Release of Community View Data Items to MEMs in GES

Date of latest update
Type
Change
ID
R0074
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/06/2023 The system changes associated with this change were successfully implemented as planned on Friday 02 June 2023.
Summary
This Change Proposal will enable MEMs to ‘Community View’ access to a limited set of data in the GES, for sites where they are not the appointed MEM.
Proposer
David Addison
Change Plan

Service Provider Impact Assessment

Completed

Start:

05 Oct 2022

Due:

21 Nov 2022

Completion:

16 Dec 2022

Party Impact Assessment

Completed

Start:

21 Nov 2022

Due:

21 Nov 2022

Completion:

18 Dec 2022

Preliminary Change Report Issued

Completed

Start:

21 Nov 2022

Due:

13 Jan 2023

Completion:

13 Jan 2023

Consultation closure

Completed

Start:

13 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Responsible Committee Decision

Completed

Start:

27 Jan 2023

Due:

22 Feb 2023

Completion:

22 Feb 2023
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 24.02.2023_live
Included changes Affected REC Items
R0130 Updates to the Data Access Matrix
  • Schedule 12 - Data Access
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want a Metering Equipment Manager to be able to access and validate my site details, ahead of their arrival on site for planned or emergency metering work, so that I do not experience any delays in work being completed and can have continuity of supply.
  2. As a MEM, I want access to sufficient data for sites where I am not the Appointed MEM, to enable me to complete pre-metering works validations of the site details, so I can undertake these works correctly and safely.
  3. As a MEM, I want access to data for sites where I am not the Appointed MEM, so I can confirm de-appointments and answer invoice validation queries.
Proposed Solution Document
Document title
GES Data Access Matrix for R0074
Archive
Off
Problem Statement
At go-live for REC v3.0 the ‘Community View’ access to data in the GES, previously available via the DES under the UNC, was inadvertently removed. MEMs used this data in a number of processes, including validation of site details prior to metering works – particularly for emergency work, and the resolution of invoice queries from Suppliers. Without access to this Enquiry Service Data, MEMs are unable to complete activities that are central to their operations, including checking site details prior to attending emergency metering works. This has the potential to have a direct negative impact on the experience of metering works for Consumers, and in in some cases, continuity of supply and safety could be at risk.
Change Proposal Form
R0074 - Change Proposal Plan v1.0
R0074 - Initial Assessment Report v1.0 (Approved)
R0074 - Consultation Responses_NON CONFIDENTIAL
R0074 - Preliminary Change Report v1.0 (Published for Consultation)
R0074 - Final Change Report v2.0 (Post-Vote) 22.02.2023
Company Name
Xoserve
Review status
Review required

Introduction of a Housekeeping Change Proposal Process

Date of latest update
Type
Change
ID
R0073
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented 01 April 2023
Summary
Introduction of a proportionate change process for the implementation of housekeeping changes to the REC. This change will also implemented other non-material housekeeping changes to Schedule 5 - Change Management. These are being progressed alongside the introduction of a housekeeping change process to enable an efficient delivery.
Proposer
Colette Baldwin
Change Plan

Preliminary Change Report

Completed

Start:

27 Sep 2022

Due:

27 Jan 2023

Completion:

27 Jan 2023

Preliminary Change Report Consultation Start (due to end 10/02/23)

Completed

Start:

27 Jan 2023

Due:

27 Jan 2023

Completion:

10 Feb 2023

Final Change Report

Completed

Start:

27 Jan 2023

Due:

28 Feb 2023

Completion:

24 Feb 2023

Responsible Committee Decision

Completed

Start:

28 Feb 2023

Due:

07 Mar 2023

Completion:

07 Mar 2023
Status
Implementation Date
Status Live
EMAR Version 01.04.2023_live
Included changes Affected REC Items
R0100 Update to Error Handling Documents
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As the Code Manager I want to be able to progress change to the REC in the most efficient way possible. Where minor, non-material changes are needed to correct typographical or consistency errors, or to update out of date reference, I want a simpler and more accelerated change process to manage these housekeeping activities.
  2. As a REC Party, I want the Code Manager to use a more efficient process for housekeeping changes, that reduces the burden of managing industry changes through the standard change process.
  3. As RECCo I want the Code Manager to use the most efficient and simplest process to manage housekeeping changes in order to free up Code Manager resources to progress higher priority changes.
Proposed Solution Document
Document title
R0073 - Final Legal Text v1.0 24.02.23
Archive
Off
Document title
Draft Legal Text Schedules 1 and 5 Changes V1.0
Archive
Off
Document title
R0073 - Process Flow diagram
Archive
Off
Problem Statement
Typographical errors, formatting, and consistency errors (such as Paragraph numbering), out-of-date references to documents and updating addresses (including email) all have to go through the standard change process. In these cases, the changes are not material and do not need a solution to be developed nor do they need to demonstrate that they meet a business case and could therefore be progressed more quickly.
Housekeeping Change Process Document v1.0
R0073- Housekeeping Change Proposal Process Change Form
R0073 - Change Proposal Plan R0073 v1.0 (Approved)
R0073 Initial Assessment Report v1.0 (Approved)
R0073 - Consolidated Consultation Responses v1.0 24.02.23
R0073 - Preliminary Change Report - v1.0 (Published for consultation) - 27/01/2023
R0073 - Final Change Report V2.0 (Post Vote) - 09/03/2023
Company Name
-
Review status
Review required

DCC access to EES and GES

Date of latest update
Type
Change
ID
R0071
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/11/2023 - R0071 is approved by Change Panel for implementation in February release.
Summary
This Change seeks to create a new User Category in REC Schedule 12 – Data Access, to allow the Switching Service Desk to access the Gas and Electricity Enquiry Services (GES and EES). This would result in more expeditious Service Desk ticket resolution and a positive indirect impact on consumer outcomes.
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment Due

Completed

Start:

25 Sep 2022

Due:

21 Sep 2023

Completion:

Preliminary Change Report Issued

Completed

Start:

21 Sep 2023

Due:

06 Oct 2023

Completion:

Responsible Committee Review

Completed

Start:

06 Oct 2023

Due:

17 Oct 2023

Completion:

17 Oct 2023

Consultation Issued

Completed

Start:

17 Oct 2023

Due:

20 Oct 2023

Completion:

20 Oct 2023

Final Change Report Issued

Completed

Start:

20 Oct 2023

Due:

10 Nov 2023

Completion:

10 Nov 2023

Responsible Committee Decision

Completed

Start:

10 Nov 2023

Due:

21 Nov 2023

Completion:

21 Nov 2023
Impacted REC Documents
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 23.02.2024_live
Included changes Affected REC Items
R0100 Update to Error Handling Documents
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want data relating to my energy supply to be handled appropriately, so that I can have a consistent and faultless switching experience.
  2. As the Switching Service Desk, I want to be able to access market data that lets me resolve tickets first time, so that I can provide a more efficient service to users. As the GES Provider, I want my users to be able to access information that helps them fulfil their objectives, so that the service is used as efficiently as possible. As the EES Provider, I want my users to be able to access information that helps them fulfil their objectives, so that the service is used as efficiently as possible.
Proposed Solution Document
Document title
R0071 Proposed Legal Text
Archive
Off
Problem Statement
The Switching Service Desk generates and resolves tickets relating to Switching Incidents and Switching Data queries for Market Participants. GES and EES data is currently unavailable to the Switching Service Desk and access would allow them to resolve tickets more effectively, resulting in a more efficient service and better SLA performance.
SME
SME Role
Lead Technical Analyst
R0071 - Change Proposal Form
R0071 Change Proposal Plan v2.0 (Approved) - 05.09.2023
R0071 Initial Assessment Report v1.0 (Approved) - 01.08.2023
R0071 Preliminary Change Report v1.0 (Approved) - 17.10.23
R0071 Consolidated Consultation Responses v1.0 - 10.11.23
R0071 Final Change Report V1.0 (Post-Vote) 21.11.23
Company Name
-
Review status
Review required

