Enabling Dual MSA & MSS (SVA MOA) appointments for WC connection types

Date of latest update
Type
Change
ID
R0342
Other Industry Codes impacted
Urgent
No
Latest Update
13/08/2026 - accepted in by Code Manager
Summary
Under the legacy/pre-MHHS arrangements the market is segmented by Measurement Class (MC) for settlement purposes which is not sensitive to the Meter type that is installed or is to be installed, meaning that the replacement of Traditional meters to either smart or Advanced metering equipment can be arranged without the need for the Change of Measurement Class (CoMC) process to be conducted concurrent with the meter exchange (MEX). Under MHHS, when a WC connection goes through a MEX from Traditional to Advanced, or from Advanced to Smart in the MHHS arrangements a new complexity is placed on suppliers because the CoSeg process must be tightly co-ordinated to a specified planned MEX date and processed through the MPRS within 3 Working Days of that date.
Proposer
Lee Stone
Impacted REC Documents
Impacted REC Parties and Market Participants
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
R0342 submission form
Company Name
-
Review status
Review required

Improved Validation for DI51599 - Electricity Smart Meter Equipment (ESME ID)

Date of latest update
Type
Issue
ID
I0341
Priority
Urgent
No
Latest Update
13/08/2026 - accepted in by Code Manager
Summary
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service.
Proposer
Daniel Tadecicco
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
I0341 submission form
Company Name
-
Review status
Review required

REC Change to align with BSC CP Clarify Supplier obligations for IF-002 messages where a Switch is cancelled

Date of latest update
Type
Change
ID
R0339
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
06/08/2026 - Change Proposal accepted in by Code Manager
Summary
A BSC CP has been raised to clarify Supplier obligations for IF-002 messages where a Switch is cancelled. This obligation is also in REC Schedule 14 Metering Operations, so a REC change is required or the obligation remains in place.
Proposer
Caroline Freimuller
Impacted REC Documents
Impacted REC Parties and Market Participants
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
R0339 submission form
Company Name
-
Review status
Review required

REC Change to align with CP1633 Capture Modem Module Details Under BSCP601

Date of latest update
Type
Issue
ID
I0338
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
06/08/2026 - Issue accepted in by the Code Manager
Summary
BSC CP1633 “Capture Modem Module Details Under BSCP601” makes amendments to BSCP601 Metering Protocol Approval and Compliance Testing. One of the amendments places obligations on MOAs where they are introducing and amending Communications Equipment. Equivalent and potentially expanded obligations need to be placed within REC Schedule 14 Metering Operations to support this.
Proposer
Lee Walker
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
I0338 submission form
Company Name
-
Review status
Review required

Introduction of Sweet Treat Reward System

Date of latest update
Type
Change
ID
R9999
Change Category
Priority
Urgent
Yes
Latest Update
Consultation issued June 29th
Summary
This proposal introduces a formalised “Sweet Treat Reward System” within the REC governance framework, whereby participants are recognised with confectionery based incentives for timely delivery, high quality submissions, and proactive engagement in the change process. The change aims to improve stakeholder participation, reduce consultation fatigue, and enhance overall delivery performance by introducing a light-touch behavioural incentive aligned to existing governance activities.
Proposer
Mark Pearce
Impact Status
Impacted Consumers
Impacted REC Documents
Implementation Date
Status Scheduled
EMAR Version 4.1.0_Live

