Consequential Cross-Code Change for BSC P441 - Complex Site Classes Creation

Date of latest update
Type
Change
ID
R0268
Change Category
Priority
Urgent
No
Latest Update
12/03/2026 - this Change Proposal is with the Authority for decision.
Summary
The Balancing and Settlement Code (BSC) modification P441 is looking to introduce Complex Site classes which would categorise the types of Complex Site with each having clearly defined criteria within the BSC whilst also facilitating a new "type" of Complex Site (referred to as a Class 6 Complex Site) to allow approval of "non-standard" Complex Sites. It will also clarify when the netting of Imports from Exports for multiple Metering Systems registered in Supplier Volume Allocation (SVA) is permitted.
Proposer
Caroline Freimuller
Change Plan

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

21 Oct 2025
Status
Implementation Date
Status Live
EMAR Version 06.11.2026_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0268 Metering Operations v0.1 draft
Archive
Off
Problem Statement
The introduction of new Complex Site classes is needed into the REC to facilitate the solutions under BSC P441 and DCP 424.
I0268 Submission Form
I0268 Change Report (Proposal Plan) V1.1 approved 21.10.25
R0268 Change Report (For Consultation) V1.0
R0268 Consolidated Consultation responses V1.0
R0268 Extension to Plan V1.0
R0268 Change Report Final Recommendation V1.0 post vote
Company Name
-
Review status
Review required

Increasing frequency of Annual portfolio reconciliation exercise to support Data Cleanse

Date of latest update
Type
Change
ID
R0252
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
02/09/26 - An update to plan has been published for consideration at MEP on 09 September 2026.
Summary
This Issue seeks to explore making changes to both the frequency and turnaround time of the annual portfolio reconciliation exercise conducted by the CDSP.
Proposer
shelley.rouse
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0252 Legal Drafting V2.0
Archive
Off
Problem Statement
The annual portfolio reconciliation exercise conducted by the CDSP on MAM-held Data Items is neither frequent enough nor is it expeditious enough, according to the Proposer. MAMs are being asked to reconcile Data Items several months after they were initially provided, which may impact the efficacy of the exercise if these Data Items have changes since they were initially submitted.
SME
SME Role
Lead Technical Analyst
SME User
awaghorn@deloitte.co.uk
SME Role
Lead Assurance Analyst
R0252 - Issue Proposal V1.0
R0252 Change Proposal Re-Plan (Approved) V1.0 21.10.25
R0252 - Change Report (Plan) (Approved) V3.0 04.02.26
R0252 Change Proposal Re-Plan (Approved) V2.0 27.01
R0252 - Change Report (IA) V1.0 12.02.26
R0252 Change Proposal Re-Plan V3.0
R0252 Change Proposal Re-Plan V4.0
Company Name
-
Review status
Review required

C21 to be introduced into STIRG Document

Date of latest update
Type
Change
ID
R0244
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
This change proposes to add a new category 3 asset condition code to the Guidance for Service Termination Issue Reporting (STIRG) document, to allow Meter Operator Agents (MOAs) to report to the Distribution Network Operator (DNO) where the meter supply neutral is fed via a shared additional N/E block without having to abort the meter work.
Proposer
Chris Varney
Change Plan

Proposal Plan approved by Change Panel

Completed

Start:

Due:

Completion:

01 Apr 2025

Approved at Metering Expert Panel

Completed

Start:

Due:

Completion:

09 Jul 2025
Status
Implementation Date
Status Live
EMAR Version 27.02.2026_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
C21 proposed legal text
Archive
Off
Document title
Non-standard PME arrangement - for consultation
Archive
Off
Document title
R0244 STIR Fully Red Lined post consultation
Archive
Off
Problem Statement
Parties are having to unnecessarily abort installs where there is a non-standard PME connection arrangement as there is no category 3 asset issue reporting option within the STIRG document.
Proposal form
I0244 Change Report (Proposal Plan) v1.0 Approved 01.04.25
I0244 Consolidated Impact Assessment Responses PUBLIC v1.0
R0244 Change Report (For Consultation) V1.0
R0244 Consolidated Consultation Responses v1.0
R0244 Change Report (Final Recommendation) V1.0 post vote
Company Name
-
Review status
Review required

