Farooq change proposal 1

Date of latest update
Type
Change
ID
R10001
Change Category
Change Path
Priority
Urgent
No
Latest Update
dsf fdsfdsfdfdfdsf dfdfdsfds
Summary
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Negat esse eam, inquit, propter se expetendam. Primum Theophrasti, Strato, physicum se voluit; Id mihi magnum videtur. Itaque mihi non satis videmini considerare quod iter sit naturae quaeque progressio. Quare hoc videndum est, possitne nobis hoc ratio philosophorum dare. Est enim tanti philosophi tamque nobilis audacter sua decreta defendere.
Proposer
Farooq Ahmad Salmani
Impacted REC Parties and Market Participants
Implementation Date
Status Live
EMAR Version 07.11.2025_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
Fuel
REC Decision Maker
Linked to SDS Delivery
No
Lead Analyst
Jemma Johnson
Date of Update to Priority
Solution Development
Proposed solution summary
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Negat esse eam, inquit, propter se expetendam. Primum Theophrasti, Strato, physicum se voluit; Id mihi magnum videtur. Itaque mihi non satis videmini considerare quod iter sit naturae quaeque progressio. Quare hoc videndum est, possitne nobis hoc ratio philosophorum dare. Est enim tanti philosophi tamque nobilis audacter sua decreta defendere.
Problem Statement
dvdfg gdfgfgfdgdfg
Workgroup
Workgroup(s)
Company Name
Loremipsum
Review status
Review required

Post-MHHS Full Transition Complete (M15) REC updates

Date of latest update
Type
Issue
ID
I0325
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/07/2026 - On 21 July 2026, the REC Change Panel voted to approve the Change Report (Proposal Plan) for I0325.
Summary
The REC was updated, primarily through R0209 and R0241, to add requirements that support the transition to, and enduring operation of the MHHS arrangements. As part of the transition, each impacted Metering Point will be migrated using processes defined in Codes, including the REC. Once this migration activity is complete, the legacy and transitional arrangements will become redundant and should be removed from the REC to support its efficient operation
Proposer
Jonny Moore
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Retention of redundant obligations within the REC would make it more complex to navigate for Market Participants and could cause confusion on the obligations that are in effect to support the efficient operation of the Great British Energy retail market. It is also worth noting that until Ofgem formally closes the MHHS Significant Code Review (SCR), this REC Issue could potentially impact that SCR.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0325 submission form
I0325 Scope list
Company Name
-
Review status
Review required

Crossed Meters Process: Clarifications and Support

Date of latest update
Type
Issue
ID
I0314
Change Category
Change Path
Priority
Urgent
No
Latest Update
12/05/2026 - The Information Request has closed. The Code Manager is curently assessing the responses
Summary
This issue seeks to solve is the gap between the documented REC Crossed Meters process and how it is being applied operationally. The aim is to ensure all parties fully understand the process, apply it consistently, and have the support necessary to achieve timely, correct resolution of Crossed Meter cases.
Proposer
James Hardy
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Date of Update to Priority
Solution Development
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0314 submission form
I0314 Change Report (Proposal Plan) Approved 21.04.26
Company Name
-
Review status
Review required