Provision of Enduring Test Environments

Date of latest update
Type
Change
ID
R0070
Change Category
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
Currently the REC does not require the Central Switching Service (CSS) and Switching Operator (SO) to provide the enduring test environments and test data for use by REC Parties when making necessary system changes for REC Change Proposals or internal system updates. This Change Proposal has been raised to introduce these obligations in to the REC.
Proposer
Beth Brown
Change Plan

Solution Analysis and Development

Completed

Start:

09 Sep 2022

Due:

06 Jun 2023

Completion:

06 Jun 2023

Service Provider Impact Assessment Period

Completed

Start:

06 Jun 2023

Due:

06 Oct 2023

Completion:

06 Oct 2023

Service Provider Impact Assessment

Completed

Start:

24 Nov 2023

Due:

03 Jan 2024

Completion:

03 Jan 2024

Party Impact Assessment Issued

Completed

Start:

06 Oct 2023

Due:

24 Nov 2023

Completion:

24 Nov 2023

Preliminary Change Report Issued

Completed

Start:

03 Jan 2024

Due:

16 Jan 2024

Completion:

16 Jan 2024

Responsible Committee Review

Completed

Start:

16 Jan 2024

Due:

23 Jan 2024

Completion:

23 Jan 2024

Consultation Issued

Completed

Start:

23 Jan 2024

Due:

26 Jan 2024

Completion:

26 Jan 2024

Final Change Report Issued

Completed

Start:

26 Jan 2024

Due:

23 Feb 2024

Completion:

23 Feb 2024

Responsible Committee Decision

Completed

Start:

23 Feb 2024

Due:

05 Mar 2024

Completion:

05 Mar 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 28.06.2024_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
James Hardy
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a CSS User I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues prior to go-live.
  2. As the SO, I want clarity on the obligations placed on me regarding the provision and maintenance of CSS Test Environments and data, so that I can meet my obligations and provide CSS Users and Service Providers with access to appropriate Test Environments.
  3. As a Switching Data Service Provider (SDSP), I want clarity on the obligations placed on me regarding the provision and maintenance of Test Environments and data, so that I can meet my obligations to test CSS changes. As a Switching Data Service Provider (SDSP), I want access to a CSS Test Environment, to enable me to test my systems and processes ahead of the implementation of complex or significant changes, so that I can identify any issues and address prior to go-live.
Proposed Solution Document
Document title
R0070 legal text v1.0 - Published with Impact Assessment
Archive
Off
Document title
R0070 Legal Text v2.0 - Published with Preliminary Change Report
Archive
Off
Document title
R0070 - Legal Text v3.0 - Approved for Implementation
Archive
Off
Document title
REC Category 3 - Environment Management Plan
Archive
Off
Document title
REC Category 3 Test Data Management Plan
Archive
Off
Problem Statement
For specific types of changes, industry system testing will be required to ensure the end-to-end Switching processes will work as expected following implementation. If Test Environments and Test Data are not available, CSS Users will not be able to complete testing to confirm their systems will operate correctly in the live environment. The REC currently doesn’t define specific obligations on Service Providers regarding enduring test systems and Test Data for Switching processes. The lack of specific obligations may impact the availability of appropriate Test Environments. This could impact the progression of improvements to Switching processes that require a technical change.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0070 Initial Assessment Report v1.0 (Approved)
R0070 - Preliminary Change Report (Approved 23.01.2024)
R0070 - Change Proposal Plan v2.0 (Approved)
R0070 - Change Proposal Form
R0070 - Consolidated Impact Assessment Responses
R0070 - Consolidated Consultation Responses
R0070 - Final Change Report V2.0 (Post-Vote) 05.03.2024
Company Name
-
Review status
Review required

Amendments to Sample Access Agreement

Date of latest update
Type
Change
ID
R0069
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
A number of Non-Party REC Service Users have entered into an Access Agreement with RECCo under the Code’s Qualification and Maintenance Schedule, to obtain access to the CSS and become a CSS User. These Access Agreements are based on the Sample Access Agreement appended to Schedule 9 to the Code, which DCC believes should have been revised to address issues they have identified.
Proposer
Cordelia Grey
Change Plan

PARTY IMPACT ASSESSMENT

Completed

Start:

02 Sep 2022

Due:

24 May 2024

Completion:

24 May 2024

PRELIMINARY CHANGE REPORT ISSUED

Completed

Start:

24 May 2024

Due:

18 Jul 2024

Completion:

18 Jul 2024

RESPONSIBLE COMMITTEE REVIEW

Completed

Start:

18 Jul 2024

Due:

30 Jul 2024

Completion:

30 Jul 2024

CONSULTATION ISSUED

Completed

Start:

30 Jul 2024

Due:

02 Aug 2024

Completion:

01 Aug 2024

FINAL CHANGE REPORT ISSUED

Completed

Start:

02 Aug 2024

Due:

12 Sep 2024

Completion:

12 Sep 2024

RESPONSIBLE COMMITTEE DECISION

Completed

Start:

12 Sep 2024

Due:

24 Sep 2024

Completion:

24 Sep 2024
Status
Implementation Date
Status Live
EMAR Version 08.11.2024_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want systems containing my information to be correctly assured, so that my personal information is kept safe and services I expect to be able to use are not disrupted.
  2. As a Non-Party REC Service User, I want the Access Agreement I sign before I can access services from the CRS Provider to give me the same protections as other service users, so I am protected from loss and liability caused by another service user, or the service itself.
  3. As the CRS Provider, I want Non-Party REC Service Users to be held to the same provisions as other CSS Users, so I am protected from loss and liability caused by them.
  4. As a CSS User, I want Non-Party REC Service Users to be held to the same
Proposed Solution Document
Document title
R0069 - draft Access Agreement v1.0
Archive
Off
Problem Statement
The CRS Provider has raised that the Sample Access Agreement appended to Schedule 9 – Qualification and Maintenance does not provide adequate protections to Non-Party REC Service Users or the CRS Provider regarding liabilities or data security.
SME
SME Role
Lead Assurance Analyst
Proposed legal Text submitted with the CP
Change Proposal Form - REC Sample Access Agreement v1.0 (1).pdf
R0069 - Change Proposal Plan v1.0 (Approved)
R0069 - Initial Assessment Report V1.0 (Approved)
R0069 Preliminary Change Report v1.0
R0069 Change Report Final Recommendation (Post Vote) V1.0
Company Name
-
Review status
Review required

Introduction of CSS refresh functionality

Date of latest update
Type
Change
ID
R0067
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release
Summary
CSS Market Messages sent by the Central Switching Service (CSS) to Switching Data Service Providers (SDSP) are either not being received, being received after Gate Closure, or are being received out of the order that they were originally sent in. This Change Proposal seeks to introduce a refresh functionality to mitigate these issues.
Proposer
Michael Taylor
Change Plan

Solution Analysis and Development

Completed

Start:

29 Aug 2022

Due:

19 Oct 2022

Completion:

19 Oct 2022

Service Provider Impact Assessment

Completed

Start:

19 Oct 2022

Due:

29 Mar 2023

Completion:

29 Mar 2023

Consultation

Completed

Start:

11 Apr 2023

Due:

09 May 2023

Completion:

28 Apr 2023

Preliminary Change Report Issued

Completed

Start:

29 Mar 2023

Due:

11 Apr 2023

Completion:

05 Apr 2023

Final Change Report Issued

Completed

Start:

Due:

Completion:

21 Jun 2023

Responsible Committee Decision

Completed

Start:

09 May 2023

Due:

28 Jun 2023

Completion:

28 Jul 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 06.12.2023_live
Included changes Affected REC Items
R0106 Performance Assurance Report Catalogue V5.1
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want the Switching process to work successfully, so that I can switch Energy Supplier without delays or issues.
  2. As the CSS Provider I want the messages I send to SDSPs to be received and processed successfully, so that there is no interruption to the Switching process or the Consumers’ Switching experience. As the CSS Provider, I want the functionality to be available for SDSPs to automatically resolve issues when messages are not received in the correct order or are received after Gate Closure, so that this work does not have to be done manually.
  3. As an SDSP, I want to be able to detect when I have not received the expected CSS messages, so that I am able to request that the missing messages are sent to me to process. As an SDSP I want to be able to request a refresh of CSS messages when they are not received in the correct order or they are received after Gate Closure, so that I am able to maintain an accurate reflection of the current Switch status and minimise impacts on CSS Users and Consumers.
Proposed Solution Document
Document title
R0067 - Legal Text at PCR
Archive
Off
Document title
R0067 - Legal Text at FCR
Archive
Off
Document title
R0067 - Cost Benefit Analysis and Conclusions v3.0
Archive
Off
Problem Statement
CSS messages not received by the SDSPs in the order they were sent or received, or after Gate Closure, can be difficult to detect and often require significant manual effort to resolve. This issue can directly impact Consumer switching experiences causing disruption and possible delays.
SME
SME Role
Lead Technical Analyst
R0067 - Change Proposal Form
R0067 - Consolidated Consultation Responses
R0067 - Change Proposal Plan v1.0
R0067 - Initial Assessment Report v1.0
R0067 - Change Proposal Plan v2.0 (Approved) 07.03.2023
R0067 - Change Proposal Plan v3.0 04.04.2023
R0067 - Preliminary Change Report v2.0 (Issued for Consultation) 14.04.2023
R0067 - Final Change Report (Post-Vote) 28.06.2023
Company Name
-
Review status
Review required

Inclusion of SMRS Data Items in EES (BSC CP1568 Consequential Change)

Date of latest update
Type
Change
ID
R0066
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This Change Proposal is a consequential change, to display new Balancing and Settlement Code (BSC) owned Data Items in the Electricity Enquiry Service (EES). These Data Items support the introduction of Registration Service Data Items that will be needed before Market-wide Half Hourly Settlement (MHHS) migration commences.
Proposer
Gemma Dixon
Change Plan

Solution Refinement

Completed

Start:

24 Aug 2022

Due:

23 Sep 2022

Completion:

23 Sep 2022

Service Provider Impact Assessment

Completed

Start:

23 Sep 2022

Due:

23 Sep 2022

Completion:

23 Sep 2022

Party Impact Assessment

Completed

Start:

23 Sep 2022

Due:

23 Sep 2022

Completion:

23 Sep 2022

Preliminary Change Report Issued

Completed

Start:

23 Sep 2022

Due:

04 Nov 2022

Completion:

04 Nov 2022

Consultation Issued

Completed

Start:

04 Nov 2022

Due:

04 Nov 2022

Completion:

04 Nov 2022

Final Change Report Issued

Completed

Start:

04 Nov 2022

Due:

09 Dec 2022

Completion:

09 Dec 2022

Responsible Committee Decision

Completed

Start:

09 Dec 2022

Due:

20 Dec 2022

Completion:

20 Dec 2022
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an impacted Market Participant, I want to ensure good quality underlying data is available to support the transition to HH Settlements to avoid additional time and effort being spent fixing data quality issues during the migration period.
  2. As the MHHS Programme, I want Registration Service Data Items to be available ahead of the MHHS migration to enable data cleanse activity to be completed to address data quality issues.
Proposed Solution Document
Document title
R0066 Solution Documents
Archive
Off
Problem Statement
There are Registration Service Data Items that are critical to the MHHS rules and processes. These need to be introduced into the existing Supplier Meter Registration Service (SMRS) system and also displayed in EES prior to the transition to Half Hourly (HH) Settlement, to facilitate MHHS Programme data cleanse activity.
SME
SME Role
Lead Technical Analyst
Change Proposal Form.pdf
R0066 Change Proposal Plan v1.0 (Approved)
R0066 Initial Assessment Report V1.0 (Approved)
R0066 Consolidated Impact Assessment responses
R0066 Preliminary Change Report v1.0
R0066 Consolidated Consultation Responses
R0066 - Final Change Report v2.0 (Post Vote)
Company Name
-
Review status
Review required

Creating a Meter Operator Agent and MOCoP Installer

Date of latest update
Type
Change
ID
R0064
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
This Change Proposal seeks to clarify the obligations of each type of metering provider by reintroducing the distinction between Meter Operator Agents and MOCOPA Meter Installers which was removed by Retail Code Consolidation. At Retail Code Consolidation these organisations were merged into a new category, Metering Equipment Managers, which also included gas metering providers. Whilst both types of organisation can provide metering services, not all MEM obligations in the REC apply to both organisations.
Proposer
Anton Moden
Change Plan