Amending contractual obligations for SIPs at Non-Domestic Premises

Date of latest update
Type
Change
ID
R0217
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 1 April Extraordinary REC Release.
Summary
The contractual obligations in section 21 of Schedule 14 are too restrictive or not relevant to Non-Domestic Premises making delivering isolators to Non-Domestic Premises more complex than it needs to be.
Proposer
Andy Knowles
Change Plan

Proposal Plan approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jan 2025

Change approved by Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Mar 2025
Status
Implementation Date
Status Live
EMAR Version 01.04.2025_live
Included changes Affected REC Items
R0101 Revision of the Implementation Date and approved solution for R0021
  • Schedule 1 - Interpretations and Definitions
  • Schedule 14 - Metering Operations
  • Schedule 15 - Metering Accreditation
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Non-Domestic Consumers who occupy (but do not own) a Premises with relevant permissions allowing metering work to occur are unable to contract with SIPs due to the restrictions in section 21 of Schedule 14 Metering Operations.
SIP Non-Domestic contracting red lining.docx
R0217 Change Proposal form
R0217 Change Report (Proposal Plan) V1.0 Approved 21.01.25
R0217 Change Report (For Consultation) V1.0
R0217 Consolidated Consultation Responses PUBLIC V1.0
R0217 Change Report (Final Recommendation) V1.0 Post Vote
Company Name
-
Review status
Review required

REC Changes to tie in with DCP419

Date of latest update
Type
Change
ID
R0216
Change Category
Priority
Urgent
No
Latest Update
19/01/2026 - on 19 January 2026, the Authority published their decision to reject R0216, in line with the recommendation from both the Metering Expert Panel and the Code Manager.
Summary
DCP419 is looking to place obligations on any Party or agent to update the DNO before any planned de-energisation or comms interruptions on sites with a smart meter. This is to allow DNOs to be able to manage any off supply notifications (via AD1 alerts).
Proposer
Lorna Mallon
Change Plan

Discussed at Change Issues Group

Completed

Start:

Due:

Completion:

07 Nov 2024

Change Report (Proposal Plan) approved by Change Panel

Completed

Start:

Due:

Completion:

18 Feb 2025

Change Report (For Consultation) approved by MEP

Completed

Start:

Due:

Completion:

09 Jul 2025

Change Report (Final Recommendation) presented at Metering Expert Panel

Completed

Start:

Due:

Completion:

10 Sep 2025
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0216 - Schedule 14 - Metering Operations (MHHS) - v0.2 (02.07.2025)
Archive
Off
Problem Statement
DNOs may be unnecessarily contacting Consumers where an AD1 notification is generated but the Consumer is having planned works involving their Electricity Smart Meter or Communications Hub replacements for their Electricity Smart Meter. This may create a poor Consumer experience.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
DCP 419 Market Message Specification.docx
Issue Form
I0216 Change Report (Proposal Plan) v1.0 Approved 18.02.25
I0216 Solution Development Report V1.0
I0216 Consolidated Impact Assessment Responses PUBLIC v1.0
I0216 Extension to Plan V1.0 Approved 06.05.25
R0216 Extension to Plan V2.0 Approved 27.06.25
R0216 Change Report (For Consultation) V1.0 approved 09.07.25
R0216 Consolidated Consultation Responses PUBLIC V1.0
R0216 Change Report (Final Recommendation) V1.1 post vote
Ofgem decision to reject R0216
Company Name
-
Review status
Review required

Import / Export MOA Charging Clarification

Date of latest update
Type
Change
ID
R0207
Change Category
Priority
Urgent
No
Latest Update
On 07 August 2026, Ofgem approved this Change Proposal, in line with the recommendation made by the Code Manager and the Metering Expert Panel. R0207 will be implemented on 06 November 2026. Ofgem's decision can be found here: https://www.ofgem.gov.uk/publications/r0207-retail-energy-code-rec-proposed-changes
Summary
BSC Mod 459 and REC CP R0144 were raised to allow different MOAs to be appointed for the import and export MPANs on a shared meter. One of the justifications for this was to stop export suppliers being charged inflated rates. Both changes have been placed on hold due to the MHHS Programme so this change has been raised to specifically resolve the charging issue.
Proposer
Jon Hawkins
Change Report - Draft Change Report

