ERDS Upload File in the Data Specification and clarification of cancellation code

Date of latest update
Type
Change
ID
R0086
Priority
Urgent
No
Latest Update
06/11/2023 - Withdrawal adoption window closed.
Summary
The MPAS/ERDS Upload file has historically been a part of the Data Specification however during transition from the MRA, the process has been omitted. This change seeks to restore the file to the specification. Secondly, the file previously provided a cancellation reason code for Switches. Under the current REC arrangements (i.e. since CSS go live) Reason codes are not provided and have been defaulting to W which indicated a reason of “withdrawn” which may now be misleading. This Change Proposal has been raised to address these issues
Proposer
admin
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
R0086 - Change Proposal Form (downloadable version)
Company Name
-
Review status
Review required

Switching Programme Designation of the Steady State Commencement Date

Date of latest update
Type
Change
ID
R0085
Priority
Urgent
No
Latest Update
16/05/2023 - This change has been withdrawn by the Code Manager. The changes required to reflect the designation of the Steady State Commencement Date have been approved under Housekeeping Change Proposal. R0114 will be implemented as part of the June release on 30 June 2023.
Summary
Following Ofgem’s designation of the “Steady State Commencement Date” as 00:01 hours on 31 October 2022, this CP will remove redundant text and make the necessary changes to reflect the designation.
Proposer
admin
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
R0085 - Change Proposal Form (downloadable version)
Ofgem Designation of the Steady State Commencement Date.pdf
Company Name
-
Review status
Review required

Housekeeping changes to the approved legal text for R0047

Date of latest update
Type
Change
ID
R0084
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
Change Proposal R0047 - Metering Code of Practice Consolidation Review, has been approved for implementation on 01 April 2023. Since approval of the Change Proposal the Code Manager has identified a number of omissions, clarifications, typographical errors and changes needed to the approved legal text. This CP has been raised to make the changes to the legal text and ensure accurate text is introduced into the REC.
Proposer
Ann Perry
Change Plan

Preliminary Change Report published and issued for Consultation

Completed

Start:

16 Dec 2022

Due:

24 Feb 2023

Completion:

24 Feb 2023

Consultation ends

Completed

Start:

24 Feb 2023

Due:

10 Mar 2023

Completion:

10 Mar 2023

Final Change Report published

Completed

Start:

10 Mar 2023

Due:

21 Mar 2023

Completion:

21 Mar 2023

Responsible Committee decision (Ex-Committee)

Completed

Start:

21 Mar 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Appeal window closure

In Progress

Start:

24 Mar 2023

Due:

07 Apr 2023

Completion:

Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 01.04.2023_live
Included changes Affected REC Items
R0100 Update to Error Handling Documents
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a DNO, MEM, AMI, ASP or MI, I want all Code of Practice obligations to be clear and transparent, to ensure all obligations placed upon my organisation and operatives are understood and can be met in the most efficient way.
  2. As an Energy Supplier, I want to be confident that my Appointed agents are compliant with all relevant CoP obligations to ensure the safety of my Consumers.
  3. As RECCo, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
  4. As the Metering Scheme Auditor, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
Proposed Solution Document
Document title
R0084 Legal text changes - CoMCoP - (For Final Change Report) 21.03.2023
Archive
Off
Document title
R0084 Legal text changes - CoMCoP - (For consultation) 24.02.2023
Archive
Off
Problem Statement
To enable REC Parties to successfully meet the obligations of the CoMCoP, when it is implemented via Change Proposal R0047 on 01 April 2023, the CoMCoP needs to accurately reflect the intention of R0047 and current processes.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0084 - CP Form (Downloadable version)
R0084 - Legal text changes identified pre IAR/CPP - uploaded 12.02.23
R0084 - Change Proposal Plan v1.0 (Approved) 23.02.2023
R0084 - Initial Assessment Report v1.0 (Approved) 23.02.2023
R0084 - Preliminary Change Report v1.0 (Published for Consultation) 24.02.2023
R0084 - Consolidated consultation responses v1.0 21.03.2023
R0084 - Final Change Report v2.0 (Post-Vote) 24.03.2023
Company Name
-
Review status
Review required

Formalising the Submission of PPMIP Unallocated Transaction Report (UTR) Files

Date of latest update
Type
Change
ID
R0082
Change Category
Change Path
Priority
Urgent
No
Latest Update
09/04/2024 - Due to the MHHS impact on Service Providers, the technical code freeze and any MHHS impacts on the proposed solution, the Code Manager has reconsidered the priority of R0082 and believes that should be progressed following MHHS go-live. This Change Proposal has been withdrawn, and the Code Manager will consider raising a new change at the appropriate time following MHHS with consideration of the Codes Roadmap.
Summary
This CP seeks to address the following issues regarding the Unallocated Transaction Report (UTR) files provided by PPMIPs to the Code Manager each month: 1. There is no REC requirement for PPMIPs to submit a monthly file to the Code Manager 2. PPMIPs are currently submitting files in two different file formats 3. C&C is only able to load one of the two file formats The CP has been raised to introduce a requirement in the REC for PPMIPs to provide monthly Unallocated Transaction Report (UTR) files to the Code Manager in a single file format, set out in the REC Data Specification. With this format being one that can be loaded by C&C.
Proposer
Rosalind Timperley
Change Plan