Return of Legacy Meters

Date of latest update
Type
Issue
ID
I0282
Change Path
Priority
Urgent
No
Latest Update
08/04/2026 - The Closure Report was presented to the REC Metering Expert Panel at their meeting on 08 April 2026. The Issue has now been classed as resolved.
Summary
The issue identified is that current arrangements require or assume that legacy Meter Asset Providers (MAPs) take back old, non Smart Meters once they are removed from Consumers’ Premises, even though many of these meters are obsolete, cannot be reused, and ultimately require disposal. This has resulted in large volumes of legacy meters being transported across the country between storage providers and legacy MAPs, creating unnecessary cost, administrative burden, and environmental impact. Storage providers are issuing extensive lists of Meter Serial Numbers (MSN) to try to establish meter ownership, and legacy MAPs must manually verify these details. This process has been made more difficult by historical changes in company names and ownership structures. Once ownership is confirmed, the meters are frequently transported to the legacy MAP only for them to arrange disposal, which provides no net value and simply adds further transportation and handling costs.
Proposer
bryan.heap
Change Report - Initial Assessment and Change Plan Report
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
The process for handling removed legacy non Smart Meters is inefficient and environmentally costly, with unclear ownership, unnecessary transport, and no established recycling route. A consistent, sustainable disposal solution is needed to reduce waste, simplify operations, and clarify the management of any scrap value.
I0282 submission form
I0282_Closure Report_v1.0 (26 March 2026)
Company Name
-
Review status
Review required

Effective Dates in EES

Date of latest update
Type
Issue
ID
I0247
Other Industry Codes impacted
Urgent
No
Latest Update
12/08/2026 - the Proposer has chosen to withdraw this Issue as MHHS means many of the effective dates are being updated as per the original business case so the change is no longer required.
Summary
On a switch many of the effective dates within EES default to the switch date. This includes energisation status. It means EES users that don't have access to the meter technical details do not know the actual date the status changed.
Proposer
Lorna Mallon
Impacted REC Documents
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
Stages Selection
Proposal Form
Company Name
-
Review status
Review required

D0303 flow following MHHS design changes

Date of latest update
Type
Issue
ID
I0230
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
29/04/2026 - This Issue has been withdrawn by the Proposer, as there was not a strong preference amongst MAPs of which temporary solution option (if any) should be progressed. Many MAPs already have workarounds in place, and a permanent solution is expected to be progressed in the future through a joint REC / BSC change. The adoption window has closed.
Summary
As part of Market Wide Half Hourly Settlement (MHHS) design, the requirement to provide Data Item Effective from Settlement Date {REGI} (J0049 / DI50025) in the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message (D0303 / MM00240) has been changed from mandatory to optional. This means Meter Asset Providers (MAP) may not receive it.
Proposer
Beth Tatton
Change Plan

Change Report (Proposal Plan) approved at Change Panel

Completed

Start:

Due:

Completion:

04 Nov 2025
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
The Effective from Settlement Date {REGI} Data Item being optional rather than mandatory inside the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message means that MAPs may not receive this information required for billing purposes.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
Issue Proposal Form
I0230 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0230 and I0261 Solution Development Report V1.0
I0230 I0261 Q&A session V1.0
I0230 and I0261 Consolidated IR Responses PUBLIC V1.0
Company Name
-
Review status
Review required

Changes to Terms of reference following acceptance of R0167

Date of latest update
Type
Change
ID
R0188
Change Path
Urgent
No
Latest Update
20/08/2024 - Approved for implementation on 06/09/2024.
Summary
This Housekeeping Change Proposal seeks to update the Terms of Reference of the REC Change Panel and the Performance Assurance Board, following the acceptance of R0167, to reflect Issues.
Proposer
Glenn Sheern
Impacted Consumers
Status
Implementation Date
Status Live
EMAR Version 06.09.2024_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
REC Change Panel - Terms of Reference
Archive
Off
Document title
REC Performance Assurance Board (PAB) - Terms of Reference
Archive
Off
Problem Statement
This Housekeeping Change Proposal seeks to update the Change Panel and Performance Assurance Board, Terms of Reference to reflect that these Committees consider change Issues as well as Change Proposals.
R0188 - Change Proposal Form
R0188 - Housekeeping Change Report (Post Approval)
Company Name
Rec Manager
Review status
Review required

Clarifying Event of Default requirements

Date of latest update
Type
Change
ID
R0129
Priority
Urgent
No
Latest Update
04/10/2023 - Following the approval of R0138, this change has been withdrawn.
Summary
Following several recent events of non-payment for services and REC defaults it is clear that the event of default provisions in the Code are unclear. This change seeks to introduce clarity to the REC Main Body.
Proposer
admin
Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
R0129 - Change Proposal form (downloadable version) 16.06.2023
Company Name
REC Code Manager
Review status
Review required

