Non-Domestic Change of Occupier SDEP Screens (R0155 Solution)

Date of latest update
Type
Change
ID
R0232
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This Issue has been raised to develop the dedicated Non-Domestic Change of Occupier SDEP screens that were not possible as part of R0155 – Change of Occupier: Evidentiary Standards and Timescales. Should this Issue progress with a developed solution, the new dedicated Non-Domestic Change of Occupier screens would replace the temporary work around provided as a temporary workaround in the R0155 solution.
Proposer
lorna.mallon_sYHth
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 07.11.2025_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Date of Update to Priority
Solution Development
Proposed solution summary
  1. The solution will be developed through the Change Issues Group. Attendees will be invited to discuss and determine the requirements for the dedicated Non-Domestic Change of Occupier SDEP screens (a separate screen will be required for both Gas and Electricity). The solution will also require reporting for Performance Assurance and will include a plan for queries raised at cut over and data retention obligations. To help drive those discussions a starting point could be as follows: • Meter Point X Number (MPxN) • Multi MPxN flag – i.e. are there more than one • Date of CoO • Number of attachments • Accept evidence - Y / N – only available to the receiving supplier • Additional info – must be populated if N Auto populate: • Date of creation, date of response. • The Service Level Agreement (SLA) is 10 Working Days so it will need the RAG status based on that. Escalations screens – as per the standard REC escalations – including MPxN, date of creation and number of attachments. As part of any solution, the Code Manager will also update the non-mandatory Non-Domestic Change of Occupier Guidance Document to include further details on the newly dedicated SDEP screens, as well as further training material for Energy Suppliers.
Problem Statement
Due to the MHHS Code Freeze, newly dedicated Non-Domestic Change of Occupier SDEP screens could not be implemented as part of the R0155 solution and instead the use of re-purposed, existing screens was proposed as a temporary workaround. Energy Suppliers were clear in their responses to the R0155 impact assessment and consultation that using a temporary work around (with the temporary solution being the use of existing screens PT0056 and PT0067) would create additional workload and risk and that newly dedicated SDEP screens for Non-Domestic Change of Occupiers would still be required.
SME
SME Role
Lead Technical Analyst
I0232 - Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) - Issue form
I0232 - Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) - Change Report (Proposal Plan) V2.0 (17.06.2025)
I0232 - Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) - Change Report (Impact Assessment) 13.03.2025
R0232 - Non-Domestic Change of Occupier SDEP Screens (R0155 Solution) - Change Report (For Consultation) 05.08.2025
I0232 - Consolidated Impact Assessment Responses (Non-Confidential) 08.04.2025
R0232 - Non-Confidential Consolidated Consultation Responses (02.09.2025)
R0232 - Change Report (Final Recommendation) V2.0 (Approved) 16.09.2025
SDEP User Training Deck v2.0
I0232 - Extension to Plan V1.0 (06.06.2025) Approved
Company Name
-
Review status
Review required

Domestic Elective HH Switching

Date of latest update
Type
Change
ID
R0227
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This change aims to remove unnecessary blocks to Consumer Switching, where a Domestic Consumer is registered as elective Half Hourly (HH) with the Losing Supplier, but the Gaining Supplier does not offer this.
Proposer
angela.joyce
Status
Implementation Date
Status Live
EMAR Version 07.11.2025_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0227 - Proposed Legal Text (IA) - Schedule 23 - Registration Services.doc
Archive
Off
Document title
I0227 Schedule 23 pre MHHS version
Archive
Off
Document title
I0227 Schedule 23 post MHHS version
Archive
Off
Problem Statement
There are issues when a Domestic Consumer intends to Switch Suppliers, but their MPAN is registered as elective HH with their current Supplier, and this is not offered by the Gaining Supplier. This can cause delays with Switching for Consumers.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Issues Proposal Form - Attachment 1. Electralink Post.docx
Issue Proposal form
I0227 - Change Report (Proposal Plan - Approved) v1.0 04.02.2025
I0227 - Consolidated Party Impact Assessment Responses (Non-Confidential) 11.04.2025
I0227 Extension to Plan V1.0 Approved 15.04.2025
R0227 Change Report (For Consultation) V1.0
R0227 Consolidated Consultation Responses v1.0
R0227 Change Report (Final Recommendation) V1.0 Approved 17.06.25
Company Name
-
Review status
Review required

