ERDS Service Definition timezone correction

Date of latest update
Type
Change
ID
R0060
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This change seeks to specify timezones within the ERDS Service Definition. For example: Data received by the ERDA shall be included within the ERDS Total Daily Processing on the basis that all data received prior to 23:00hrs is made available to the SMRA, EES Provider or CSS Provider (as applicable) by 06:00hrs the following Working Day. Data received after 23:00hrs will be made available to the SMRA, EES Provider or CSS Provider (as applicable) by the second Working Day
Proposer
Daniel Tadecicco
Change Plan

Change Proposal Plan and Impact Assessment Report Published

Completed

Start:

22 Aug 2022

Due:

18 Jun 2024

Completion:

18 Jun 2024

Change report and Consultation issued

Completed

Start:

18 Jun 2024

Due:

28 Jun 2024

Completion:

27 Jun 2024

Consultation closed

Completed

Start:

28 Jun 2024

Due:

19 Jul 2024

Completion:

19 Jul 2024

Responsible Committee decision

Completed

Start:

19 Jul 2024

Due:

28 Aug 2024

Completion:

28 Aug 2024

Appeal Window Closure

Not Started

Start:

28 Aug 2024

Due:

12 Sep 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 07.11.2025_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Supplier, I want to have confidence that the data in the systems is aligned and accurate.
  2. As ERDS Provider, I want to be able to provide accurate and appropriately labelled data that can be aligned with data from other systems.
Proposed Solution Document
Document title
R0060 Proposed legal text for decision 15.08.24.zip
Archive
Off
Document title
R0060 Proposed legal text 27.06.24
Archive
Off
Document title
R0060 Legal Text ERDS Service Definition v1.0 06.06.2024
Archive
Off
Document title
R0060 Approved legal text 28.08.24
Archive
Off
Problem Statement
The ERDS Service Definition does not specify the time with a specified time zone. This has led to some instances of MPRS close of day running at 22:00GMT instead of 23:00GMT. A confirmation of time zone is required within the ERDS Service Definition to negate any confusion or delays in flow processing and systems becoming misaligned.
SME
SME Role
Lead Assurance Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
R0060 - Change Proposal Form
R0060 Consolidated RFI Responses v1.0 (05.03.2024)
R0060 Change Proposal Plan (Approved) v1.0 18.06.2024
R0060 - Initial Assessment Report v1.0 (Approved) 18.06.2024
R0060 Preliminary Change Report v1.0 (For Consultation) 27.06.2024
R0060 Consolidated Consultation Responses v1.0 (15.08.24)
R0060 Change Report (Final Recommendation - Approved) v2.0
Company Name
St Clements Services
Review status
Review required

Switching Operator Outage Notification Lead time

Date of latest update
Type
Change
ID
R0055
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/11/2022 - The REC Technical Expert Panel voted to approve R0055 for implementation on 24 February 2023.
Summary
Within the Switching Operator Service Definition, the Central Switching Service (CSS) Provider is required to provide 10 Working Days’ (WDs) notice of planned system outages. However, within the CSS Provider’s processes and the Switching Operator Change Management Process Category 3 document, an 8 WD lead time is set out. This change seeks to address this discrepancy.
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment

Completed

Start:

06 Jul 2022

Due:

19 Aug 2022

Completion:

19 Sep 2022

Party Impact Assessment

Completed

Start:

19 Aug 2022

Due:

26 Aug 2022

Completion:

13 Sep 2022

Preliminary Change Report Issued

Completed

Start:

26 Aug 2022

Due:

14 Oct 2022

Completion:

14 Oct 2022

Consultation Issued

Completed

Start:

14 Oct 2022

Due:

14 Oct 2022

Completion:

14 Oct 2022

Final Change Report Issued

Completed

Start:

14 Oct 2022

Due:

18 Nov 2022

Completion:

18 Nov 2022

Responsible Committee Decision

Not Started

Start:

18 Nov 2022

Due:

30 Nov 2022

Completion:

Status
Implementation Date
Status Live
EMAR Version 24.02.2023_live
Included changes Affected REC Items
R0130 Updates to the Data Access Matrix
  • Schedule 12 - Data Access
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As the CSS Provider, I want the service levels to be consistently defined across relevant REC Products. This will ensure that I am clear on the lead time I need to provide for planned outages and can meet the defined service level.
  2. As a CSS User, I want to understand how much notice I will get for planned outages of the CSS, so I am able to appropriately plan my activity reliant on this service.
  3. As a Switching Data Service Provider, I want to understand how much notice I will get for planned outages of the CSS. This will ensure I am able to appropriately plan my Operational Switching Service Changes and associated activities.
Proposed Solution Document
Document title
R0055 - Proposed Legal Text
Archive
Off
Problem Statement
Across REC products there is an inconsistency in the defined lead time for the CSS Provider to provide notification of scheduled maintenance and system outages. This may result in uncertainty for Switching Data Service Providers around when they should submit an Operational Switching Service Change. This is to ensure there is sufficient lead time for any change to be included within a planned maintenance release, and for CSS Users planning their operational activity around CSS availability.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0055 - Change Proposal Plan v1.0 (Approved)
R0055 - Initial Assessment Report v1.0 (Approved)
R0055 - Consolidated Consultation Responses
R0055 - Preliminary Change Report (Published for Consultation) v1.0
R0055 - Final Change Report v1.0 (Approved)
Company Name
DCC
Review status
Review required

EES Access for Virtual Lead Parties

Date of latest update
Type
Change
ID
R0054
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/04/2023 - The Data Access Matrix changes went live on 04 November 2022, the technical changes to EES were implemented alongside R0022 on 03 April 2023.
Summary
This Change Proposal seeks to allow Virtual Lead Parties (VLP) access to the Electricity Enquiry Service (EES), to allow them to efficiently register their customers for balancing services under the Balancing and Settlement Code (BSC).
Proposer
Ann Perry
Change Plan

Service Provider Impact Assessment

Completed

Start:

17 Jun 2022

Due:

22 Jul 2022

Completion:

22 Aug 2022

Preliminary Change Report Issued

Completed

Start:

22 Jul 2022

Due:

02 Sep 2022

Completion:

02 Sep 2022

Consultation Issued

Completed

Start:

02 Sep 2022

Due:

02 Sep 2022

Completion:

02 Sep 2022

Consultation Complete

Completed

Start:

02 Sep 2022

Due:

16 Sep 2022

Completion:

16 Sep 2022

Final Change Report Issued

Completed

Start:

16 Sep 2022

Due:

14 Oct 2022

Completion:

14 Oct 2022

Responsible Committee Decision

Completed

Start:

14 Oct 2022

Due:

26 Oct 2022

Completion:

26 Oct 2022
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 01.04.2023_live
Included changes Affected REC Items
R0100 Update to Error Handling Documents
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want my VLP to have access to the data needed to correctly register me in a timely manner, so there aren’t delays in the delivery of my service.
  2. As a VLP, I want to have access to all the data I need to register my customers so I can deliver the service they have requested, without delay.
  3. As a VLP, I want to be able to use the EES to find the MPAN of a customer using their address information, to enable me to reliably gather this data to without delay or further engagement with my customer.
Proposed Solution Document
Document title
R0054 - Draft DAM Change
Archive
Off
Document title
R0054 - Draft Legal Text
Archive
Off
Problem Statement
VLPs are required to provide their customer’s MPAN as part of the registration process, as per the Balancing and Settlement Code (BSC). VLPs do not currently have access to the EES to enable an MPAN search and they have no reliable means to acquire the MPAN, other than asking their customer to provide it. This could potentially lead to delays in the registration process and may result in an increased risk of inaccurate data, detrimentally impacting the service VLPs are able to provide to their customers.
R0054 - Initial Assessment Report v1.0 (Approved)
R0054 - Change Proposal Plan v1.0 (Approved)
R0054 - Preliminary Change Report v1.0 (Published for Consultation)
R0054 - Non-Confidential Consultation Responses
R0054 - Final Change Report v2.0
Company Name
-
Review status
Review required

