Introduction of Defined Electricity Metering Work Categories for Metering Accreditation

Date of latest update
Type
Issue
ID
I0335
Priority
Urgent
No
Latest Update
25/06/2026 - Issue accepted in by Code Manager
Summary
Currently, there are no clearly defined or standardised categories of work for electricity third-party activities within CoMCoP. This lack of categorisation reduces transparency of company capabilities and scope of work, limits the ability to align accreditation with actual operational activity and restricts the ability to apply targeted, risk-based audit assurance.
Proposer
David Haddock
Impacted REC Documents
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
I0335 submission form.pdf
Company Name
-
Review status
Review required

Review of Metering Accreditation

Date of latest update
Type
Issue
ID
I0334
Priority
Urgent
No
Latest Update
01/08/2026 - Issue being assessed by the Code Manager.
Summary
This Change Proposal seeks to ensure that the REC is reflective of current practice regarding initial approval of Metering Equipment Manager, Electricity Metering Operative, Approved Meter Installer, and approved AMR Service Provider, that have been determined by the Metering Scheme Auditor, Wilcock Consultants Ltd, in April 2023.
Proposer
francine.peyroux-sissoko
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
I0334 submission form
Company Name
-
Review status
Review required

Regulatory Alliance Creation Rejections

Date of latest update
Type
Issue
ID
I0331
Change Category
Change Path
Priority
Urgent
No
Latest Update
19/08/2026 - the Change Report (Proposal Plan) was approved by Change Panel. The Change Team and Performance Assurance team are working together to determine if there are performance assurance requirements for this change.
Summary
An incident where Network Parties did not submit Regulatory Alliances on time to the Central Switching Service (CSS) Provider, or did submit the Regulatory Alliances but did not action rejections from the CSS Provider in a timely manner, led to over 200 Consumers being delayed in Switching to their chosen Energy Supplier. This Change Proposal has been raised to review this process.
Proposer
abedapatel
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0331 Schedule 24 Switching Data Management
Archive
Off
Problem Statement
The lack of Service Level Agreements (SLAs) on Network Parties to submit Regulatory Alliances to the CSS Provider or to work any rejections received from the CSS Provider can lead to delays in Consumers being able to Switch to their chosen Energy Supplier.
SME
SME Role
Lead Assurance Analyst
I0331 submission form
I0331 Change Report (Proposal Plan) V1.0 approved 18.08.26
Company Name
-
Review status
Review required

Removal of D0383 & D0384 requirements from Sharing MTDs process

Date of latest update
Type
Change
ID
R0328
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
14/08/2026 - the consultation has opened, responses must be received by 23:59 07 September 2026.
Summary
Schedule 14 - Metering Operations currently holds obligations for a Meter Operator Agent (MOA) to send a D0383 ‘Notification of Commissioning Information’ to Electricity Suppliers, Distribution Network Operators (DNOs), Data Services and Data Collectors in certain process steps. The D0383 was not shared with these Parties in legacy arrangements, and there is no requirement for it to be sent to facilitate the MHHS arrangements. There are similar requirements to send the D0384 ‘Notification of Commissioning Status’ to these Parties, when it is only required by the Electricity Supplier. These requirements were introduced by the MHHS Design in error and need to be removed.
Proposer
Harriet Truss
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 06.11.2026_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0328 legal text V0.1
Archive
Off
Problem Statement
Schedule 14 - Metering Operations puts obligations on MOAs which are both not required and impossible to fulfil (as the Scenario Variants to send the D0383 from the MOA to the Electricity Supplier, DNO, Data Service and Data Collector do not exist). There are similar problems for the D0384, which is only required to be sent from the MOA to the Electricity Supplier.
R0328 submission form
R0328 Change Report (Proposal Plan) v1.0 - approved 21.07.26
R0328 Change Report (For Consultation) V1.0 approved 12.08.26
Company Name
-
Review status
Review required

Provision of Standard industrial Classification (SIC) Code to REC Parties

Date of latest update
Type
Issue
ID
I0327
Priority
Urgent
No
Latest Update
22/05/2026 - Issue accepted in by Code Manager
Summary
As part of the planning required to deliver Net Zero, Gas Distribution Networks (GDNs) are obligated to plan Industrial and Commercial (I&C) gas demand at a more granular, site-specific level. To meet this obligation, access to Standard Industrial Classification (SIC) Code data, matched to both Gas and Electricity Meter Point Reference Numbers, would provide a significantly improved understanding of I&C customers.
Proposer
Sally Hardman
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
I0327 submission form
Company Name
-
Review status
Review required

