New Meter Types for Auxiliary Proportional Controllers (APCs)

Date of latest update
Type
Change
ID
R0010
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This change seeks to introduce a method for industry parties to identify new SMETS2 variant meter types with Auxiliary Proportional Controllers (APCs).
Proposer
David Morton
Change Plan

Change Panel review

Completed

Start:

08 Sep 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Analysis and Solution development activity

Completed

Start:

19 Oct 2021

Due:

30 Dec 2021

Completion:

30 Dec 2021

Alternative Change Proposal decision point

Completed

Start:

30 Dec 2021

Due:

31 Dec 2021

Completion:

31 Dec 2021

Service Provider Impact Assessment completion

Completed

Start:

31 Dec 2021

Due:

21 Apr 2022

Completion:

21 Apr 2022

REC Party Impact Assessment completion

Completed

Start:

21 Apr 2022

Due:

23 May 2022

Completion:

28 Mar 2022

Preliminary Change Report issued

Completed

Start:

23 May 2022

Due:

27 Jun 2022

Completion:

27 Jun 2022

Technical Expert Panel review

Completed

Start:

27 Jun 2022

Due:

05 Jul 2022

Completion:

30 Jun 2022

Consultation starts

Completed

Start:

05 Jul 2022

Due:

12 Jul 2022

Completion:

01 Jul 2022

Consultation ends

Completed

Start:

12 Jul 2022

Due:

26 Jul 2022

Completion:

22 Jul 2022

Final Change Report issued

Completed

Start:

26 Jul 2022

Due:

22 Aug 2022

Completion:

19 Aug 2022

Technical Expert Panel decision

Completed

Start:

22 Aug 2022

Due:

31 Aug 2022

Completion:

31 Aug 2022
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want to be quoted the correct rates as part of my contract conversation when switching supplier. I want my meter set-up correctly to be able to utilise secondary electricity loads at specific times for specific purposes. (e.g., overnight Electric Vehicle (EV) charging, Heat/Hot Water, Boost, etc.). I want to be assured that I will have access to electricity when I need it. I want to switch to my chosen Supplier without any delays or issues.
  2. As an Energy Supplier, I need to identify meter types with Auxiliary Proportional Controllers (APCs) at a property, so that I can offer my customer the correct tariff and configure their meter correctly.
  3. As a Meter Equipment Manager (MEM), I need to identify meter types that incorporate Auxiliary Proportional Controllers (APCs) are present at a property, so that any necessary maintenance/repair work can be carried out appropriately.
Proposed Solution Document
Document title
R0010 - Final approved legal text
Archive
Off
Document title
R0010 - Draft Legal Text v1.0
Archive
Off
Document title
R0010 - Appendix 1 - Solution Analysis v1.0
Archive
Off
Problem Statement
Currently there is no way to identify new meter types that incorporate Auxiliary Proportional Controllers (APCs) outside of the DCC Smart Metering Inventory. Failure to correctly identify these could result in an incorrect meter type being assigned to a supply point. Failure to accurately record where meter types that incorporate Auxiliary Proportional Controllers (APCs) are at a property could result in the meter not being configured correctly by the Supplier. This may impact switching, timely and accurately billing, and industry settlements. Options need to be considered to accurately record what meter types that incorporate Auxiliary Proportional Controllers (APCs) are installed at a property.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
DTC CP 3580 - New Meter Types for Auxiliary Proportional Controllers.pdf
R0010 - Change Proposal Plan v1.0 (Approved)
R0010 – Initial Assessment Report v1.0 (Approved)
R0010 - Consolidated Impact Assessment Responses v1.0
R0010 - Preliminary Change Report v1.0 (Approved)
R0010 - Consolidated Consultation Responses v1.0
R0010 - Final Change Report v2.0 (Post-Vote - Approved)
Company Name
-
Review status
Review required