GES Service Definition Document

Date of latest update
Type
Change
ID
R0052
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/11/2022 - The REC Technical Expert Panel voted to APPROVE R0052 for implementation on 24 February 2023.
Summary
The frequency of certain reports detailed in the Gas Enquiry Service (GES) Definition document are not consistent with the frequencies set out during the development of REC v3.0 and consulted on with industry stakeholders. This change seeks to align the reporting defined within the Service Definition with the originally intended timetable.
Proposer
Cristina Bermudez Alvarez
Change Plan

Party Impact Assessment

Completed

Start:

13 Jun 2022

Due:

09 Sep 2022

Completion:

23 Sep 2022

Preliminary Change Report Issued

Completed

Start:

09 Sep 2022

Due:

21 Oct 2022

Completion:

21 Oct 2022

Consultation Issued

Completed

Start:

21 Oct 2022

Due:

21 Oct 2022

Completion:

21 Oct 2022

Final Change Report Issued

In Progress

Start:

21 Oct 2022

Due:

18 Nov 2022

Completion:

Responsible Committee Decision

Not Started

Start:

18 Nov 2022

Due:

30 Nov 2022

Completion:

Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 24.02.2023_live
Included changes Affected REC Items
R0130 Updates to the Data Access Matrix
  • Schedule 12 - Data Access
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Meter Asset Provider (MAP), I want it to be clear how and when I will receive reports relating to my portfolio, to ensure that I have the data required to operate efficiently.
  2. As a Meter Equipment Manager (MEM), I want it to be clear how and when I will receive reports relating to my portfolio, to ensure that I have the data required to operate efficiently.
  3. As the GES Service Provider, I want to have clearly and correctly defined requirements and responsibilities, to enable me to efficiently carry out my function as a REC Service Provider.
Proposed Solution Document
Document title
R0052 - Redlined Gas Enquiry Service Definition Document
Archive
Off
Document title
R0052 - EMAR Change Sets
Archive
Off
Problem Statement
The Frequency of reports set out in the Gas Enquiry Service Definition document does not currently reflect the expected frequency for the ‘Supplier Registration report (MEM)’, ‘Portfolio Data (MEM)’ and ‘Portfolio Data (MAP)’ reports. The Gas Enquiry Service Definition needs to be amended to ensure that Meter Equipment Managers (MEMs) and Meter Asset Providers (MAPs) receive reports in the correct timeframe.
R0052 - Proposed legal text submitted with CP
R0052 - Change Proposal Form v1.0
R0052 - Change Proposal Plan v1.0 (Approved)
R0052 - Initial Assessment Report v1.1 (Approved)
R0052 - Preliminary Change Report v1.0 (Published for Consultation)
R0052 - Consolidated Consultation Responses v1.0
R0052 - Final Change Report v1.0 (Approved)
Company Name
-
Review status
Review required

DCC Service Organisation Control 2 (SOC2) Assessments

Date of latest update
Type
Change
ID
R0048
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/06/2024 - The Technical Expert Panel have rejected R0048 in line with the Code Manager's recommendation.
Summary
Currently within the Central Switching Service (CSS) Service Definition document there is a requirement for the CSS Provider to arrange for and undertake system organisation control type 2 (SOC2) assessments on the CSS’s cloud-based infrastructure. This Change Proposal seeks to determine if it is appropriate for the requirement for assurance on the CSS’s cloud-based infrastructure to be changed from ‘SOC2 Type 2’ to ‘independently assessed’.
Proposer
Cordelia Grey
Change Plan

Service Provider Impact Assessment

Completed

Start:

20 May 2022

Due:

16 Jan 2023

Completion:

08 Feb 2023

Solution Development

In Progress

Start:

16 Jan 2023

Due:

24 Nov 2023

Completion:

Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As the Code Manager, I want REC Service Providers to obtain and maintain appropriate security certification, so I have confidence that the Service Providers security, processing integrity, confidentiality and privacy controls are assessed, and any risks are identified and addressed.
  2. As the CSS Provider, I want to be able to obtain an appropriate security certification, so I can demonstrate security compliance in a proportionate and cost-effective approach.
Proposed Solution Document
Document title
Central Switching Service (CSS) Definition - R0048 Redlined
Archive
Off
Problem Statement
The CSS Provider asserts that SOC2 assessment does not provide a proportionate level of assurance or the best value for money, which based on their experience, they believe they have a better understanding of the CSS’s risk profile. However, the use of SOC2 assessments is currently defined within the CSS Definition document, which means an alternative assurance regime cannot be used.
Stages Selection
R0048 - Change Proposal Form
R0048 - Change Proposal Plan v5.0 (Approved) 11.07.2023
R0048 - Initial Assessment Report v1.0 (Approved)
R0048 Preliminary Change Report v1.0 (Approved)
R0048 Consolidated Consultation Responses v1.0
R0048 Final Change Report Post Vote v1.0
Company Name
DCC
Review status
Review required