Comments deadline
Change report - Final Change Report
Change Plan

Final recommendation to Metering Expert Panel

Completed

Start:

Due:

Completion:

12 Mar 2025

Sent to Authority for determination

Completed

Start:

Due:

Completion:

13 Mar 2025
Impacted Consumers
Impacted REC Documents
Implementation Date
Status Live
EMAR Version 06.11.2026_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Schedule 14 - Metering Operations R0207 v0.1
Archive
Off
Document title
Schedule 14 - Metering Operations R0207 v0.2
Archive
Off
Problem Statement
Where the same electricity Metering Asset is being used for the measurement of Import and Export for more than one Metering Point, the Export MOA must be the same as the Import MOA. This may result in uncompetitive charging by the MOA, as the Export Supplier has no choice in their appointment.
Workgroup
Workgroup(s)
Change Proposal Form
R0207 - Change Report (Proposal Plan - Approved) V2.0 15.10.2024
R0207 Consolidated Impact Assessment Responses PUBLIC V1.0
R0207 Extension to Plan v1.0
R0207 Change Report (For Consultation) v1.0
R0207 Consolidated Consultation Responses PUBLIC V1.0
R0207 Change Report (Final Recommendation) V1.0 Post Vote
Authority Decision Letter - Ofgem Decision to Send Back R0207 (30.05.2025)
R0207 Revised Solution - Legal Text
R0207 Change Report (Impact Assessment) Revised Solution V2.0
Legal Drafting Revised Solution March 2026
Non Confidential consolidated impact assessment responses
R0207 Consolidated Consultation Responses (revised solution)
Authority decision to approve R0207
Company Name
Gemserv
Review status
Review required

Review of Metering Asset data transferred from MAMs to the CDSP

Date of latest update
Type
Issue
ID
I0196
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
02/09/2026 - Update to plan published ahead of review at the REC Metering Expert Panel on 09 September 2026.
Summary
It has emerged that a high proportion of gas Data Items contain mismatches when comparing between Metering Asset Managers (MAM), Gas Suppliers, and the Central Data Service Provider. This Issue seeks to explore this issue and identify mechanisms by which these mismatches may be resolved.
Proposer
Amy Crowe-Lamont
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Work conducted by RPA has identified a significant number of mismatches between gas Data Items held by key stakeholders. This may result in Consumer detriment, as information relevant to an MPRN may not be held accurately by any given Party. As such, there is a need to review processes pertaining to the communication of gas data by MAMs onward to the CDSP to mitigate the potential for mismatches.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0196 Issue Proposal Form (Word)
I0196 Issue Proposal Form (PDF)
I0196 Change Report (Plan) (Approved) V2.0 07.05.25
I0196 Change Re-Plan (Approved) V1.0 02.05.25
Company Name
-
Review status
Review required

Introducing a Process to Provide Updates During Fault Resolutions

Date of latest update
Type
Issue
ID
I0197
Change Category
Priority
Urgent
No
Latest Update
10/06/2026 - The Code Manager, following an approval to an Update to Plan by the REC Metering Expert Panel, has placed I0197 on hold.
Summary
Some customers have had faulty meters for a prolonged period, which impacts billing and settlement, and can prevent customers accessing specific tariffs. Currently the REC only has obligations relating to electricity meter faults, and these do not actually require work to be done to address faults. This issues proposes the introduction a maximum timeframe Fault Resolution deadline to resolve issues around faulty meters.
Proposer
Amy Crowe-Lamont
Change Report - Initial Assessment and Change Plan Report
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Date of Update to Priority
Solution Development
Problem Statement
Consumers have had faulty meters for a prolonged period, which impacts billing and settlement, and can prevent customers accessing specific tariffs.
SME
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0197 - Change Proposal Form
I0197 - Change Report (Proposal Plan) V1.0 (Approved) 03.06.2025
I0197 - Update to Plan V3.0 (On Hold) 03.06.2026
Company Name
-
Review status
Review required