Introduction of SDEP and EES User Maintenance API

Date of latest update
Type
Change
ID
R0009
Change Category
Change Path
Priority
Urgent
No
Latest Update
On the 24 August 2023, the Authority issued its decision to the REC Code Manager to reject an appeal raised
Summary
This Change Proposal is to introduce an Application Programming Interface (API) interface to allow: • SDEP Users to send/receive/respond automatically to messages through the Secure Data Exchange Portal (SDEP) • EES and Secure Data Exchange Service (SDES) Users to carry out automated Electricity Enquiry Service (EES) Authorised Person Maintenance
Proposer
Jonathan Holland
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

25 Oct 2021

Completion:

25 Oct 2021

Analysis and Solution Development activity

Completed

Start:

25 Oct 2021

Due:

15 Feb 2022

Completion:

15 Feb 2022

Service Provider Impact Assessment completion

Completed

Start:

15 Feb 2022

Due:

04 Apr 2022

Completion:

04 Apr 2022

Preliminary Change Report issued

Completed

Start:

13 May 2022

Due:

16 Dec 2022

Completion:

16 Dec 2022

Technical Expert Panel review

Completed

Start:

16 Dec 2022

Due:

21 Dec 2022

Completion:

21 Dec 2022

Consultation Starts

Completed

Start:

21 Dec 2022

Due:

23 Dec 2022

Completion:

23 Dec 2022

Consultation Ends

Completed

Start:

23 Dec 2022

Due:

27 Jan 2023

Completion:

27 Jan 2023

Final Change Report issued

Completed

Start:

27 Jan 2023

Due:

10 Feb 2023

Completion:

10 Feb 2023

Appeal Window Closure

Completed

Start:

22 Feb 2023

Due:

15 Mar 2023

Completion:

15 Mar 2023

Party Impact Assessment Issued

Completed

Start:

04 Apr 2022

Due:

13 May 2022

Completion:

13 May 2022

Technical Expert Panel review

Completed

Start:

10 Feb 2023

Due:

22 Feb 2023

Completion:

22 Feb 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a consumer, I want to ensure the data held by my supplier and other industry parties is correct so that I receive accurate and timely bills so that I understand what I need to pay and by when with no surprises.
  2. As a consumer, I want to be able to switch my energy supply without experiencing significant delays whilst my new and old supplier resolve any issues. So that I can see the benefits of switching at the earliest opportunity.
  3. As an SDEP User, I want to be able to automate processes that use the SDEP, so I can meet my obligations as efficiently and effectively as possible. As an EES or SDES User, I want to be able to automate certain user maintenance requests, so I can manage user maintenance activities as efficiently as possible.
Proposed Solution Document
Document title
Draft Legal Text
Archive
Off
Problem Statement
It is not possible to automate the sending and receiving messages through the SDEP. It is also not possible to manage Authorised Person’s permissions in the EES and SDES in bulk where there is a high volume of changes required. This requires processes to be managed manually by an Authorised Person and doesn’t allow EES and SDES Users to identify more efficient ways of working.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0009 - Change Proposal Plan v4.0 (Approved)
R0009 - analysis summary conclusions v1.0
R0009 - Initial Assessment Report v1.0 (Approved)
R0009 - Requirements v1.0 - Used in Party IA
R0009 - Consolidated consultation responses v1.0
R0009 - Consolidated Impact Assessment Responses v1.0 GENERAL
Appendix 2 - R0009 Requirements
R0009 - Preliminary Change Report v1.0 (Decision deferred until 30/11/2022)
R0009 - Preliminary Change Report v3.0 (Approved)
R0009 - Final Change Report v2.0 (POST-VOTE) 01.03.2023
Authority R0009 appeal decision
Company Name
-
Review status
Review required

Consequential New and Amended Market Messages for BSC Modification P375

Date of latest update
Type
Change
ID
R0008
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Gemma Dixon
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

01 Nov 2021

Completion:

29 Oct 2021

Technical Expert Panel review

Completed

Start:

01 Nov 2021

Due:

08 Nov 2021

Completion:

08 Nov 2021

Consultation starts

Completed

Start:

08 Nov 2021

Due:

15 Nov 2021

Completion:

12 Nov 2021

Consultation ends

Completed

Start:

15 Nov 2021

Due:

06 Dec 2021

Completion:

06 Dec 2021

Final Change Report issued

Completed

Start:

06 Dec 2021

Due:

10 Dec 2021

Completion:

10 Dec 2021

Technical Expert Panel decision

Completed

Start:

10 Dec 2021

Due:

22 Dec 2021

Completion:

22 Dec 2021
Status
Implementation Date
Status Live
EMAR Version 30.06.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer I want to be able to access aggregation services so that I can take full advantage of commercial opportunities for my onsite generation or demand reduction.
  2. As Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  3. As an Asset Metering Virtual Lead Party, I need to be recognised as a valid Market Data Service, so that I can appoint BSC Qualified Agents and fulfil relevant metering operations and data collection activities for Asset Metering.
Proposed Solution Document
Document title
Legal Text (Tracked Changes)
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
BSC Modification P375 will be implemented on 30th June 2022 and introduces a new role of Asset Metering Virtual Lead Party (AMVLP), to allow settlement of meters ‘behind the boundary point’. To enable this, the AMVLP will need to exchange Market Messages with other Market Participants that underpin the new process being introduced by the BSC. Some of these Market Messages are governed by the REC and require a consequential REC Change Proposal to deliver the full solution.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
Attachment B- New and amended Market Messages and Data Items for REC.docx
BSC P375 Final Modification Report
R0008 – Initial Assessment Report v1.0 (Approved)
R0008 – Change Proposal Plan v1.0 (Approved)
R0008 - Preliminary Change Report v1.0 (Approved)
R0008 - Final Change Report v2.0 (Post Vote)
Company Name
-
Review status
Review required

Changes to message ownership in SDEP

Date of latest update
Type
Change
ID
R0007
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
admin
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

25 Oct 2021

Completion:

25 Oct 2021

Change Panel review

Completed

Start:

25 Oct 2021

Due:

02 Nov 2021

Completion:

02 Nov 2021

Analysis and Solution Development activity

In Progress

Start:

02 Nov 2021

Due:

21 Dec 2021

Completion:

Service Provider Impact Assessment completion

Not Started

Start:

21 Dec 2021

Due:

02 Feb 2022

Completion:

REC Party Impact Assessment completion

Not Started

Start:

02 Feb 2022

Due:

18 Mar 2022

Completion:

Preliminary Change Report issued

Not Started

Start:

18 Mar 2022

Due:

16 May 2022

Completion:

Technical Expert Panel review

Not Started

Start:

15 Jul 2022

Due:

27 Jul 2022

Completion:

Consultation Starts

Not Started

Start:

16 May 2022

Due:

26 May 2022

Completion:

Consultation ends

Not Started

Start:

26 May 2022

Due:

20 Jun 2022

Completion:

Final Change Report issued

Not Started

Start:

20 Jun 2022

Due:

15 Jul 2022

Completion:

Technical Expert Panel decision

Not Started

Start:

27 Jul 2022

Due:

27 Jul 2022

Completion:

Appeal Window Closure

Not Started

Start:

27 Jul 2022

Due:

17 Aug 2022

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a consumer, I want issues affecting me or my energy account to be resolved at the earliest opportunity, to minimise impacts to my energy switch or accurate and timely billing.
  2. As a SDEP Authorised Person with the responsibility for message allocation, I want to efficiently assign multiple messages in one transaction to an Authorised Person, to remove the need to manual assign them one by one.
  3. As a SDEP Authorised Person with the responsibility for message allocation, I want to be able to filter messages to identify messages requiring action. This will ensure messages are picked up promptly and resolved within the agreed Service Level Agreement (SLA).
Problem Statement
Currently in the SDEP there is no way to assign/unassign multiple messages to Authorised Persons in one action, this makes the allocation of messages inefficient. Each message must be individually opened before it can be assigned/unassigned. Not having clarity on the status of messages, or the ability to assign multiple messages to an Authorised Person as one action, may result in the allocation of queries being delayed, potentially impacting response times for queries and escalations. Any delays in resolving those queries could have a detrimental impact on the customer’s experience. There is also limited methods of effectively identifying and being able to filter messages requiring action on the home screen. This effects the Authorised Person’s ability to promptly allocate and resolve messages within the agreed Service Level Agreement (SLA).
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0007 - Initial Assessment Report v1.0 (Approved)
R0007 - Change Proposal Plan v1.0 (Approved)
Company Name
-
Review status
Review required