Changes to SDEP Messages and Schedule numbering for REC V3.0

Date of latest update
Type
Change
ID
R0045
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Jon Hawkins
Change Plan

Preliminary Change Report issued

Completed

Start:

05 May 2022

Due:

27 May 2022

Completion:

27 May 2022

Consultation Issued

Completed

Start:

27 May 2022

Due:

27 May 2022

Completion:

27 May 2022

Consultation closure

Completed

Start:

27 May 2022

Due:

14 Jun 2022

Completion:

14 Jun 2022

Final Change Report issued

Completed

Start:

14 Jun 2022

Due:

22 Jun 2022

Completion:

22 Jun 2022

Responsible Committee Decision

Completed

Start:

22 Jun 2022

Due:

29 Jun 2022

Completion:

29 Jun 2022
Status
Implementation Date
Status Live
EMAR Version 18.07.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Energy Supplier to resolve any Switching or billing issues in a timely manner without unnecessary delays, so that I can receive accurate and timely bills from my chosen Energy Supplier.
  2. As an SDEP User, I want to understand any changes to SDEP messages I need to send and receive that may impact my business, so I can engage in the process and plan any required changes to my processes.
Proposed Solution Document
Document title
R0045 - Draft Legal Text
Archive
Off
Problem Statement
The Secure Data Exchange Portal (SDEP) will be updated at CSS Go-Live Date to reflect the new processes being introduced as part of REC V3.0. The SDEP messages and Data Items in the Energy Market Architecture Repository (EMAR) do not currently reflect these new processes. SDEP users require the Data Specification to accurately reflect the messages and Data Items to enable them to meet their obligations.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
Changes to SDEP Messages.docx
R0045 - CP Form (Downloadable version)
R0045 - Change Proposal Plan v2.0 (Approved)
R0045 - Initial Assessment Report v2.0 (Approved)
R0045 - Preliminary Change Report v1.0
R0045 - Consolidated Consultation Responses v1.0
R0045 - Final Change Report v2.0
Company Name
-
Review status
Review required

EAC information in the EES API

Date of latest update
Type
Change
ID
R0024
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Andrew Long
Change Plan

Solution Development and Party Engagement

Completed

Start:

29 Aug 2022

Due:

07 Sep 2022

Completion:

29 Aug 2022

Change Proposal Withdrawal

Completed

Start:

20 Dec 2021

Due:

29 Aug 2022

Completion:

29 Aug 2022
Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a domestic Electricity Consumer, I want to be quoted accurately for my electricity usage based on my electricity consumption, so that I can make an informed decision to accept/reject the quotation offered.
  2. As an Electricity Supplier, I want to have access to the most recent Metering Point consumption data to be able to provide accurate prices/quotations to a consumer based on their Electricity usage.
  3. As a Third-Party Intermediary (TPI), I want to have access to the most recent Metering Point consumption data to be able to provide accurate prices/quotations to a consumer based on their Electricity usage.
Problem Statement
Where an Electricity Supplier provides a quotation, or Third-Party Intermediary (TPI) completes a comparison, for an Electricity Consumer they must rely on the information provided by the Consumer about their electricity usage. In some cases, consumers may not have access to or knowledge of their annual electricity usage. Consequently, this would be estimated leading to potential inaccurate quotations being provided. Having access to the Metering Point level Estimated Annual Consumption (EAC) via the Electricity Enquiry Service (EES) would enable the provision of more accurate electricity quotations, enabling the Consumer to make an informed choice about their Electricity Supplier, tariff and product.
Stages Selection
SME
SME Role
Lead Technical Analyst
R0024 - Change Proposal Plan v2.0 (Approved)
R0024 - Initial Assessment Report v1.0 (Approved)
Company Name
-
Review status
Review required

