Schedule 14 - Metering Operations 4.1
– Implemented on
Loading...
Allowing different Metering Equipment Managers (MEMs) to be appointed to Import and Export Metering Points
Date of latest update
Type
Change
ID
R0144
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
17/02/2025 - R0144 has been withdrawn by the Proposer, alongside it's joint BSC Change P459, as they cannot be progressed prior to MHHS. The Proposer will look to re-raise both changes in the future. The adoption window for this withdrawal has closed.
Summary
The Export Supplier needs to be able to appoint different MEMs to that of the Import Supplier
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As a Consumer, I want a competitive Export market so I can get the best rates for the energy I generate. I want clear metering equipment ownership so I can be confident my meter is functional and safe. I want accurate billing from my Export Supplier.
- As an Export Supplier, I want to be able to appoint the MEM that ties in with my commercial strategy.
- As a MEM, I want clear guidance on the responsibilities I have for any metering equipment I am appointed to.
Problem Statement
Export Suppliers may become non-compliant with industry regulations if they are unable to appoint the same MEM as the Import Supplier, for example when the Consumer switches Import Supplier or when the Import Supplier changes the appointed MEM.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
Change Proposal Form
R0144 Change Proposal Plan Withdrawal v1.0 (Pre Approval)
R0144 Change Proposal Plan v1.0 (16.04.2024) Approved
R0144 Initial Assessment Report v1.0 (16.04.2024) Approved
Company Name
REC Code Manager
Review status
Review required
Schedule 14 - Metering Operations 4.0
– Implemented on
Loading...
Aligning electricity and gas timescale requirements for sharing Meter Technical Detail information
Date of latest update
Type
Change
ID
R0109
Change Category
Change Path
Priority
Urgent
No
Latest Update
22/03/2024 - Withdrawn.
Summary
Empty
Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
Fuel
Date of Update to Priority
Solution Development
Stages Selection
R0109 - Change Proposal Form
Company Name
Utility Warehouse
Review status
Review required
Review of ONAGE SLAs
Date of latest update
Type
Change
ID
R0105
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/09/24 - Change Report REJECTED by REC Metering Expert Panel
Summary
In light of the changes introduced as part of the Faster Switching Programme, this Change Proposal has been raised to review the SLAs and lead times around the sending and receiving/processing of the ONAGE and associated Market Messages.
Change Plan
Solution Development Closes
Completed
Start:
06 Apr 2023Due:
31 May 2024Completion:
31 May 2024Party Impact Assessment Published
Completed
Start:
31 May 2024Due:
04 Jul 2024Completion:
04 Jul 2024Preliminary Change Report & Consultation Published
Completed
Start:
04 Jul 2024Due:
08 Aug 2024Completion:
08 Aug 2024Final Change Report Published
Not Started
Start:
08 Aug 2024Due:
04 Sep 2024Completion:
Responsible Committee Decision
Not Started
Start:
04 Sep 2024Due:
11 Sep 2024Completion:
Appeal Window Closure
Not Started
Start:
11 Sep 2024Due:
25 Sep 2024Completion:
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As a Consumer, I want to have continual Meter Equipment Manager coverage, so that I am confident that work on my Metering Asset can be conducted even during a Switch.
- As a MEM, I want my obligations relating to appointment and de-appointment to be considered and practicable, so that my operational processes are not unduly onerous. 2 - As a Gas Supplier, I want to be able to reliably and predictably appoint and de-appoint MEMs during a Switch, so that I am confident that my Consumers are not left without a MEM at any stage. 3 - As the Code Manager, I want REC processes to operate within SLAs that are reflective of both the realistic operational capacities of REC Parties, and also of the needs of the broader market, so that the end Consumer has the best possible Switching experience.