Clarification on TDIS portfolio transfers on sale

Date of latest update
Type
Change
ID
R0225
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
The current wording of the Energy Theft Reduction Schedule has wording on the transfer of theft targets on portfolio sale, however which sales would qualify is ambiguous.
Proposer
Anton Moden
Change Plan

Change Plan at Change Panel

Clarification on TDIS portfolio transfers on sale > Change Plan

Start:

27 Nov 2024

Due:

21 Jan 2025

Completion:

21 Jan 2025

Change Report (Consultation) to Change Panel

In Progress

Start:

21 Jan 2025

Due:

04 Feb 2025

Completion:

Status
Implementation Date
Status Live
EMAR Version 27.06.2025_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
florentina.monea
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0225 - Legal Drafting
Archive
Off
Document title
Schedule 7 Energy Theft Reduction (based on v3.0) Legal Drafting
Archive
Off
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Change/ Issue form
I0225 - Change Report - Proposal Plan (Approved 21/01/2025)
R0225 Change Report (Consultation)
R0225 Consolidated Consultation Responses
R0225 Change Report (Final) Post-vote
Company Name
-
Review status
Review required

Reconciliation of Unallocatable Transactions Review

Date of latest update
Type
Change
ID
R0223
Change Category
Change Path
Priority
Urgent
No
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
The process for Reconciliation of Unallocatable Transactions is set out in Section 10 of Schedule 11. During the most recent reconciliation delivery (the gas process from July 2024) several areas of improvement were identified, critically a lack of clarity regarding historic Supplier Licences and how to include or exclude them from the calculations. The Code Manager believes that this lack of clarity and past precedent would lead to material impact on one or more Party.
Proposer
helen.fosberry_e0pk4
Change Plan

Findings from Information Request were presented at Change Issues Group

Completed

Start:

Due:

Completion:

06 Feb 2025
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version _live
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Date of Update to Priority
Solution Development
Proposed solution summary
  1. A review of the process with specific regard to: - Clarity within the process regarding historic Supplier Licences - Alignment between fuels - Re-introducing an independent audit.
Proposed Solution Document
Document title
Schedule 11 - Prepayment Arrangements (I0223 - Party Impact Assessment) 05.06.2025
Archive
Off
Document title
Extract - Schedule 11 - Prepayment Arrangements (I0223 - Party Impact Assessment) 05.06.2025
Archive
Off
Document title
Schedule 11 - Prepayment Arrangements (R0223 - Consultation) 24.07.2025
Archive
Off
Document title
Extract - Schedule 11 - Prepayment Arrangements (R0223 - Consultation) 24.07.2025
Archive
Off
Document title
Schedule 11 - Prepayment Arrangements (R0223 - Final Recommendation) 18.08.2025
Archive
Off
Document title
Extract - Schedule 11 - Prepayment Arrangements (R0223 - Final Recommendation) 18.08.2025
Archive
Off
Problem Statement
During the most recent reconciliation delivery (the gas process from July 2024) several areas of improvement were identified, critically a lack of clarity regarding historic Supplier Licences and how to include or exclude them from the calculations.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0223 - Submission Form
I0223 - Information Request Responses
I0223 - Change Report (Proposal Plan) V2.0 (Approved) 20.05.2025
I0223 - Proposal Plan Update V1.0 (Approved) 20.05.2025
I0223 - Change Report (Impact Assessment) V1.0 (06.06.2025)
I0223 - Party Impact Assessment Consolidated Responses V1.0 (11.07.2025)
R0223 - Change Report (For Consultation) V1.0 (24.07.2025)
R0223 - Change Report (Final Recommendation) V2.0 (Approved) 02.09.2025
Company Name
-
Review status
Review required