Electricity Enquiry Service API Service Status

Date of latest update
Type
Change
ID
R0013
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
admin
Change Plan

Initial Assessment Report published

Completed

Start:

11 Oct 2021

Due:

05 Nov 2021

Completion:

05 Nov 2021

Analysis and Solution development activity

In Progress

Start:

05 Nov 2021

Due:

13 Jan 2022

Completion:

Service Provider Impact Assessment completion

Not Started

Start:

13 Jan 2022

Due:

15 Feb 2022

Completion:

REC Party Impact Assessment completion

Not Started

Start:

15 Feb 2022

Due:

23 Mar 2022

Completion:

Preliminary Change Report issued

Not Started

Start:

23 Mar 2022

Due:

20 Apr 2022

Completion:

Technical Expert Panel review

Not Started

Start:

20 Apr 2022

Due:

27 Apr 2022

Completion:

Consultation starts

Not Started

Start:

27 Apr 2022

Due:

05 May 2022

Completion:

Consultation ends

Not Started

Start:

05 May 2022

Due:

26 May 2022

Completion:

Final Change Report issued

Not Started

Start:

26 May 2022

Due:

21 Jun 2022

Completion:

Technical Expert Panel decision

Not Started

Start:

21 Jun 2022

Due:

29 Jun 2022

Completion:

Impacted Consumers
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an EES User (organisation), I want a method of integrating the service status of the EES API with my systems, so that in the event of EES API outage or disruption I do not trigger unnecessary internal diagnostic activity of my IT systems and processes, and I can initiate appropriate mitigation activity to reduce impacts to my systems and/or the services I provide.
Problem Statement
EES Users do not have a method of integrating the service status of the EES API with their systems. EES Users could experience disruption in their systems/services, caused by EES API disruption or outage. EES Users are not able to automatically identify the root cause of API outages/disruption and may initiate unnecessary internal diagnostic activity after seeing disruption in their systems/services
Stages Selection
SME
SME Role
Lead Technical Analyst
R0013 - Initial Assessment Report v1.0 (Approved)
R0013 - Change Proposal Plan v1.0 (Approved)
Company Name
Switchcraft
Review status
Review required

Reporting of Additional EMR Backing Data to Suppliers

Date of latest update
Type
Change
ID
R0011
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
The aim of this proposal is to reduce the extra assistance required by Electricity Market Reform (EMR) parties in the invoice validation by updating the backing data within the Market Messages to align to what is being invoiced. The associated Market Messages should be structured and named in line with the actual output of Settlement systems to facilitate validation of Capacity Market (CM) Scheme and the Contracts for Difference (CfD) financial settlement.
Proposer
Gemma Dixon
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

12 Nov 2021

Completion:

12 Nov 2021

Technical Expert Panel review

Completed

Start:

12 Nov 2021

Due:

24 Nov 2021

Completion:

24 Nov 2021

Consultation starts

Completed

Start:

24 Nov 2021

Due:

30 Nov 2021

Completion:

29 Nov 2021

Consultation ends

Completed

Start:

30 Nov 2021

Due:

21 Dec 2021

Completion:

21 Jan 2022

Final Change Report issued

Completed

Start:

21 Dec 2021

Due:

14 Jan 2022

Completion:

14 Jan 2022

Technical Expert Panel decision

Completed

Start:

14 Jan 2022

Due:

26 Jan 2022

Completion:

26 Jan 2022
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Market Participant, I need to be able to validate EMRS invoices and credits without having to request additional supporting data.
  2. As EMR Settlement Ltd, I need to have an efficient mechanism in place that enables me to provide Market Participants with all the relevant data that they need to validate their invoices and credit notes, to reduce/remove the need for Market Participants to contact the service desk for additional information.
Proposed Solution Document
Document title
R0011 Tracked Changes 08.03.2023
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
There is no method for Suppliers and Generators to validate their invoices based on the data currently provided within the relevant Market Messages. Parties are able to request all relevant data from EMRS; however, this is time consuming for Parties, EMRS and LCCC/ESC
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0011 - Change Proposal Plan v1.0 (Approved)
R0011 – Initial Assessment Report v1.0 (Approved)
MRA SPF 107 - IA Response Summary
R0011 - Preliminary Change Report v2.0 (Approved)
R0011 - Final Change Report v2.0
Company Name
-
Review status
Review required