Metering Asset Manager (MAM) Communication Method Register

Date of latest update
Type
Change
ID
R0198
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
Studies conducted by the REC Performance Assurance (RPA) function of the REC Code Manager have concluded that gas market data fidelity may be improved by reducing the frequency of missed messages between Metering Asset Managers and other REC Parties. This Issue seeks to explore mechanisms by which a reduction in the number of permissible communication methods used by MAMs could support the data quality improvement objective.
Proposer
Amy Crowe-Lamont
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 27.02.2026_live
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0198 - Draft Schedule 14 - Metering Operations & Draft Communications Method Register
Archive
Off
Document title
R0198 - Draft Schedule 14 - Metering Operations & Draft Communications Method Register V2.0
Archive
Off
Problem Statement
MAMs communicate with each other, and with other parties, using up to three possible methods as they send Market Messages in line with their obligations in the REC. It has been suggested that moving to a single communication method might help mitigate gas data quality issues. This Issue seeks to explore an interim solution to facilitate this.
SME
SME Role
Lead Assurance Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0198 Change Proposal (pdf)
I0198 Change Report (Plan) (Approved) V2.0 03.04.2
I0198 Change Proposal Re-Plan V1.0 28.03.25
I0198 Change Report (IA) V1.0 03.04.25
R0198 Consolidated IA Responses V1.0 Non-Confidential
R0198 Change Report (Consultation) V1.0 11.06.25
R0198 Change Proposal Re-Plan V2.0 02.07.25
Change Report (Consultation) V2.0 11.07.25
R0198 Consolidated Consultation Responses V1.0 06.08.25
R0198 Change Report (Final Recommendation: Pre-Vote) V1.1 13.08.25
R0198 Change Report (Final Reccomendation - Post-Vote) V1.0 13.08.25
Company Name
-
Review status
Review required

Schedule 14 - Metering Operations Footnote Review

Date of latest update
Type
Change
ID
R0181
Change Category
Change Path
Priority
Urgent
No
Latest Update
23/08/2024 - This change was successfully implemented as part of the August 2024 Extraordinary REC Release on 23 August 2024.
Summary
The footnotes within Schedule 14 - Metering Operations are not in the correct place, are missing or no longer relevant. This Change Proposal looks to correct issues within the footnotes and move them into the legal text to prevent this from happening when future Change Proposals impacting this schedule are implemented.
Proposer
Holly Law
Change Plan

Change Proposal Plan and Impact Assessment Report issued

Completed

Start:

06 Jun 2024

Due:

18 Jun 2024

Completion:

18 Jun 2024

Preliminary Change Report issued

Completed

Start:

18 Jun 2024

Due:

19 Jun 2024

Completion:

19 Jun 2024

Consultation issued

Completed

Start:

19 Jun 2024

Due:

19 Jun 2024

Completion:

19 Jun 2024

Consultation Close

Completed

Start:

19 Jun 2024

Due:

10 Jul 2024

Completion:

10 Jul 2024

Final Change Report Issued

Completed

Start:

10 Jul 2024

Due:

11 Jul 2024

Completion:

11 Jul 2024

Responsible Committee Decision

Completed

Start:

11 Jul 2024

Due:

19 Jul 2024

Completion:

19 Jul 2024

Appeal Window Closure

Not Started

Start:

19 Jul 2024

Due:

02 Aug 2024

Completion:

Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Live
EMAR Version 23.08.2024_live
Included changes Affected REC Items
R0103 Central provision of DCC Technical Contacts for requesting test certificates
  • Schedule 25 - Central Switching Service
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
holly.law
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Metering Operations v4.1 footnote review legal drafting for PCR
Archive
Off
Document title
Metering Operations v4.1 footnote review legal drafting for FCR
Archive
Off
Problem Statement
REC parties are unable to ensure their processes and procedures correctly reflect their obligations as the footnotes within Schedule 14 - Metering Operations are not in the correct place, are missing or no longer relevant.
R0181 Change Proposal Plan (Approved) 18.06.2024
R0181 Initial Assessment Report (Approved) 18.06.2024
R0181 Preliminary Change Report
Consolidated Consultation Responses
R0181 Final Change Report - approved 22.07.24
Company Name
Code Manager
Review status
Review required