Missing Meter Technical Details

Date of latest update
Type
Change
ID
R0006
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/07/2024 - R0006 has been withdrawn as the issue has been addressed under R0121 - SDEP Review Improvements - Process Types.
Summary
When a Switch occurs, with a concurrent change of Metering Equipment Manager (MEM), and the Meter Technical Details (MTD) are not received by the Gaining Supplier’s MEM, they are unable to provide them to the Gaining Supplier. Lack of MTDS can impact Consumers, Suppliers, and other industry Parties. The Change Proposer has highlighted that there is currently no defined escalation process available to Suppliers, enabling them to chase for missing MTDs following a Switch.
Proposer
Diane Lyon
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Updated Change Proposal Plan presented to Change Panel

Completed

Start:

19 Oct 2021

Due:

04 Oct 2022

Completion:

04 Oct 2022

Solution Development

Completed

Start:

04 Oct 2022

Due:

05 Oct 2022

Completion:

08 Jan 2023

Updated plan Presented to Change Panel

Completed

Start:

05 Oct 2022

Due:

06 Dec 2022

Completion:

06 Dec 2022

Service Provider Impact Assessment

Missing Meter Technical Details > Change Plan

Start:

06 Dec 2022

Due:

09 Jan 2023

Completion:

Party Impact Assessment

Completed

Start:

09 Jan 2023

Due:

03 Feb 2023

Completion:

24 Feb 2023

Preliminary Change Report Issued

Missing Meter Technical Details > Change Plan

Start:

03 Feb 2023

Due:

28 Apr 2023

Completion:

Responsible Committee Review

Missing Meter Technical Details > Change Plan

Start:

28 Apr 2023

Due:

10 May 2023

Completion:

Consultation Issued

Missing Meter Technical Details > Change Plan

Start:

10 May 2023

Due:

12 May 2023

Completion:

Final Change Report Issued

Missing Meter Technical Details > Change Plan

Start:

12 May 2023

Due:

30 Jun 2023

Completion:

Responsible Committee Decision

Missing Meter Technical Details > Change Plan

Start:

30 Jun 2023

Due:

12 Jul 2023

Completion:

Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer: I want my new Supplier to set up my account in a timely manner, ensuring that I receive timely and accurate bills. I want to my meter to be read regularly to ensure I receive accurate bills I want to receive my final invoice from my old Supplier in a timely manner
  2. As a Losing Supplier I want to agree a closing meter reading to allow me to produce a final invoice and collect any outstanding payments
  3. As a Gaining Supplier I want to set up the energy account correctly for the consumer, receive an opening reading and produce a timely first invoice As a Gaining Supplier’s MEM I want to receive the MTD to enable me to update my data and trigger the necessary Market Messages to the new Supplier, new DC and DNO As a new Data Collector I want to receive the MTD to enable me to set up the correct meter reading schedule and collect meter readings.
Proposed Solution Document
Document title
R0006 - Solution Document v1.0
Archive
Off
Problem Statement
On a CoS the new MEM and Supplier need to receive the MTDs from the previous MEM to complete the setup of the customer’s account and billing records. Where MTD are not sent there is no dispute or escalation process to resolve this. This prevents the new Supplier from setting up the customer’s account and issuing a timely and accurate bill.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0006 - Change Proposal Plan v4.0 (Approved)
R0006 - Initial Assessment Report v1.0 (Approved)
Company Name
ScottishPower
Review status
Review required

