriction of 50 Export Metering Points per DNO per day, with no two DNOs operating the bulk request process in the same way, is overly burdensome to Electricity Suppliers and creating a barrier for Consumers getting an Export Metering Point assigned to their Premise. This is ultimately harming the effort the reach Net Zero.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
Change Issues Group paper - presented March 2025
I0228 Change Report (Proposal Plan) V1.0 approved 21.04.26
I0228 Consolidated Information Request Responses V1.0 PUBLIC
I0228 Update to Plan V1.0 on hold, approved 04.06.26
Company Name
-
Review status
Review required

Domestic Elective HH Switching

Date of latest update
Type
Change
ID
R0227
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This change aims to remove unnecessary blocks to Consumer Switching, where a Domestic Consumer is registered as elective Half Hourly (HH) with the Losing Supplier, but the Gaining Supplier does not offer this.
Proposer
angela.joyce
Status
Implementation Date
Status Live
EMAR Version 07.11.2025_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0227 - Proposed Legal Text (IA) - Schedule 23 - Registration Services.doc
Archive
Off
Document title
I0227 Schedule 23 pre MHHS version
Archive
Off
Document title
I0227 Schedule 23 post MHHS version
Archive
Off
Problem Statement
There are issues when a Domestic Consumer intends to Switch Suppliers, but their MPAN is registered as elective HH with their current Supplier, and this is not offered by the Gaining Supplier. This can cause delays with Switching for Consumers.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Issues Proposal Form - Attachment 1. Electralink Post.docx
Issue Proposal form
I0227 - Change Report (Proposal Plan - Approved) v1.0 04.02.2025
I0227 - Consolidated Party Impact Assessment Responses (Non-Confidential) 11.04.2025
I0227 Extension to Plan V1.0 Approved 15.04.2025
R0227 Change Report (For Consultation) V1.0
R0227 Consolidated Consultation Responses v1.0
R0227 Change Report (Final Recommendation) V1.0 Approved 17.06.25
Company Name
-
Review status
Review required

ESME ID Update Rejections

Date of latest update
Type
Change
ID
R0222
Change Path
Priority
Urgent
No
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
The Electricity Smart Meter Equipment (ESME) ID is a unique identifier that provides a designation for a Smart Meter. Electricity Retail Data Agent (ERDA) systems were updated as per the requirements in R0033 to not allow for multiple incidences of an individual ESME ID to be registered, and reject the update, even when a second incidence of an ESME ID would be legitimate, for example in the case of a re-use of Metering Asset or a crossed meter. This Issue seeks to resolve this feature of the ESME ID validation while maintain data accuracy.
Proposer
Carl Carl Dennis
Impacted Consumers
Status
Implementation Date
Status Live
EMAR Version _live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0222 Data Spec DI51544 V1.0
Archive
Off
Problem Statement
ERDA data validation on the ESME ID Data Item in the D0312(MM00256) Market Message is imperfect, and can result in invalid rejections. This occurs when more than one incidence of an ESME ID is passed through individual ERDA system, as it only allows for a single occurrence, even if historic ones have been end-dated. In situations where a Metering Asset has been re-used, thus re-using the ESME ID, a rejection will occur, in an example of an unintended functionality of the validation system.
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
I0222 Change Report (Plan) (Approved) V1.0 04.02.25
I0222 Change Report (IA) (Pre-Approval) V1.0 23.04.25
R0222 Change Report (Consultation) V1.0 01.05.25
R0222 Consolidated Consultation Responses V1.0
R0222 Change Report (Post-Vote) V1.0 25.06.25
Company Name
REC Code Manager
Review status
Review required

Housekeeping Change for R0206

Date of latest update
Type
Change
ID
R0220
Change Path
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard Change Process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical, grammatical or consistency errors, and provides an opportunity to introduce necessary clarifications. This change proposal is looking to fix an error identified with R0206 Cross code change to align with BSC CP1598. BSC CP1598 was raised to add six scenario variants to four Market Messages that have been identified as missing. The REC Energy Market Data Specification contains a number of Market Message scenario variants used in BSC processes. This REC Change Proposal has been raised to align with CP1598 and ensure these scenario variants are added to the REC Data Specification. The legal text for R0206 approved at Change Panel on 15 October 2024, had a change to one of the scenario variants (SV00474) that was not clear as it was not red lined. The change was to the owner of the scenario variant from the Retail Energy Code Company (RECCo) to the Balancing and Settlement Code Company (BSCCo). The red lining for SVcccc was also incorrect as it deleted RECCo as the owner when in fact it is a new scenario variant so no previous owner. The owner as BSCCo that was approved, is correct.
Proposer
Holly Law
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R220_R0206 HK Solution Document v1.0.pdf
Archive
Off
R0220 - Housekeeping Change Report
Company Name
-
Review status
Review required