Documents

Name Version Last updated Actions
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Linked to SDS Delivery
No
Lead Analyst
Dave Jones
Date of Update to Priority
Solution Development
Proposed solution summary
The proposed solution is to introduce a new REC provision establishing a “Sweet Treat Reward System” (STRS), creating a light-touch, non-financial incentive mechanism linked to existing change process activities. This would require updates to REC governance documentation (e.g. Change Management schedule and supporting guidance) to define eligibility criteria, reward thresholds, and roles, with the Code Manager responsible for administering and maintaining the scheme and recording outcomes within the REC Portal. End-to-end, the solution would operate by linking stakeholder behaviours (e.g. timely consultation responses, active participation in CIG discussions, and high-quality submissions) to predefined reward triggers. The REC Portal would be enhanced to capture participation metrics, calculate eligibility, and notify participants of earned rewards via automated communications (e.g. portal notifications or email), with a monthly or milestone-based cadence. Data flows would include submission timestamps, attendance records, and qualitative assessment inputs from the Code Manager or Change Leads, which would be consolidated into a “Reward Eligibility Log” maintained within REC systems. Implementation would be led by the Code Manager, supported by the DSP for system changes and reporting capability, and overseen by REC governance bodies to ensure alignment with existing obligations and neutrality principles. The solution would not alter core decision-making processes but would overlay an engagement-focused mechanism, with clear accountability for administration, auditability of outcomes, and periodic review to ensure continued effectiveness and proportionality.
Problem Statement
The REC change process currently relies on formal obligations and voluntary participation to secure stakeholder engagement; however, this approach does not consistently drive timely, high-quality input during key stages such as consultations and working groups. As a result, participation can be delayed, inconsistent, or limited in substance, reducing the effectiveness of impact assessments and slowing overall change delivery.
In the absence of any positive reinforcement mechanisms, the process places full reliance on compliance rather than motivation, which may not fully reflect the human factors influencing engagement. This creates a persistent gap between the intended collaborative nature of the REC and the reality of stakeholder behaviour, ultimately affecting the pace and quality of change outcomes delivered to the market.
Workgroup
Workgroup(s)
Review status
Reviewed - Accepted

Regulatory Alliance Creation Rejections

Date of latest update
Type
Issue
ID
I0331
Change Category
Change Path
Priority
Urgent
No
Latest Update
19/08/2026 - the Change Report (Proposal Plan) was approved by Change Panel. The Change Team and Performance Assurance team are working together to determine if there are performance assurance requirements for this change.
Summary
An incident where Network Parties did not submit Regulatory Alliances on time to the Central Switching Service (CSS) Provider, or did submit the Regulatory Alliances but did not action rejections from the CSS Provider in a timely manner, led to over 200 Consumers being delayed in Switching to their chosen Energy Supplier. This Change Proposal has been raised to review this process.
Proposer
abedapatel
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0331 Schedule 24 Switching Data Management
Archive
Off
Problem Statement
The lack of Service Level Agreements (SLAs) on Network Parties to submit Regulatory Alliances to the CSS Provider or to work any rejections received from the CSS Provider can lead to delays in Consumers being able to Switch to their chosen Energy Supplier.
SME
SME Role
Lead Assurance Analyst
I0331 submission form
I0331 Change Report (Proposal Plan) V1.0 approved 18.08.26
Company Name
-
Review status
Review required

Removal of D0383 & D0384 requirements from Sharing MTDs process

Date of latest update
Type
Change
ID
R0328
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
14/08/2026 - the consultation has opened, responses must be received by 23:59 07 September 2026.
Summary
Schedule 14 - Metering Operations currently holds obligations for a Meter Operator Agent (MOA) to send a D0383 ‘Notification of Commissioning Information’ to Electricity Suppliers, Distribution Network Operators (DNOs), Data Services and Data Collectors in certain process steps. The D0383 was not shared with these Parties in legacy arrangements, and there is no requirement for it to be sent to facilitate the MHHS arrangements. There are similar requirements to send the D0384 ‘Notification of Commissioning Status’ to these Parties, when it is only required by the Electricity Supplier. These requirements were introduced by the MHHS Design in error and need to be removed.
Proposer
Harriet Truss
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 06.11.2026_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0328 legal text V0.1
Archive
Off
Problem Statement
Schedule 14 - Metering Operations puts obligations on MOAs which are both not required and impossible to fulfil (as the Scenario Variants to send the D0383 from the MOA to the Electricity Supplier, DNO, Data Service and Data Collector do not exist). There are similar problems for the D0384, which is only required to be sent from the MOA to the Electricity Supplier.
R0328 submission form
R0328 Change Report (Proposal Plan) v1.0 - approved 21.07.26
R0328 Change Report (For Consultation) V1.0 approved 12.08.26
Company Name
-
Review status
Review required