Problem Statement
Current ONAGE SLAs may no longer be proportionate to the length of the Switching process as a result of the Faster Switching programme. Lengthy ONAGE SLAs relative to the timescale of the switching process may result in Consumers being left without a MEM during the switch process. The proposer has asked the Code Manager to conduct a review of the ONAGE SLAs to explore whether these SLAs are still appropriate, and therefore ensure that Consumers are subject to any detriment.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0105 - Change Proposal Form (downloadable version) 06.04.2023
R0105 Change Proposal Plan (Approved) V2.0 31.05.24
R0105 Initial Assessment Report (Approved) V1.0 16.04.24
R0105 Change Proposal Re-Plan (Approved) V1.0 31.05.24
R0105 Consolidated IA Responses V1.0 08.08.24
R0105 Change Report (Published for Consultation) v1.0 08.08.24
R0105 Consolidated Consultation Responses V1.0 02.09.2024
R0105 Change Report (Rejected) V2.0 11.09.24
Company Name
-
Review status
Review required
Schedule 14 - Metering Operations 3.2
– Implemented on
Loading...
Revision of the Implementation Date and approved solution for R0021
Date of latest update
Type
Change
ID
R0101
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
Yes
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
Updated 28 April 2023: Following discussions with DCUSA and Ofgem, this change has been amended to remove reference to deferral of R0021. The Change will focus on providing clarity on the proposed solution and Market Messages to be used when Safe Isolation Works are undertaken. The implementation approach has been amended to a Phased Implementation Approach between 30 June and 03 November 2023.
Change Plan
Solution Analysis and Development
Completed
Start:
23 Mar 2023Due:
31 Mar 2023Completion:
31 Mar 2023Responsible Committee Review Completed
Completed
Start:
31 Mar 2023Due:
27 Apr 2023Completion:
27 Apr 2023Consultation Started
Completed
Start:
27 Apr 2023Due:
28 Apr 2023Completion:
28 Apr 2023Consultation Ended
Completed
Start:
28 Apr 2023Due:
16 May 2023Completion:
16 May 2023Final Change Report Issued
Completed
Start:
16 May 2023Due:
19 May 2023Completion:
19 May 2023Responsible Committee Recommendation
Completed
Start:
19 May 2023Due:
26 May 2023Completion:
26 May 2023Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
30 June 2023
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As a premise owner I want to be able to contract with a Safe Isolator Provider (SIP), and for the SIP to be able to provide the service in a fully compliant manner.
- As a REC MEM who wants to operate as SIP, I need clarity on the solution and Market Message requirements when I provide Safe Isolation Works to Premise Owners. As a Registered Supplier, I need clarity on the solution and Market Message requirements when my consumers have Safe Isolation Works completed at their Premise Owners by SIPs.
- As a Distribution Network Operator, I need clarity on the solution and Market Message requirements when my connected parties have Safe Isolation Works completed at their Premise Owners by SIPs.
Proposed Solution Document
Document title
R0101 - Legal text changes for FCR - 19.05.2023
Archive
Off
Document title
FCR R0101 MM & Standards Definition v2.0
Archive
Off
Problem Statement
Updated: 28/04/2023. Following an implementation webinar for R0021 on 2 March, several matters were raised by Parties regarding the solution and the Market Messages that the Code Managers needs to address to ensure that the solution approved by Ofgem can be implemented successfully.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0101 Change Proposal Form (downloadable version) 23.03.2023
R0101 - Safe Isolation Provider Solution Overview - V5.0 19.5.2023
R0101 - Initial Assessment Report (approved) - v1.0 06.04.2023
R0101 - Change Proposal Plan - v3.0
R0101 Preliminary Change Report v2.0 (Approved) 28.04.2023
Phased Implementation Approach v1.0 28.04.2023
FAQ's Webinar 09 May 2023 v1.0
Non-Confidential Consolidated Consultation Responses v1.0 19.05.2023
R0101 - Draft Legal text for FCR v2.0 MM & Standards Definition
R0101 Final Change Report
Company Name
REC
Review status
Review required
Schedule 14 - Metering Operations 3.1
– Implemented on
Loading...