Solution analysis and development

Completed

Start:

22 Aug 2022

Due:

14 Jul 2023

Completion:

13 Jul 2023

Service Impact assessment commenced

Completed

Start:

14 Jul 2023

Due:

14 Jul 2023

Completion:

14 Jul 2023

Impact Assessment Period Ended

Completed

Start:

09 Oct 2023

Due:

03 Nov 2023

Completion:

03 Nov 2023

Preliminary Change Report issued

Completed

Start:

03 Nov 2023

Due:

24 Nov 2023

Completion:

24 Nov 2023

Consultation issued

Completed

Start:

24 Nov 2023

Due:

07 Dec 2023

Completion:

07 Dec 2023

Final Change report issued

Completed

Start:

07 Dec 2023

Due:

26 Jan 2024

Completion:

26 Jan 2024

REC Change Panel decision

Completed

Start:

26 Jan 2024

Due:

06 Feb 2024

Completion:

06 Feb 2024

Appeal Window closed

Completed

Start:

06 Feb 2024

Due:

20 Feb 2024

Completion:

20 Feb 2024

Draft Legal Text Changes (Including Legal Review)

Completed

Start:

11 Aug 2023

Due:

15 Sep 2023

Completion:

15 Sep 2023

Service Provider Impact Assessment Completed

Completed

Start:

14 Jul 2023

Due:

11 Aug 2023

Completion:

11 Aug 2023

Impact Assessment Period Started

Completed

Start:

15 Sep 2023

Due:

09 Oct 2023

Completion:

06 Oct 2023
Impacted Consumers
Status
Implementation Date
Status Live
EMAR Version 28.06.2024_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an electricity MEM, I want to be clear on the obligations I need to meet, based on the type of metering activity I complete. I want to meet my obligations efficiently and effectively and without the need to seek additional input/advice from the Code Manager.
  2. As the Code Manager, I want to be able to differentiate between electricity MEMs based on the type of activity they are responsible for and their interaction with central systems, so that I can engage appropriately. I need to be clear on the obligations that each MEM should be meeting and the performance reporting that should be provided.
Proposed Solution Document
Document title
R0064 - DRAFT legal text 24.11.2023
Archive
Off
Document title
R0064 - Roles Version F for Impact Assessment 4.10.2023
Archive
Off
Problem Statement
The REC currently groups all electricity metering providers within the MEM category. Previously, under the Master Registration Agreement (MRA) they were either classified as Meter Operator Agent or MOCOPA Meter Installers. Not all MEM obligations in the REC are intended to apply to both types of organisations. This can result in ambiguity on the obligations set out in the REC that need to be met by the different types of electricity MEM, not being able to target information to REC Parties appropriately and MEMs not being clear on their new entrant or Maintenance of Qualification obligations.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0064 - Change Proposal Form
R0064 - Change Proposal Plan v1.0 (Approved)
R0064 - Initial Assessment Report v1.0 (Approved)
R0064 - Change Proposal Plan v2.0 (Approved) 21.02.2023
R0064 - Change Proposal Plan v3.0 (Approved) 23.6.2023
R0064 - Change Proposal Plan v4.0 (Approved) 14.8.2023
R0064 - Change Proposal Plan v5.0 (Approved) 14.09.2023
R0064 - Change Proposal Plan v6.0 (Approved) 10.11.2023
Consolidated Impact Assessment Responses 29.11.2023
R0064 - Preliminary Change Report - V1.1 (Approved) 05.12.2023
R0064 - Consolidated Consultation Responses
R0064 - Final Change Report v1.0 (Approved)
Company Name
-
Review status
Review required

Addition of key information to all Service Now tickets

Date of latest update
Type
Change
ID
R0063
Change Category
Change Path
Priority
Urgent
No
Latest Update
The code elements of this change were implemented on the 12 April 2024. The technical solution will be delivered as part of the June 2024 REC Release.
Summary
This Change seeks to improve the key business information, required by the DNOs, included in the SNOW tickets produced by CSS Service Desk for CSS Asynchronously rejected messages
Proposer
Chris Price
Change Plan