ESME ID Update Rejections

Date of latest update
Type
Change
ID
R0222
Change Path
Priority
Urgent
No
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
The Electricity Smart Meter Equipment (ESME) ID is a unique identifier that provides a designation for a Smart Meter. Electricity Retail Data Agent (ERDA) systems were updated as per the requirements in R0033 to not allow for multiple incidences of an individual ESME ID to be registered, and reject the update, even when a second incidence of an ESME ID would be legitimate, for example in the case of a re-use of Metering Asset or a crossed meter. This Issue seeks to resolve this feature of the ESME ID validation while maintain data accuracy.
Proposer
Carl Carl Dennis
Impacted Consumers
Status
Implementation Date
Status Live
EMAR Version _live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0222 Data Spec DI51544 V1.0
Archive
Off
Problem Statement
ERDA data validation on the ESME ID Data Item in the D0312(MM00256) Market Message is imperfect, and can result in invalid rejections. This occurs when more than one incidence of an ESME ID is passed through individual ERDA system, as it only allows for a single occurrence, even if historic ones have been end-dated. In situations where a Metering Asset has been re-used, thus re-using the ESME ID, a rejection will occur, in an example of an unintended functionality of the validation system.
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Issue Proposal Form
I0222 Change Report (Plan) (Approved) V1.0 04.02.25
I0222 Change Report (IA) (Pre-Approval) V1.0 23.04.25
R0222 Change Report (Consultation) V1.0 01.05.25
R0222 Consolidated Consultation Responses V1.0
R0222 Change Report (Post-Vote) V1.0 25.06.25
Company Name
REC Code Manager
Review status
Review required

Amending contractual obligations for SIPs at Non-Domestic Premises

Date of latest update
Type
Change
ID
R0217
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 1 April Extraordinary REC Release.
Summary
The contractual obligations in section 21 of Schedule 14 are too restrictive or not relevant to Non-Domestic Premises making delivering isolators to Non-Domestic Premises more complex than it needs to be.
Proposer
Andy Knowles
Change Plan

Proposal Plan approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jan 2025

Change approved by Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Mar 2025
Status
Implementation Date
Status Live
EMAR Version 01.04.2025_live
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Non-Domestic Consumers who occupy (but do not own) a Premises with relevant permissions allowing metering work to occur are unable to contract with SIPs due to the restrictions in section 21 of Schedule 14 Metering Operations.
SIP Non-Domestic contracting red lining.docx
R0217 Change Proposal form
R0217 Change Report (Proposal Plan) V1.0 Approved 21.01.25
R0217 Change Report (For Consultation) V1.0
R0217 Consolidated Consultation Responses PUBLIC V1.0
R0217 Change Report (Final Recommendation) V1.0 Post Vote
Company Name
-
Review status
Review required

Schedule 30 Switch Meter Reading Problems - Rejections and Timings

Date of latest update
Type
Change
ID
R0215
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
The Switch Meter Reading Problems processes do not appropriately describe the use of rejections. This inhibits Parties from operating the process as intended and may cause unnecessary delay to the production of an accurate and agreed Switching Meter Reading. Additionally, the Performance Assurance Reporting Catalogue (PARC) is missing key data items to allow Performance Assurance to more accurately assure Party performance against Risk Drivers 5.6 and 5.8. Rejection reasons do not appear to be being reviewed, nor are they understood to be end statuses for the process.
Proposer
carl.dennis
Status
Implementation Date
Status Live
EMAR Version 07.11.2025_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0215 Schedule 30 v0.1
Archive
Off
Document title
I0215 Schedule 30 v0.1 - pre MHHS version
Archive
Off
Document title
I0215 Schedule 30 v0.1 - post MHHS version
Archive
Off
Problem Statement
Suppliers may interact with the Missing Switch Read process in a way that is operationally standard for them, but not reflected in the Code. This means that the D0300 or SAR may either be escalated unnecessarily (including Performance Assurance checks), or may not be responded to, whilst still resolving the overall issue.
SME
SME Role
Lead Assurance Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
RECRIG_24_0308 - Meeting Notes.pdf
Change Issue Proposal Form
RECRIG_24_0614 - Meeting Notes.pdf
I0215 Change Report (Plan) (Approved) V1.0 17.12.24
I0215 Rebaselined Plan v1.0 Approved 25.03.25
I0215 Consolidated Impact Assessment Responses v1.0
R0215 Change Report (For Consultation) V1.0
R0215 Consolidated Consultation Responses v1.0
R0215 Change Report (Final Recommendation) V1.0 Approved 17.06.25
Company Name
-
Review status
Review required