Amending contractual obligations for SIPs at Non-Domestic Premises

Date of latest update
Type
Change
ID
R0217
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 1 April Extraordinary REC Release.
Summary
The contractual obligations in section 21 of Schedule 14 are too restrictive or not relevant to Non-Domestic Premises making delivering isolators to Non-Domestic Premises more complex than it needs to be.
Proposer
Andy Knowles
Change Plan

Proposal Plan approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jan 2025

Change approved by Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Mar 2025
Status
Implementation Date
Status Live
EMAR Version 01.04.2025_live
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Non-Domestic Consumers who occupy (but do not own) a Premises with relevant permissions allowing metering work to occur are unable to contract with SIPs due to the restrictions in section 21 of Schedule 14 Metering Operations.
SIP Non-Domestic contracting red lining.docx
R0217 Change Proposal form
R0217 Change Report (Proposal Plan) V1.0 Approved 21.01.25
R0217 Change Report (For Consultation) V1.0
R0217 Consolidated Consultation Responses PUBLIC V1.0
R0217 Change Report (Final Recommendation) V1.0 Post Vote
Company Name
-
Review status
Review required

REC Changes to tie in with DCP419

Date of latest update
Type
Change
ID
R0216
Change Category
Priority
Urgent
No
Latest Update
19/01/2026 - on 19 January 2026, the Authority published their decision to reject R0216, in line with the recommendation from both the Metering Expert Panel and the Code Manager.
Summary
DCP419 is looking to place obligations on any Party or agent to update the DNO before any planned de-energisation or comms interruptions on sites with a smart meter. This is to allow DNOs to be able to manage any off supply notifications (via AD1 alerts).
Proposer
Lorna Mallon
Change Plan

Discussed at Change Issues Group

Completed

Start:

Due:

Completion:

07 Nov 2024

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

18 Feb 2025

Change Report (For Consultation) approved by MEP

Completed

Start:

Due:

Completion:

09 Jul 2025

Change Report (Final Recommendation) presented at Metering Expert Panel

Completed

Start:

Due:

Completion:

10 Sep 2025
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0216 - Schedule 14 - Metering Operations (MHHS) - v0.2 (02.07.2025)
Archive
Off
Problem Statement
DNOs may be unnecessarily contacting Consumers where an AD1 notification is generated but the Consumer is having planned works involving their Electricity Smart Meter or Communications Hub replacements for their Electricity Smart Meter. This may create a poor Consumer experience.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
DCP 419 Market Message Specification.docx
Issue Form
I0216 Change Report (Proposal Plan) v1.0 Approved 18.02.25
I0216 Solution Development Report V1.0
I0216 Consolidated Impact Assessment Responses PUBLIC v1.0
I0216 Extension to Plan V1.0 Approved 06.05.25
R0216 Extension to Plan V2.0 Approved 27.06.25
R0216 Change Report (For Consultation) V1.0 approved 09.07.25
R0216 Consolidated Consultation Responses PUBLIC V1.0
R0216 Change Report (Final Recommendation) V1.1 post vote
Ofgem decision to reject R0216
Company Name
-
Review status
Review required

Import / Export MOA Charging Clarification

Date of latest update
Type
Change
ID
R0207
Change Category
Priority
Urgent
No
Latest Update
On 07 August 2026, Ofgem approved this Change Proposal, in line with the recommendation made by the Code Manager and the Metering Expert Panel. R0207 will be implemented on 06 November 2026. Ofgem's decision can be found here: https://www.ofgem.gov.uk/publications/r0207-retail-energy-code-rec-proposed-changes
Summary
BSC Mod 459 and REC CP R0144 were raised to allow different MOAs to be appointed for the import and export MPANs on a shared meter. One of the justifications for this was to stop export suppliers being charged inflated rates. Both changes have been placed on hold due to the MHHS Programme so this change has been raised to specifically resolve the charging issue.
Proposer
Jon Hawkins
Change Report - Draft Change Report