Solution Analysis and Development

Completed

Start:

22 Aug 2022

Due:

07 Feb 2023

Completion:

07 Feb 2023

Service Provider Impact Assessment - Preliminary

Completed

Start:

07 Feb 2023

Due:

20 Mar 2023

Completion:

20 Mar 2023

Service Provider Detailed Impact Assessments

Completed

Start:

20 Mar 2023

Due:

10 Jul 2023

Completion:

27 Jun 2023

Preliminary Change Report issued

Completed

Start:

10 Jul 2023

Due:

14 Jul 2023

Completion:

14 Jul 2023

Responsible Committee review

Completed

Start:

14 Jul 2023

Due:

26 Jul 2023

Completion:

26 Jul 2023

Consultation trigger

Completed

Start:

26 Jul 2023

Due:

28 Jul 2023

Completion:

28 Jul 2023

Consultation close

Completed

Start:

28 Jul 2023

Due:

18 Aug 2023

Completion:

18 Aug 2023

Final Change Report issued

Completed

Start:

18 Aug 2023

Due:

15 Sep 2023

Completion:

14 Sep 2023

Responsible Committee decision

Completed

Start:

15 Sep 2023

Due:

27 Sep 2023

Completion:

27 Sep 2023
Status
Implementation Date
Status Live
EMAR Version 12.04.2024_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer I want the Switch process to work efficiently and effectively, so that I can switch Energy Supplier without unnecessary delay or issues.
  2. As an ERDS and GRDS, I want to receive SNOW tickets that contain all of the relevant data to enable me to triage and resolve issues efficiently, so that Consumers do not experience unnecessary switching delays and I am able to meet my service level obligations.
  3. As the CSS Provider, I want the ERDS related SNOW tickets to contain all of the relevant data to enable the efficient resolution of issues without the need for a manual workaround to be utilised, so that Consumers do not experience unnecessary switching delays.
Proposed Solution Document
Document title
Schedule 26 - Switching Service Management_R0063_FCR 15.09.2023
Archive
Off
Problem Statement
The SNOW tickets received by ERDS and GRDS for messages that CSS has asynchronously rejected (e.g., for business rule reasons) currently do not contain the relevant data for the SDSPs to triage and take any necessary action to resolve the underlying issue(s).This may delay the resolution of the SNOW tickets, potentially having an impact on aConsumers Switch.
SME
SME Role
Lead Technical Analyst
R0063 - Change Proposal Form
R0063 - Change Proposal Plan v1.0 (Approved)
R0063 - Initial Assessment Report v1.0 (Approved)
R0063 - Change Proposal Plan v2.0 (Approved) 21.02.2023
R0063 - Extension to Change Plan 2.0 (Approved) 04.04.2023
R0063 - Preliminary Change Report v1.0 (Approved) 26.07.2023
R0063 - Consolidated Consultation Responses
R0063 - Final Change Report v2.0 (Approved) 27.09.2023
Company Name
-
Review status
Review required

Removal of ERDA meteringPointEnergyFlow change restriction

Date of latest update
Type
Change
ID
R0062
Change Category
Change Path
Priority
Urgent
No
Latest Update
This change was implemented on 12 April 2024. *This change is expected to have a direct impact on the Market-wide Half Hourly Settlement Design for it to be maintained in the enduring arrangements. The change has been approved as it has value for the interim period.*
Summary
As part of the Faster Switching Programme Enactment Phase change CR-E37, a restriction was applied to Electricity Retail Data Agents (ERDAs) to prevent multiple changes being made to the RMP. Any errors can be rectified once in the lifetime of an RMP, back to the creation of the RMP. This change has been raised to allow ERDAs to make more than one change to Energy Flow to improve data accuracy without requiring a new RMP
Proposer
Daniel Tadecicco
Change Plan

Solution analysis and development completed

Completed

Start:

22 Aug 2022

Due:

16 Aug 2023

Completion:

16 Aug 2023

Service Provider impact assessment started

Completed

Start:

16 Aug 2023

Due:

18 Aug 2023

Completion:

18 Aug 2023

Service Provider impact assessment completed

Completed

Start:

18 Aug 2023

Due:

25 Sep 2023

Completion:

25 Sep 2023

Party impact assessment issued

Completed

Start:

25 Sep 2023

Due:

19 Oct 2023

Completion:

13 Oct 2023

Party impact assessment closed

Completed

Start:

19 Oct 2023

Due:

09 Nov 2023

Completion:

03 Nov 2023

Preliminary Change Report issued

Completed

Start:

09 Nov 2023

Due:

08 Dec 2023

Completion:

07 Dec 2023

Responsible Committee review

Completed

Start:

08 Dec 2023

Due:

19 Dec 2023

Completion:

19 Dec 2023

Consultation issued

Completed

Start:

19 Dec 2023

Due:

22 Dec 2023

Completion:

22 Dec 2023

Consultation closed

Completed

Start:

22 Dec 2023

Due:

23 Jan 2024

Completion:

23 Jan 2024

Final Change Report issued

Completed

Start:

23 Jan 2024

Due:

09 Feb 2024

Completion:

08 Feb 2024

Responsible Committee decision

Completed

Start:

09 Feb 2024

Due:

20 Feb 2024

Completion:

20 Feb 2024

Appeal window closure

Completed

Start:

20 Feb 2024

Due:

06 Mar 2024

Completion:

06 Mar 2024
Status
Implementation Date
Status Live
EMAR Version 12.04.2024_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want any metering data issues to be resolved without the need for a new MPAN to be created, so that I am able to reference my current MPAN in any discussions with my Energy Supplier or other Market Participants.
  2. As an ERDA, I want to be able to correct the Metering Point Energy Flow Data Item more than once, to remove the need for the termination of RMPs and the creation of new RMPs and to facilitate data accuracy. As an impacted Market Participant, I want to ensure good quality underlying data is available to support the transition to MHHS to avoid additional time and effort being spent fixing data quality issues during the migration period.
  3. As an Energy Supplier, I want data issues associated with the Metering Point Energy Flow to be resolved without the need to create a new RMP, so that my Settlement accuracy and performance is not impacted As an Energy Supplier, I want data issues associated with the Metering Point Energy Flow to be resolved without the need to create a new RMP, so that discussions I have with my customers are not unnecessarily confused by a change in RMP reference.
Proposed Solution Document
Document title
R0062 - Solution Development Report 13.10.2023
Archive
Off
Document title
R0062 - Solution Development Report v3.0 06.12.2023
Archive
Off
Document title
R0062 Draft Legal text 07.12.2023
Archive
Off
Document title
R0062 - Approved Legal Text 20.02.2024
Archive
Off
Problem Statement
To maintain accurate values for Settlement, DNOs must make regular changes to the LLFC Indicator in ERDS. Until June 2023, the meteringPointEnergyFlow has been tied to this Data Item, which has sometimes resulted in changes to the energy direction. For example, going from Import to Export. Where errors have been identified, the DNO needs to be able to correct meteringPointEnergyFlow back to the correct value to ensure data accuracy. The current restriction, to only one change of Energy Direction against an RMP, can be overcome through by terminating the existing RMP and creating a new RMP with the correct Metering Point Energy Flow value. This has a detrimental impact on the Consumer and Settlement. It is inconvenient for the Consumer to be assigned a new MPAN and Settlement relies on an accurate history that will be lost when a new MPAN is assigned.
SME
SME Role
Lead Technical Analyst
R0062 - Change Proposal Form
R0062 Removal of ERDA meteringPointEnergyFlow change restriction
R0062 - Change Proposal Plan v1.0 (Approved) 04.07.2023
R0062 - Initial Assessment Report v1.0 (Approved) 04.07.2023
R0062 Consolidated Impact Assessment Responses v1.0 07.12.2023
R0062 Preliminary Change Report v1.0 (Approved) 19.12.2023
R0062 Consolidated Consultation Responses v1.0 PUBLIC
R0062 - Final Change Report (Post-Vote) v2.0 20.02.2024
Company Name
-
Review status
Review required