Creating a Meter Operator Agent and MOCoP Installer
Date of latest update
Type
Change
ID
R0064
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
This Change Proposal seeks to clarify the obligations of each type of metering provider by reintroducing the distinction between Meter Operator Agents and MOCOPA Meter Installers which was removed by Retail Code Consolidation. At Retail Code Consolidation these organisations were merged into a new category, Metering Equipment Managers, which also included gas metering providers. Whilst both types of organisation can provide metering services, not all MEM obligations in the REC apply to both organisations.
Change Plan
Solution analysis and development
Completed
Start:
22 Aug 2022Due:
14 Jul 2023Completion:
13 Jul 2023Service Impact assessment commenced
Completed
Start:
14 Jul 2023Due:
14 Jul 2023Completion:
14 Jul 2023Impact Assessment Period Ended
Completed
Start:
09 Oct 2023Due:
03 Nov 2023Completion:
03 Nov 2023Preliminary Change Report issued
Completed
Start:
03 Nov 2023Due:
24 Nov 2023Completion:
24 Nov 2023Consultation issued
Completed
Start:
24 Nov 2023Due:
07 Dec 2023Completion:
07 Dec 2023Final Change report issued
Completed
Start:
07 Dec 2023Due:
26 Jan 2024Completion:
26 Jan 2024REC Change Panel decision
Completed
Start:
26 Jan 2024Due:
06 Feb 2024Completion:
06 Feb 2024Appeal Window closed
Completed
Start:
06 Feb 2024Due:
20 Feb 2024Completion:
20 Feb 2024Draft Legal Text Changes (Including Legal Review)
Completed
Start:
11 Aug 2023Due:
15 Sep 2023Completion:
15 Sep 2023Service Provider Impact Assessment Completed
Completed
Start:
14 Jul 2023Due:
11 Aug 2023Completion:
11 Aug 2023Impact Assessment Period Started
Completed
Start:
15 Sep 2023Due:
09 Oct 2023Completion:
06 Oct 2023Impacted Consumers
Impacted REC Documents
Status
Implementation Date
28 June 2024
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As an electricity MEM, I want to be clear on the obligations I need to meet, based on the type of metering activity I complete. I want to meet my obligations efficiently and effectively and without the need to seek additional input/advice from the Code Manager.
- As the Code Manager, I want to be able to differentiate between electricity MEMs based on the type of activity they are responsible for and their interaction with central systems, so that I can engage appropriately. I need to be clear on the obligations that each MEM should be meeting and the performance reporting that should be provided.
Proposed Solution Document
Document title
R0064 - DRAFT legal text 24.11.2023
Archive
Off
Document title
R0064 - Roles Version F for Impact Assessment 4.10.2023
Archive
Off
Problem Statement
The REC currently groups all electricity metering providers within the MEM category. Previously, under the Master Registration Agreement (MRA) they were either classified as Meter Operator Agent or MOCOPA Meter Installers. Not all MEM obligations in the REC are intended to apply to both types of organisations. This can result in ambiguity on the obligations set out in the REC that need to be met by the different types of electricity MEM, not being able to target information to REC Parties appropriately and MEMs not being clear on their new entrant or Maintenance of Qualification obligations.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0064 - Change Proposal Form
R0064 - Change Proposal Plan v1.0 (Approved)
R0064 - Initial Assessment Report v1.0 (Approved)
R0064 - Change Proposal Plan v2.0 (Approved) 21.02.2023
R0064 - Change Proposal Plan v3.0 (Approved) 23.6.2023
R0064 - Change Proposal Plan v4.0 (Approved) 14.8.2023
R0064 - Change Proposal Plan v5.0 (Approved) 14.09.2023
R0064 - Change Proposal Plan v6.0 (Approved) 10.11.2023
Consolidated Impact Assessment Responses 29.11.2023
R0064 - Preliminary Change Report - V1.1 (Approved) 05.12.2023
R0064 - Consolidated Consultation Responses
R0064 - Final Change Report v1.0 (Approved)
Company Name
-
Review status
Review required
Schedule 14 - Metering Operations 3.0
– Implemented on
Loading...