Comments deadline
Change report - Final Change Report
Change Plan

Final recommendation to Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Mar 2025

Sent to Authority for determination

Completed

Start:

Due:

Completion:

13 Mar 2025
Impacted Consumers
Impacted REC Documents
Implementation Date
Status Live
EMAR Version 06.11.2026_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Schedule 14 - Metering Operations R0207 v0.1
Archive
Off
Document title
Schedule 14 - Metering Operations R0207 v0.2
Archive
Off
Problem Statement
Where the same electricity Metering Asset is being used for the measurement of Import and Export for more than one Metering Point, the Export MOA must be the same as the Import MOA. This may result in uncompetitive charging by the MOA, as the Export Supplier has no choice in their appointment.
Workgroup
Workgroup(s)
Change Proposal Form
R0207 - Change Report (Proposal Plan - Approved) V2.0 15.10.2024
R0207 Consolidated Impact Assessment Responses PUBLIC V1.0
R0207 Extension to Plan v1.0
R0207 Change Report (For Consultation) v1.0
R0207 Consolidated Consultation Responses PUBLIC V1.0
R0207 Change Report (Final Recommendation) V1.0 Post Vote
Authority Decision Letter - Ofgem Decision to Send Back R0207 (30.05.2025)
R0207 Revised Solution - Legal Text
R0207 Change Report (Impact Assessment) Revised Solution V2.0
Legal Drafting Revised Solution March 2026
Non Confidential consolidated impact assessment responses
R0207 Consolidated Consultation Responses (revised solution)
Authority decision to approve R0207
Company Name
Gemserv
Review status
Review required

Cross code change to align with BSC CP1598

Date of latest update
Type
Change
ID
R0206
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This Change Proposal has been raised to align with BSC CP1598, which states that six Scenario Variants of Market Messages specified within the early drafting of P375 were not progressed to the final solution of P375 and REC CP R0008.
Proposer
Lorna Mallon
Status
Implementation Date
Status Live
EMAR Version 08.11.2024_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0206 Solution Document v1.0
Archive
Off
Problem Statement
As these Scenario Variants are not captured in the Data Specification, the relevant Market Participants won’t be able to use the Data Transfer Network (DTN) to exchange the relevant data, which would result in them having to use a less secure mechanism to send and receive data. This means the original intent of Elexon Modification P375 has yet to be achieved as not all Market Message changes have been implemented.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0206 - Change Proposal Form
CP1598-Proposal-Form-A-Amending-the-EMDS-to-add-missing-Scenario-Variants-for-P375-v1.0.pdf
CP1598-Attachment B-EMDS changes_v1.0 (1).docx
CP1598_CPC-CP-Consultation-Responses-v1.0.pdf
CP1598 CP Consultation v1.0.pdf
R0206 Change Report (Proposal Plan) V1.0
R0206 Change Report (For Consultation) V1.0
R0206 Consolidated Consultation Responses
R0206 Change Report (Final Recommendation - Approved) V2.0 15.10.2024
Company Name
-
Review status
Review required

Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches

Date of latest update
Type
Change
ID
R0205
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
As part of the MHHS REC code change activity, a change has been made to REC Schedule 30 to remove the half hourly meter exemption from the Erroneous Transfer provisions. Whilst this is necessary from an MHHS perspective with all sites becoming half hourly settled, the application of ET obligations in the Advanced Meter segment creates some additional challenges. To be able to accurately bill an Advanced Meter site, following repatriation of that customer to their correct supplier after an ET has been raised / agreed, the supplier needs to have access to half hourly consumption data for the ET period when they were not the registered supplier. With ETs potentially taking up to 2 years to be identified and resolved, the only place that the supplier could reliably source that HH consumption data would be from the other (losing) supplier.
Proposer
Ben Atkinson
Change Report - Draft Change Report
Change report - Final Change Report
Change Plan

Change Proposal Plan to REC Change Panel

Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches > Change Plan

Start:

22 Aug 2024

Due:

01 Apr 2025

Completion:

01 Apr 2025

Discussion at REC Change Issues Group

Provision of Half-Hourly Consumption Data for Advanced Meter Erroneous Switches > Change Plan

Start:

01 Apr 2025

Due:

05 Jun 2025

Completion:

Impacted Consumers
Status
Implementation Date
Status Live
EMAR Version 07.11.2025_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Date of Update to Priority
Solution Development
Proposed solution summary
  1. An approval of this Issue/Change Proposal would see an obligation placed upon the Losing Supplier, following a successful Erroneous Switch repatriation, to provide the Gaining Supplier with the Half-Hourly consumption data for the period in which they were erroneously supplying the meter.
  2. Half-Hourly consumption data would be providing to the Gaining Supplier, from the Losing Supplier, via SDEP using an Excel template within 5 Working Days of the Erroneous Switch repatriation switch date. The Gaining Supplier would be required to provide 48 Half-Hourly consumption intervals for each that the the Consumer was supplied by the erroneously Gaining Supplier.
Proposed Solution Document
Document title
I0205 - Draft Legal Text (Schedule 30) - for Party Impact Assessment 10.06.2025
Archive
Off
Document title
I0205 - Draft Reporting Templates
Archive
Off
Document title
I0205 - Impact Assessment
Archive
Off
Document title
R0205 - Schedule 30 Legal Drafting 15.08.2025
Archive
Off
Document title
R0205 - Advanced Meter Half-Hourly Consumption Data Sharing Template
Archive
Off
Problem Statement
In the absence of having Half-Hourly consumption data for Erroneously Switched Consumers, Energy Suppliers are currently required to estimate consumption for billing purposes that can lead to inaccurate billing.
I01205 - Change Proposal Form
I0205 - Change Report (Proposal Plan) V1.0 Approved (01.04.2025)
I0205 Consolidated Impact Assessment Responses V1.0 (Non-Confidential) 30.07.2025
R0205 - Consolidated Consultation Responses (09.09.2025)
R0205 Change Report (Final Recommendation) V2.0 (Approved) 16.09.2025
Company Name
Centrica
Review status
Review required

Performance Assurance Report Catalogue Updates (MHHS)

Date of latest update
Type
Change
ID
R0202
Change Category
Change Path
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
This change seeks to update the Performance Assurance Reporting Catalogue (PARC) to capture data items required to continue to appropriately monitor Retail Risks under Market-wide Half Hourly Settlement (MHHS) industry arrangements. Some housekeeping changes, for the PARC, have also been included in this change.
Proposer
Andrew Waghorn
Change Plan

Proposal Plan approved

Completed

Start:

08 Aug 2024

Due:

03 Sep 2024

Completion:

03 Sep 2024

Party impact assessment completed

Completed

Start:

03 Sep 2024

Due:

04 Oct 2024

Completion:

04 Oct 2024

Change Report approved for Consultation

Completed

Start:

04 Oct 2024

Due:

25 Mar 2025

Completion:

25 Mar 2025

Consultation completed

Completed

Start:

25 Mar 2025

Due:

15 Apr 2025

Completion:

15 Apr 2025

RECPAB Voting

In Progress

Start:

15 Apr 2025

Due:

29 Apr 2025

Completion:

Status
Implementation Date
Status Live
EMAR Version 27.06.2025_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
03 RECPAB_24_0827_04E Draft changes to the PARC for MHHS (27.08.2024)
Archive
Off
Document title
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only (18.03.2025)
Archive
Off
Document title
R0202 RECPAB_23_PARC V5.2 - REDLINE MHHS - MEM only APPROVED 29.04.2025
Archive
Off
Problem Statement
The PARC currently does not capture all the data items required to support the monitoring of Retail Risks following Market-wide Half Hourly Settlement go-live. An update to the PARC is required to include the data items that will ensure the Code Manager can provide the assurance the industry requires during transition and under the new MHHS arrangements.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
RECPAB_23_Performance Assurance Report Catalogue V5.2 - REDLINE.xlsx
R0202 - PARC Updates (MHHS) (CP Form)
R0202 Change Proposal Re-Plan v1.0 31.10.24
R0202 Change Report (Proposal Plan) v2.0 (Approved) 03.09.2024
R0202 Change Proposal Re-Plan V2.0 (Approved) 20.03.2025
R0202 Change Report (Consultation) v1.0 (Approved) 25.03.2025
R0202 Consolidated Consultation Responses V1.1 (22.04.2025)
R0202 Change Report (Final Recommendation) (Post-Vote) v2.0
Company Name
-
Review status
Review required