Solution analysis and development

Completed

Start:

28 Nov 2022

Due:

12 Jan 2024

Completion:

11 Jan 2024

Service Provider Impact Assessment start date

Completed

Start:

12 Jan 2024

Due:

15 Jan 2024

Completion:

15 Jan 2024

Service Provider Impact Assessment close

Completed

Start:

15 Jan 2024

Due:

11 Mar 2024

Completion:

11 Mar 2024
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a PPMIP, I want to have clear guidance on how and when I should submit my Unallocated Transaction Report files.
  2. As a Supplier, I want to receive accurate Unallocated Transactions in relation to prepayment meters that are not smart meters.
  3. As the Code Manager, I want visibility of the Unallocated Transaction Report.
  4. As the EES Provider, I want to be able to efficiently upload the Unallocated Transaction Reports.
Problem Statement
PPMIPs aren’t submitting UTR files in the same format, and one of these formats cannot be loaded by the EES Provider. There is also no obligation in the REC for these reports to be provided.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0082 - Change Proposal Form
R0082 - Change Proposal Plan (Approved) 17.10.2023
R0082 Initial Assessment Report (Approved) 17.10.2023
Company Name
REC Code Manager
Review status
Review required

CSS Market Message Retry Strategy

Date of latest update
Type
Change
ID
R0081
Priority
Urgent
No
Latest Update
15/11/2023 - Change Proposal has been withdrawn. Market message success data for September 2023 was reviewed to ensure that a stable period was analysed which represented ‘normal’ conditions. Upon completion of the review, it has been concluded that the success of the current retry strategy has significantly improved since this change proposal was raised. The Code Manager will introduce cyclical reviews of performance to ensure this continues at the expected levels.
Summary
The prescriptive nature of the Market Message retry drafting is currently impeding on the CSS Service Provider’s ability to ensure all Market Messages are sent and received successfully between the CSS and the CSS User. This CP proposes a move to a principles-based obligation that allows for flexibility to ensure the CSS and CSS User are able to attempt retries but not have to follow specific timings or have a maximum number of retries.
Proposer
admin
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
Date of Update to Priority
Solution Development
Stages Selection
R0081 - Change Proposal Form
Proposed legal text submitted with the CP
Company Name
-
Review status
Review required

Improvements to ‘Failed to Deliver’ CSS Messages

Date of latest update
Type
Change
ID
R0080
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the REC Release on 27 June 2025.
Summary
Since CSS Go-Live a large number of messages have not been successfully delivered due to failures of CSS User's gateways, resulting in CSS exhausting the 12-hour retry period. This Change Proposal has been raised to explore and address this issue
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment close

Completed

Start:

09 Nov 2022

Due:

25 Jan 2024

Completion:

25 Jan 2024

Party Impact Assessment trigger

Completed

Start:

25 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Party Impact Assessment close

Completed

Start:

02 Feb 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024

Preliminary Change Report and Consultation issued

Completed

Start:

23 Feb 2024

Due:

10 May 2024

Completion:

10 May 2024

Consultation close

Completed

Start:

10 May 2024

Due:

03 Jun 2024

Completion:

03 Jun 2024

Responsible Committee Decision

Completed

Start:

24 Jul 2024

Due:

31 Jul 2024

Completion:

31 Jul 2024

Final Change Report Issued

Completed

Start:

03 Jun 2024

Due:

24 Jul 2024

Completion:

19 Jul 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 27.06.2025_live
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want the Switching process to work successfully, so that I can switch Energy Supplier without delays or issues.
  2. As the CSS Provider I want the messages I send to CSS Users to be received and processed successfully, so that there is no interruption to the Switching process or the Consumers’ Switching experience.
  3. As the CSS User I want to receive CSS messages in a timely manner following any outage of my own gateway or systems, so that there is no interruption to the Switching process or the Consumers’ Switching experience.
Proposed Solution Document
Document title
R0080 - Solution Development Report 11.01.2024
Archive
Off
Document title
CSS Interface Design Specification v8.9.0 R0080 - REDLINE
Archive
Off
Document title
CSS Failed To Deliver Detailed Design (R0080) v1.3 (19.06.2024)
Archive
Off
Document title
Business Data Validation Rules v1.5.0 R0080 - REDLINE
Archive
Off
Document title
Schedule 24_Switching Data Management v1.2_R0080 Draft (19.06.2024)
Archive
Off
Problem Statement
Following an unexpected or extended period of gateway outage for a CSS User, there is currently no automated process to resend any CSS messages from the CSS Provider that were triggered during the period of outage. This results in the CSS Provider needing to manually correct any issues, which is time consuming and may affect Consumer Switches due to delays in messages being processed.
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
SME Role
Lead Assurance Analyst
R0080 - Change Proposal form
R0080 Onboarding document
R0080 - Change Proposal Plan (Approved) 16.01.2024
R0080 - Rebaselined Change Plan (26.04.2024)
R0080 - Initial Assessment Report (Approved) 16.01.2024
R0080 Consolidated Party IA Responses v1.0 (10.05.2024)
R0080 - Preliminary Change Report v1.0 (Published for Consultation) 10.05.2024
R0080 Consolidated Consultation Responses (19.06.2024)
R0080 - Final Change Report v2.0 (Approved) 31.07.2024
Company Name
-
Review status
Review required