New Meter Types for Auxiliary Proportional Controllers (APCs)

Date of latest update
Type
Change
ID
R0010
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This change seeks to introduce a method for industry parties to identify new SMETS2 variant meter types with Auxiliary Proportional Controllers (APCs).
Proposer
David Morton
Change Plan

Change Panel review

Completed

Start:

08 Sep 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Analysis and Solution development activity

Completed

Start:

19 Oct 2021

Due:

30 Dec 2021

Completion:

30 Dec 2021

Alternative Change Proposal decision point

Completed

Start:

30 Dec 2021

Due:

31 Dec 2021

Completion:

31 Dec 2021

Service Provider Impact Assessment completion

Completed

Start:

31 Dec 2021

Due:

21 Apr 2022

Completion:

21 Apr 2022

REC Party Impact Assessment completion

Completed

Start:

21 Apr 2022

Due:

23 May 2022

Completion:

28 Mar 2022

Preliminary Change Report issued

Completed

Start:

23 May 2022

Due:

27 Jun 2022

Completion:

27 Jun 2022

Technical Expert Panel review

Completed

Start:

27 Jun 2022

Due:

05 Jul 2022

Completion:

30 Jun 2022

Consultation starts

Completed

Start:

05 Jul 2022

Due:

12 Jul 2022

Completion:

01 Jul 2022

Consultation ends

Completed

Start:

12 Jul 2022

Due:

26 Jul 2022

Completion:

22 Jul 2022

Final Change Report issued

Completed

Start:

26 Jul 2022

Due:

22 Aug 2022

Completion:

19 Aug 2022

Technical Expert Panel decision

Completed

Start:

22 Aug 2022

Due:

31 Aug 2022

Completion:

31 Aug 2022
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want to be quoted the correct rates as part of my contract conversation when switching supplier. I want my meter set-up correctly to be able to utilise secondary electricity loads at specific times for specific purposes. (e.g., overnight Electric Vehicle (EV) charging, Heat/Hot Water, Boost, etc.). I want to be assured that I will have access to electricity when I need it. I want to switch to my chosen Supplier without any delays or issues.
  2. As an Energy Supplier, I need to identify meter types with Auxiliary Proportional Controllers (APCs) at a property, so that I can offer my customer the correct tariff and configure their meter correctly.
  3. As a Meter Equipment Manager (MEM), I need to identify meter types that incorporate Auxiliary Proportional Controllers (APCs) are present at a property, so that any necessary maintenance/repair work can be carried out appropriately.
Proposed Solution Document
Document title
R0010 - Final approved legal text
Archive
Off
Document title
R0010 - Draft Legal Text v1.0
Archive
Off
Document title
R0010 - Appendix 1 - Solution Analysis v1.0
Archive
Off
Problem Statement
Currently there is no way to identify new meter types that incorporate Auxiliary Proportional Controllers (APCs) outside of the DCC Smart Metering Inventory. Failure to correctly identify these could result in an incorrect meter type being assigned to a supply point. Failure to accurately record where meter types that incorporate Auxiliary Proportional Controllers (APCs) are at a property could result in the meter not being configured correctly by the Supplier. This may impact switching, timely and accurately billing, and industry settlements. Options need to be considered to accurately record what meter types that incorporate Auxiliary Proportional Controllers (APCs) are installed at a property.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
DTC CP 3580 - New Meter Types for Auxiliary Proportional Controllers.pdf
R0010 - Change Proposal Plan v1.0 (Approved)
R0010 – Initial Assessment Report v1.0 (Approved)
R0010 - Consolidated Impact Assessment Responses v1.0
R0010 - Preliminary Change Report v1.0 (Approved)
R0010 - Consolidated Consultation Responses v1.0
R0010 - Final Change Report v2.0 (Post-Vote - Approved)
Company Name
-
Review status
Review required