Enabling Electricity Enquiry Service searches using a Unique Property Reference Number

Date of latest update
Type
Change
ID
R0108
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Consumers that wish to utilise multi-channel switching services for gas, electricity, water, broadband, bank, home insurance etc. cannot make use of generic address-capture services for electricity switching as Unique Property Reference Number (UPRN) search functionality is not available within the Electricity Enquiry Service (EES).
Proposer
Andrew Dawson
Change Plan

Service Provider Impact Assessment window start

Completed

Start:

19 Apr 2023

Due:

02 Oct 2023

Completion:

02 Oct 2023

Service Provider Impact Assessment window close

Completed

Start:

02 Oct 2023

Due:

18 Dec 2023

Completion:

18 Dec 2023

Party Impact Assessment start

Completed

Start:

18 Dec 2023

Due:

12 Jan 2024

Completion:

12 Jan 2024

Preliminary Change Report and Consultation issued

Completed

Start:

02 Feb 2024

Due:

16 Feb 2024

Completion:

16 Feb 2024

Party Impact Assessment close

Completed

Start:

12 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Consultation close

Completed

Start:

16 Feb 2024

Due:

08 Mar 2024

Completion:

08 Mar 2024

Final Change Report issued

Completed

Start:

08 Mar 2024

Due:

15 Mar 2024

Completion:

15 Mar 2024

Responsible Committee decision

Completed

Start:

15 Mar 2024

Due:

27 Mar 2024

Completion:

27 Mar 2024

Appeal window closure

Completed

Start:

27 Mar 2024

Due:

12 Apr 2024

Completion:

12 Apr 2024
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 08.11.2024_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want to be able to switch my electricity easily and efficiently.
  2. As I Consumer, I want to be able to quote or switch my electricity as part of a packaged search.
  3. As a Supplier, I want Consumers to be able to search for quotes and switch efficiently.
  4. As an organisation providing multi-channel switching services, I want Consumers to be able to use one set of data when requesting quotes.
Proposed Solution Document
Document title
R0108 Requirements Specification v0.1
Archive
Off
Document title
Electricity Data Access Matrix_R0108 Draft
Archive
Off
Document title
EES API Interface Specification v3.1.6 - Redline
Archive
Off
Problem Statement
Consumers that wish to utilise multi-channel switching services, cannot benefit from the efficiencies of using a UPRN for the electricity Switch as the EES does not provide this functionality.
SME
SME Role
Lead Technical Analyst
Change Proposal Form
R0108 - Change Proposal Plan (Approved) 17.10.2023
R0108 - Initial Assessment Report (Approved) 17.10.2023
R0108 Consolidated Party IA Responses v1.0 Non-confidential (16.02.2024)
R0108 - Preliminary Change Report v1.0 published for consultation (16.02.2024)
R0108 - Consolidated Consultation Responses_Non Confidential (15.03.2024)
R0108 - Final Change Report v2.0 Post-Vote (27.03.2024)
Company Name
GB Group plc
Review status
Review required

CSS Message Time Stamping

Date of latest update
Type
Change
ID
R0107
Urgent
No
Latest Update
11/08/2023 - This Change Proposal has been withdrawn. During the progression of the Preliminary Impact Assessment work, it was found that an existing data item ‘EventDate’ could be leveraged to address the issue stated in the Change Proposal. R107 will be open for adoption until 25/08/2023.
Summary
Empty
Proposer
admin
Change Plan

Test

In Progress

Start:

14 Apr 2023

Due:

19 Mar 2026

Completion:

19 Mar 2026
Impacted Consumers
Impacted REC Services
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0107 - Change Proposal Form
Company Name
DCC
Review status
Review required