Sharing of SSC and TPR Information for MHHS Smart and Advanced Meters
Date of latest update
Type
Issue
ID
I0273
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
23/06/2026 - The Code Manager has published an Interim Guidance Document for I0273.
Summary
In the MHHS design the Standard Settlement Configuration (SSC) is a non-mandatory data item for Smart and Advanced metering points, in addition the register level TPR information is not shared in the MTD flows for these meters (IF-006 for Smart and D0268 for Advanced). It was identified through BSC Issue I118 that there is a requirement for the SSC to be set for Domestic / Microbusiness Advanced Metering Points making use of the HH data opt out and there may be other areas where the SSC is required.
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0273 - Interim Guidance Document V1.1
Archive
Off
Problem Statement
The MHHS design does not mandate the use of SSC or support register-level TPR data for Smart and Advanced Meters, creating gaps in data availability for certain Settlement scenarios.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
I0273 Submission Form
I0273 - Update to Plan V2.0 (Pre-Approval) 06.05.2026
Company Name
-
Review status
Review required
Clarification of SIP Qualification Requirements
Date of latest update
Type
Change
ID
R0270
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
REC Schedules 1, 14, and 15 all note that in order to Qualify as a Safe Isolation Provider (SIP), the Party needs to be a Qualified Meter Operator Agent (MOA). It has since been determined that Qualified Electricity Metering Operatives (EMOs) should also be able to Qualify as SIPs.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
27 February 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0270 draft legal text
Archive
Off
Problem Statement
Requiring SIPs to be fully Qualified MOAs may be hindering smaller Parties who wish to be SIPs from Qualifying under the REC. This in turn may be reducing the number of Qualified SIPs in the market for Consumers to choose from or causing Consumers inadvertently to contract with people who are not Qualified SIPs to carry out SIP Works.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0270 Submission Form
I0270 Change Report (Proposal Plan) V1.0 approved 18.11.25
R0270 Change Report (For Consultation) V1.1 approved 10.12.25
R0270 Consolidated Consultation Responses V1.0
R0270 Change Report (Final Recommendation) V1.0 approved 11.02.26
Company Name
-
Review status
Review required
Missing Scenario Variants in D0179 Alternate Solution
Date of latest update
Type
Change
ID
R0235A
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
Within MHHS SIT there is a scenario where the LDSO generates a D0139 to the MS for a PPM but the requirement is for the MS to generate a D0179. There is a gap in the D0179 data required and that provided on the D0139. 21.5.1 & 21.5.6 under Schedule 14 states that where the DNO changes the energisation status, within 3 WD of changing the energisation status the DNO will send the D0139 or the D0179(21.5.6) to the MS and then the MS will generate the D0179 to the Supplier(21.5.6). Currently, the LDSO only generates the D0179 to the Supplier but not to the MOP and the only change under MHHS is to add the new variant MSS.
Original CP
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0235A Schedule 14 - Metering Operations current draft
Archive
Off
Document title
R0235A Schedule 14 - Metering Operations MHHS draft
Archive
Off
Problem Statement
DNOs and MOAs cannot fulfil their full obligations listed in Schedule 14 Metering Operations as there missing Scenario Variants in the Data Specification preventing them from sending the D0179 to all required Parties. This alternate solution proposes the removal of the D0179 from the legal text and the D0139 to be used in all scenarios.
Stages Selection
R0235A Change Proposal form
R0235 and R0235A Change Report (Final Recommendation) V2.0 (Approved) 01.07.2025
Company Name
-
Review status
Review required
Effective Dates in EES
Date of latest update
Type
Issue
ID
I0247
Other Industry Codes impacted
Urgent
No
Latest Update
12/08/2026 - the Proposer has chosen to withdraw this Issue as MHHS means many of the effective dates are being updated as per the original business case so the change is no longer required.
Summary
On a switch many of the effective dates within EES default to the switch date. This includes energisation status. It means EES users that don't have access to the meter technical details do not know the actual date the status changed.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Date of Update to Priority
Solution Development
Stages Selection
Stages Selection
Proposal Form
Company Name
-
Review status
Review required
Transfer of Standard Settlement Configuration and Time Pattern Regime Data Item Ownership
Date of latest update
Type
Change
ID
R0243
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
From MHHS go live (M8), responsibility for maintaining the SSC and TPR valid set will transfer to the REC Code Manager. Without an associated change to ownership of the specific data items, cross governance issues will arise delaying the resolution of future changes to the use of SSC and TPR data in enduring retail processes.
Change Plan
Change Report (Proposal Plan) published
Completed
Start:
12 Feb 2025Due:
29 Jul 2025Completion:
29 Jul 2025Proposal Plan approved
Completed
Start:
29 Jul 2025Due:
05 Aug 2025Completion:
05 Aug 2025Impacted REC Parties and Market Participants
Status
Implementation Date
07 November 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0003 | Market-wide Half-Hourly Settlement Implementation |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0243 - Data Items REDLINED
Archive
Off
Problem Statement
From MHHS Go Live at MHHS Milestone M8 ‘Code changes delivered’, responsibility for maintaining the SSC and TPR valid sets will transfer to the REC Code Manager. Without an associated change to ownership of the specific Data Items, cross governance issues will arise delaying the resolution of future changes to the use of SSC and TPR data in enduring retail processes.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
Change Proposal form
R0243 Change Report (Proposal Plan) v1.0 APPROVED 05.08.2025
R0243 Change Report (Consultation) v1.0 11.08.2025
R0243 Consolidated Consultation Responses PUBLIC v1.0
R0243 Change Report (Final Recommendation) v1.0 approved 24.09.25