Post-MHHS Full Transition Complete (M15) REC updates

Date of latest update
Type
Issue
ID
I0325
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/07/2026 - On 21 July 2026, the REC Change Panel voted to approve the Change Report (Proposal Plan) for I0325.
Summary
The REC was updated, primarily through R0209 and R0241, to add requirements that support the transition to, and enduring operation of the MHHS arrangements. As part of the transition, each impacted Metering Point will be migrated using processes defined in Codes, including the REC. Once this migration activity is complete, the legacy and transitional arrangements will become redundant and should be removed from the REC to support its efficient operation
Proposer
Jonny Moore
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Retention of redundant obligations within the REC would make it more complex to navigate for Market Participants and could cause confusion on the obligations that are in effect to support the efficient operation of the Great British Energy retail market. It is also worth noting that until Ofgem formally closes the MHHS Significant Code Review (SCR), this REC Issue could potentially impact that SCR.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0325 submission form
I0325 Scope list
Company Name
-
Review status
Review required

Introduction of Consumer Consent Solution

Date of latest update
Type
Issue
ID
I0318
Change Category
Priority
Urgent
No
Latest Update
22/04/2026 - The Change Report (Proposal Plan) was approved by Change Panel on 21/04/2026.
Summary
This initiative will support the transformation of how energy is managed and consumed by giving consumers control over their energy (gas, electricity, heat, or other) data, enabling innovation through third-party services, and advancing sustainability goals. This REC Issue is being raised to promote visibility and awareness of opportunities for engagement, in advance of the CCS Change Proposal being progressed.
Proposer
consumerconsent
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
RECCo | Consumer Consent Programme page
Archive
Off
Document title
Consumer Consent Hub - REC Portal
Archive
Off
Document title
Consumer Consent Solution Design Consultation (March 2026)
Archive
Off
Document title
RECCo's response to the CCS Design Consultation - 28 May 2026
Archive
Off
Problem Statement
A new set of arrangements for a Consumer Consent Solution (CCS) is currently being developed under the RECCo CCS project. The new arrangements will need to be implemented within the REC so that they can be governed under the REC on an enduring basis.
I0318 submission form
RECCHIG_26_0305 - I0318 Consumer Consent Solution
I0318 Change Report (Proposal Plan) v1.0 APPROVED 02.04.2026
Company Name
-
Review status
Review required

Number of Displayed Register Digits Data Item linkage

Date of latest update
Type
Change
ID
R0317
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/05/2026 - The appeal window has now closed. This Change will be implemented on 6 November 2026.
Summary
A Data Integration Platform (DIP) Data Item, DI-091 ‘Number of Displayed Register Digits’ that was implemented as part of MHHS has been incorrectly linked to the existing J0478 ‘Number of Register Digits’ in the Energy Market Data Specification, instead of the existing J2313 ‘Number of Displayed Register Digits’.
Proposer
Harriet Truss
Change Report - Initial Assessment and Change Plan Report
Change report - Final Change Report
Implementation Date
Status Live
EMAR Version 06.11.2026_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. The proposed solution is to conduct a correction exercise to unlink the DIP Data Item DI-091 ‘Number of Displayed Register Digits’ from the Data Item J0478 and it should then instead be linked to the Data Item J2313.
Proposed Solution Document
Document title
R0317 Draft Legal Text 23.02.2026.zip
Archive
Off
Document title
R0317_Draft Legal Text (For Consultation)_v0.2
Archive
Off
Document title
R0317_Draft Legal Text (For Final Recommendation)_v1.0
Archive
Off
Problem Statement
A linkage error has been identified as part of BSC CP1622 and REC Change Proposal R0300 where the DIP Data Item DI-091 has been incorrectly linked to the existing J0478 ‘Number of Register Digits’ in the EMDS at MHHS Go-Live, instead of the existing J2313 ‘Number of Displayed Register Digits’. As a result, contrary to the MHHS design and intended linkage, the EMDS incorrectly details the DI-091 in DIP interfaces, including the IF-005 and IF-006 (both REC-owned) and several other DIP Interfaces, even though the DIP reference appears correct (DI-091). It is important that EMDS is an accurate reflection of Market Messages and Data Items. Without correction this Issue may cause issues to future market entrants.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0317 submission form
R0317_Consolidated Consultation Responses_PUBLIC
R0317_Change Report (Final Recommendation) v1.0 Approved 27.05.26
Company Name
-
Review status
Review required