Erroneous Switch Review: Assurance Reporting Update

Date of latest update
Type
Issue
ID
I0326
Change Path
Priority
Urgent
No
Latest Update
07/07/2025 - Change Report (Proposal Plan) has been approved by the REC Change Panel.
Summary
There is gap in the Erroneous Switch (ES) Performance Assurance reporting as the DTN does not provide MPXN level data up front. It requires individual ES permission before MPXNs are provided. However, CSS reporting does provide monthly MPXN level report. As such end-to-end monitoring of the ES process cannot be carried out at a MPXN level.
Proposer
Joy Nnamani
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
florentina.monea
Date of Update to Priority
Solution Development
I0326 submission form
I0326 Change Report (Proposal Plan) (Approved) v1.1 07.07.26
Company Name
-
Review status
Review required

This is my Test Change request submission

Consultation
Type
Issue
ID
I123Test
Change Path
Priority
Urgent
No
Latest Update
Empty
Summary
This a Test change request
Proposer
Sagar Agrawal
Change Report - Draft Change Report

Comments deadline
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
Stages Selection
Test.txt
Company Name
-
Review status
Review required

Use of REL Data to Support Key Regulations

Date of latest update
Type
Issue
ID
I0324
Priority
Urgent
No
Latest Update
13/08/2026 - Currently under review by Code Manager.
Summary
The REC Electricity Enquiry Service (EES) Service Definition and Electricity Data Access Matrix (DAM) limits access of REL data to the Authority. This Issues seeks to extend access to the Code Manager and government departments in Great Britain to facilitate key government reporting and REC processes.
Proposer
James Hardy
Impacted REC Documents
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
I0324 submission form
Company Name
-
Review status
Review required

Erroneous Switch Review: I0237 Clarifications

Date of latest update
Type
Change
ID
R0322
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/08/2026 - The Change Report (For Consultation) has been published and open for comments until 23:59 on 14/08/2026
Summary
The I0237 working group has carried out an end-to-end review of the Erroneous Switch process. The working group highlighted housekeeping changes and clarifications within Schedule 30 and the Market Messages.
Proposer
James Hardy
Change report - Final Change Report

Comments deadline
Status
Implementation Date
Status Live
EMAR Version 06.11.2026_live
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Erroneous Switch Review - I0237 Clarifications (12.05.2026) V1.0
Archive
Off
Document title
R0322 Legal Drafting V1.1
Archive
Off
Problem Statement
The current Erroneous Switch drafting contains inconsistencies that can cause confusion and misunderstanding between Energy Suppliers regarding the applicable governance and process requirements, creating ambiguity around the correct contractual and operational framework. In addition, the I0237 Working Group has identified further required amendments to Schedule 30, highlighting that the existing drafting does not fully or accurately reflect intended process arrangements or correct terminology.
SME
SME Role
Lead Technical Analyst
R0322 submission form
R0322 - Change Report (Proposal Plan) V1.0 (Approved) 19.05.2026
R0322 Consolidated IA Responses
Company Name
-
Review status
Review required

DNOs Create Export MPANs after approving G98/99 commissioning documents

Date of latest update
Type
Change
ID
R0321
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/08/2026 - the consultation is open, responses must be received by 23:59 14 September 2026.
Summary
The creation of Import Metering Points for new Premises sits with the Distribution Network Operator (DNO), while the Export Metering Points generally sit with the Electricity Supplier. When the DNO approves the G98 Engineering Recommendation Installation Document (Form B) or G99 Engineering Recommendation Installation Document (Form A3-1 or A3-2) under the Distribution Code, they could create Export Metering Points at this time (with the logical Disconnection process being available for any Export Metering Points that are then not required).
Proposer
Ben Atkinson
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 25.06.2027_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Schedule 27 RMP lifecycle draft V0.1
Archive
Off
Document title
Schedule 27 RMP lifecycle draft V0.2
Archive
Off
Problem Statement
The information required by the DNO to create an Export Metering Point sits with the Consumer rather than the Electricity Supplier, and leads to the Electricity Supplier acting as an unnecessary third party in the process. This is leading to unnecessary time being added to the process, negatively impacting Consumers and the journey to Net Zero. This is particularly apparent for large new housing developments, which may have several tens of thousands of Export Metering Points to create with the same DNO and require the use of the Bulk Request process. This process is cumbersome and has no two DNOs operating the process in the same way.
SME
SME Role
Lead Assurance Analyst
R0321 submission form
R0321 Change Report (Proposal Plan) Approved 05.05.26
R0321 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0321 Update to Plan V1.0 approved 18.08.26
R0321 Change Report (For Consultation) approved 18.08.26
Company Name
-
Review status
Review required