Evolution of the CRS Performance Charge

Date of latest update
Type
Change
ID
R0210
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 28 February 2025.
Summary
R0025 established a new performance charge for DCC, which linked its performance against its Service Definition with financial incentives. During the R0025 PAB members noted the need to further develop the methodology, including reviewing it periodically. The RPA has worked with the PAB to develop proposals to enhance the performance charge.
Proposer
Anton Moden
Status
Implementation Date
Status Live
EMAR Version 28.02.2025_live
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Proposed Solution - Draft Schedule 6 - Performance Assurance
Archive
Off
Document title
R0210 - Legal text for consultation 17.10.24
Archive
Off
Document title
R0210 - Legal Text - Post-Consultation 18.11.24
Archive
Off
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
RECPAB_24_0625_05 - Evolution of CRS Performance Charge.docx
CP form
R0210 Change Report V1.0 01.10.24
R0210 Consolidated Consultation Responses
R0210 Change Report (for Consultation)
R0210 Change Report (Pre-Vote) V1.0 18.11.24
R0210 Change Report (Post-Vote) V1.0 26.11.24
Company Name
-
Review status
Review required

Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements

Date of latest update
Type
Change
ID
R0209
Change Category
Urgent
No
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
This Authority Change Proposal was raised by Ofgem pursuant to the Electricity Settlement Reform SCR. It will ensure that the appropriate obligations, processes and provisions for the new MHHS arrangements, which have been developed and consulted on as part of the MHHS Programme, are introduced into the REC.
Proposer
Jenny Boothe
Change Plan

Proposal Plan approved

Completed

Start:

05 Sep 2024

Due:

17 Sep 2024

Completion:

17 Sep 2024

Consultation published

Completed

Start:

17 Sep 2024

Due:

18 Sep 2024

Completion:

18 Sep 2024

Consultation closed

In Progress

Start:

18 Sep 2024

Due:

09 Oct 2024

Completion:

Final Recommendation Vote

Not Started

Start:

09 Oct 2024

Due:

05 Nov 2024

Completion:

Issued for Authority Determination

Not Started

Start:

05 Nov 2024

Due:

07 Nov 2024

Completion:

Status
Implementation Date
Status Live
EMAR Version _live
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
Harriet Truss
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
EMDS HTML vMHHS 1.2
Archive
Off
Document title
I0241 MHHS Incremental Changes for go live
Archive
Off
Document title
R0209 - Solution Development Report 24.10.2024
Archive
Off
Document title
R0209 - Legal Text 24.10.2024
Archive
Off
Document title
R0209 - Solution Development Report 10.09.24
Archive
Off
Document title
R0209 - Legal Text 100924
Archive
Off
Document title
Finalisation of code artefacts - MHHS programme
Archive
Off
Problem Statement
Changes are required to the REC, to ensure that the appropriate obligations, processes and provisions are defined within the REC at MHHS go-live, to enable the successful transition to the enduring governance and operational arrangements developed as part of the MHHS Programme.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
R0209 - Downloadable Submission Form
Authority Led SCR REC Change Proposal on the MHHS arrangements - letter to REC Panel Chair.pdf
R0209 Change Report (Consultation) v2.0 18.09.2024.pdf
R0209 Consolidated Consultation Responses v1.0 24.10.2024
R0209 Change Report (Post-Vote) v2.0 05.11.2024
R0209 Implementation of MHHS Arrangements approval letter 26112024
Company Name
-
Review status
Review required

Adding the DIP Rules to the Cross Code Steering Group Terms of Reference

Date of latest update
Type
Change
ID
R0208
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented on 28 February 2025.
Summary
The Data Integration Platform (DIP) will take on a key role within the electricity industry so the DIP Manager, as the Code Manager equivalent organisation responsible for the DIP and associated DIP Rules, needs to be recognised as a Cross Code Steering Group (CCSG) member.
Proposer
Lorna Mallon
Change Plan

Proposal Plan approved

Completed

Start:

29 Aug 2024

Due:

01 Oct 2024

Completion:

01 Oct 2024

Consultation published

Completed

Start:

01 Oct 2024

Due:

04 Oct 2024

Completion:

01 Oct 2024

Change Report - Final Recommendation

Completed

Start:

04 Oct 2024

Due:

21 Nov 2024

Completion:

22 Nov 2024
Status
Implementation Date
Status Live
EMAR Version 28.02.2025_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Draft CCSG - Terms of Reference
Archive
Off
Problem Statement
The current CCSG Terms of Reference (ToR) do not recognise the role of the DIP Manager introduced as part of the MHHS Programme.
Change Proposal Form
R0208 - Change Report 1.0 (Consultation) 01.10.2024
R0208 Consolidated Consultation Responses
R0208 - Change Report 1.0 (Post Vote)
Company Name
Gemserv
Review status
Review required