Addition of Previous MEM to the EES API

Date of latest update
Type
Change
ID
R0079
Change Category
Change Path
Priority
Urgent
No
Latest Update
14/05/2024 - As this Change Proposal is affected by the MHHS Code Freeze, the Proposer has withdrawn this CP and may reraise it post M10.
Summary
This change aims to add the previously appointed MEM as a data item viewable in the EES API
Proposer
Adrian Salter
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
Addition of Previous MEM to the EES API.docx
Company Name
-
Review status
Review required

EMR Settlement Limited - additional access to EES

Date of latest update
Type
Change
ID
R0078
Change Path
Priority
Urgent
No
Latest Update
29/09/23 - This change was implemented on 29 September 2023 as part of an Extraordinary REC Release
Summary
This Change proposal seeks to extend the access permitted in the Electricity Enquiry Service (EES) for Electricity Market Reform Settlement (EMRS) Limited to enable the completion of metering assessments and change of supply checks where Capacity Provider’s portfolio includes domestic Consumers.
Proposer
Ben Lathbury
Change Plan

SERVICE PROVIDER IMPACT ASSESSMENT ISSUED

Completed

Start:

26 Oct 2022

Due:

07 Jul 2023

Completion:

11 Aug 2023

PRELIMINARY CHANGE REPORT AND CONSULTATION ISSUED

Completed

Start:

07 Jul 2023

Due:

18 Aug 2023

Completion:

18 Aug 2023

FINAL CHANGE REPORT ISSUED

Completed

Start:

18 Aug 2023

Due:

08 Sep 2023

Completion:

08 Sep 2023

RESPONSIBLE COMMITTEE DECISION

Completed

Start:

08 Sep 2023

Due:

15 Sep 2023

Completion:

15 Sep 2023
Status
Implementation Date
Status Live
EMAR Version 29.09.2023_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As EMRS I want to have an appropriate understanding of the portfolio so that I am able to complete metering assessments and checks on Switches so that I can fulfil my role.
  2. As the EES Provider I want to be able to provide access to EMR Settlement Limited as set out in the Data Access Matrix.
Proposed Solution Document
Document title
R0078 - Electricity Data Access Matrix v3.3 (17.08.2023)
Archive
Off
Problem Statement
EMRS are experiencing an increasing occurrence of domestic Consumers being included in Capacity Provider portfolios. Currently they have limited availability to data on domestic Consumers, making the completion of assessments and checks difficult. Access to data held in the EES for domestic metering points will enable EMRS to complete these tasks that are required to appropriately include domestic provider contributions in the overall view of the Capacity Market.
SME
SME Role
Lead Technical Analyst
R0078 Change Proposal Form
Redlined DAM (Provided by the Proposer)
R0078 Change Proposal Plan v1.0 (Approved) 18.07.2023
R0078 Initial Assessment Report v1.0 (Approved) 18.07.2023
R0078 Preliminary Change Report
R0078 - Non Confidential Consultation Responses
R0078 - Final Change Report v2.0 post vote
Company Name
-
Review status
Review required

DNOs notifying Suppliers about Crossed Meters

Date of latest update
Type
Change
ID
R0076
Priority
Urgent
No
Latest Update
28/05/2024 - R0076 has been withdrawn as the issue was addressed through R0121 - SDEP Review Improvements (1) - Process Types. The adoption window is closed.
Summary
The Change seeks to introduce a way for the DNOs to raise a crossed meter issue with the Supplier, in a way that directly feeds into the Supplier’s list of crossed meter issues. The supplier will be required to feed back progress to the DNO who has raised the issue with them, this should be defined as a process within the REC.
Proposer
anneclaireleydier
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
R0076 - Change Proposal Form v1.0
Company Name
-
Review status
Review required

Enabling Software Product Qualification

Date of latest update
Type
Change
ID
R0075
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
26/03/2024 - Adoption window closed and change fully withdrawn.
Summary
This change proposes that specific software product sets should be allowed to complete qualification independently of any specific REC Party. The product set would then be subject to its own maintenance of qualification by following the REC Maintenance of Qualification processes. Any REC Party using that product set would then be able to ‘place reliance’ on this qualification as part of their own market entry and annual maintenance statements.
Proposer
Elaine Eyles
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
R0075 - Change Proposal Form
Company Name
-
Review status
Review required