Electricity Enquiry Service (EES) Master Administration User (MAU) Access

Date of latest update
Type
Change
ID
R0004
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
admin
Change Plan

Initial Assessment Report published

Completed

Start:

03 Sep 2021

Due:

21 Oct 2021

Completion:

21 Oct 2021

Change Panel review

Completed

Start:

21 Oct 2021

Due:

02 Nov 2021

Completion:

02 Nov 2021

Analysis and Solution development activity

In Progress

Start:

02 Nov 2021

Due:

13 Jan 2022

Completion:

Service Provider Impact Assessment completion

Not Started

Start:

29 Mar 2022

Due:

31 Mar 2022

Completion:

REC Party Impact Assessment completion

Not Started

Start:

13 Jan 2022

Due:

29 Mar 2022

Completion:

Preliminary Change Report issued

Not Started

Start:

31 Mar 2022

Due:

20 Apr 2022

Completion:

Technical Expert Panel review

Not Started

Start:

20 Apr 2022

Due:

27 Apr 2022

Completion:

Consultation starts

Not Started

Start:

27 Apr 2022

Due:

05 May 2022

Completion:

Consultation ends

Not Started

Start:

05 May 2022

Due:

26 May 2022

Completion:

Final Change Report issued

Not Started

Start:

29 Jun 2022

Due:

21 Sep 2022

Completion:

Technical Expert Panel decision

Not Started

Start:

26 May 2022

Due:

29 Jun 2022

Completion:

Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a consumer, I want to my queries to be resolved in a timely manner by advisers with access to relevant information, so that I receive accurate and timely bills.
  2. As an EES User (an organisation): I want to receive reports of Meter Point Limit Breaches in the absence of the MAU, to enable the analysis of EES usage and to enable limit breaches to be identified and responded to. I also want all approved people to have access to the EES in a timely manner following the introduction of a new email domain, so that the EES can be used to support with issue and query resolution.
  3. As an MAU, I want email domain changes to be validated in my absence, to avoid delays to new users being set up with EES access.
Problem Statement
Where an MAU is not available, and MAU responsibilities within EES have not been transferred, the functions and information only available to this role cannot be accessed by the organisation. This has the potential to impact an organisations operational effectiveness.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0004 - Change Proposal Plan v1.0 (Approved)
R0004 - Initial Assessment Report v1.0 (Approved)
Company Name
-
Review status
Review required

Review of Data Specification Category in REC Baseline Statement

Date of latest update
Type
Change
ID
R0002
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

01 Sep 2021

Due:

03 Sep 2021

Completion:

02 Sep 2021

Change Panel review

Completed

Start:

03 Sep 2021

Due:

07 Sep 2021

Completion:

07 Sep 2021

Preliminary Change Report published

Completed

Start:

07 Sep 2021

Due:

09 Sep 2021

Completion:

09 Sep 2021

Consultation start

Completed

Start:

09 Sep 2021

Due:

14 Sep 2021

Completion:

14 Sep 2021

Consultation end

Completed

Start:

14 Sep 2021

Due:

20 Sep 2021

Completion:

20 Sep 2021

Final Change Report published

Completed

Start:

20 Sep 2021

Due:

24 Sep 2021

Completion:

24 Sep 2021

Change Panel decision

Completed

Start:

24 Sep 2021

Due:

05 Oct 2021

Completion:

05 Oct 2021
Status
Implementation Date
Status Live
EMAR Version 04.11.2021_live
Included changes Affected REC Items
R0001 Amendment to DCC Service Flag (DI51130) Data Item

Documents

Name Version Last updated Actions
241.04 KB
Version 1.3 - 29 May 2026 XLSX - 241.04 KB
1.3 29 May 2026
455.42 KB
Version 1.3 - 29 May 2026 XLSX - 455.42 KB
1.3 29 May 2026
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a market participant, I need to understand any changes to market messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  2. As the REC Code Manager, I need to ensure that proposals to amend the Data Specification are subject to appropriate scrutiny and impact assessment, so that impacted stakeholders can appropriately engage with the proposal and understand the impacts to their business.
Proposed Solution Document
Document title
Changes to REC Baseline Statement
Archive
Off
Problem Statement
The Data Specification was not included in the Switching Programme Change Requests that gave effect to REC V2.0. Therefore, the Data Specification was not formally designated as part of REC V2.0 and has temporarily been added to the REC Baseline Statement as a Category 3 product. This means that changes to the Data Specification, including changes to Market Messages and Data Items used by market participants to interface with other businesses and service providers, are not subject to the process set out in the REC Change Management Schedule. Changes to these artefacts can have significant impacts to the systems and processes of market participants and service providers. These changes should follow a robust and thorough assessment to ensure these impacts are identified and considered, and the most appropriate solution is considered. The Category 3 change process is not appropriate for this, as changes to Category 3 products should not cause a material impact to parties and stakeholders.
Initial Assessment Report V1.0 (Approved)
Change Proposal Plan V1.0 (Approved)
R0002 - Preliminary Change Report v1.0 (Approved)
R0002 - Final Change Report v1.0 (Pre-Vote)
R0002 - Final Change Report v2.0 (Post-Vote)
Company Name
-
Review status
Review required

Amendment to DCC Service Flag (DI51130) Data Item

Date of latest update
Type
Change
ID
R0001
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

01 Sep 2021

Due:

03 Sep 2021

Completion:

02 Sep 2021

Change Panel review

Completed

Start:

03 Sep 2021

Due:

07 Sep 2021

Completion:

07 Sep 2021

Preliminary Change Report published

Completed

Start:

07 Sep 2021

Due:

09 Sep 2021

Completion:

09 Sep 2021

Consultation start

Completed

Start:

09 Sep 2021

Due:

14 Sep 2021

Completion:

14 Sep 2021

Consultation end

Completed

Start:

14 Sep 2021

Due:

20 Sep 2021

Completion:

20 Sep 2021

Final Change Report published

Completed

Start:

20 Sep 2021

Due:

24 Sep 2021

Completion:

24 Sep 2021

Change Panel decision

Completed

Start:

24 Sep 2021

Due:

05 Oct 2021

Completion:

05 Oct 2021
Status
Implementation Date
Status Live
EMAR Version 04.11.2021_live
Included changes Affected REC Items
R0001 Amendment to DCC Service Flag (DI51130) Data Item

Documents

Name Version Last updated Actions
241.04 KB
Version 1.3 - 29 May 2026 XLSX - 241.04 KB
1.3 29 May 2026
455.42 KB
Version 1.3 - 29 May 2026 XLSX - 455.42 KB
1.3 29 May 2026
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want my Energy Supplier to know the status of my smart meter, so they can bill me accurately using remote smart data.
  2. As an Energy Supplier, I need to establish whether there is a smart meter I can communicate with in the DCC network, so I can complete the correct process for customers switching supplier.
  3. As a Distribution Network Operator, I need to establish whether there is a smart meter I can communicate with in the DCC network, so I know whether to respond to smart meter alerts.
Proposed Solution Document
Document title
Amendments to DCC Service Flag Data Item - Legal Text
Archive
Off
Document title
Link to EMAR - Change Set (Clean)
Archive
Off
Problem Statement
SEC Modification Proposal 077 proposes to update the values, and business rules, of the DCC Service Flag Data Item. This will allow users to use the Data Item as originally intended, to establish whether there is an active smart meter in the DCC network that they can communicate with at a premises. This modification has been approved for implementation on 4th November 2021 by the SEC, and a consequential change is required to the Data Specification to reflect this.
SEC MP077 - Modification Report v1.0.pdf
SEC MP077 Legal Text v1.0 (1).pdf
Initial Assessment Report V1.0 (Approved)
Change Proposal Plan V1.0 (Approved)
R0001 - Preliminary Change Report v1.0 (Approved)
R0001 - Final Change Report v1.0 (Pre-Vote)
R0001 - Final Change Report v2.0 (Post-Vote)