REC Change to Align with DCP467 Asset Condition Reporting
Date of latest update
Type
Change
ID
R0306
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
08/07/2026 - the Metering Expert Panel approved the Update to Plan.
Summary
DCUSA change DCP467 has been raised to propose that Category A and B defects reported currently using the Asset Condition Report (D0135) or phone call to the DNO, should instead be reported via an online reporting tool where the DNO has one available. This is expected to have impacts to the REC.
Impacted REC Parties and Market Participants
Status
Implementation Date
06 November 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0306 STIRG Guidance Document draft V0.1
Archive
Off
Document title
I0306 Data Spec changes v0.1
Archive
Off
Document title
R0306 STIRG Guidance Document draft V0.2
Archive
Off
Document title
R0306 Data Spec changes V0.2
Archive
Off
Problem Statement
Where DNOs have enhanced reporting tools for Category A or Category B situations, it is not mandatory for Parties to submit reports using this method. This may lead to a detrimental Consumer experience, as it is limited what information can be provided over the telephone or via Market Message (e.g. it is not possible to provide photographs of the situation).
Stages Selection
I0306 submission form
I0306 Change Report (Proposal Plan) V1.0 approved 03.02.26
I0306 Consolidated Impact Assessment Responses V1.0
R0306 Change Report (For Consultation) V1.1
R0306 Consolidated Consultation Responses v1.1 PUBLIC
R0306 Change Proposal Re-Plan v1.0 approved 08.07.26
Company Name
-
Review status
Review required
Potential Consumer detriment for Smart Economy 7
Date of latest update
Type
Issue
ID
I0303
Urgent
No
Latest Update
09/04/2026 Following a review of responses to the joint information request on REC Issues I0273 - Sharing of SSC and TPR Information for MHHS Smart and Advanced Meters and I0303 - Potential Consumer detriment for Smart Economy 7, the Code Manager has determined that the scope of REC Issue I0303 can be considered as part of the solution development for REC Issue I0273. I0303 has now been classed as resolved and will not be progressed further as a separate Issue. For further engagement with this issue, please refer to I0273 directly.
Summary
There is a potential for Consumer detriment under the Market-wide Half Hourly Settlement arrangements where a customer unknowingly selects a tariff (i.e. single rate) where they have an Economy 7 type configuration on a Smart meter for water/storage heating.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Problem Statement
There is a potential for Consumer detriment under the Market-wide Half Hourly Settlement arrangements where a customer unknowingly selects a tariff (i.e. single rate) where they have an Economy 7 type configuration on a Smart meter for water/storage heating. A solution is required that enables a Supplier to identify a Smart E7 Consumer during the Switch process to ensure they can offer the correct tariff and prevent consumer detriment.
Stages Selection
Stages Selection
I0303 submission form
Company Name
-
Review status
Review required
Amendments to D0312 to align with BSC CP1622
Date of latest update
Type
Change
ID
R0300
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
Elexon have raised CP1622 to amend the Validation rules within the Supplier Meter Registration Service (SMRS) for the Number of Register Digits Data Item within the IF-005 Market Message, to allow digit values from 1–9, ensuring accurate data and reducing exceptions. There are no Validation rules related to the D0312 Market Message which need to be amended under the Balancing and Settlement Code (BSC), but the D0312 itself contains a Data Item Rule regarding the Number of Displayed Register Digits which needs to be amended in line with CP1622.
Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0103 | Central provision of DCC Technical Contacts for requesting test certificates |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Amendments to D0312 red-lined data spec V0.1
Archive
Off
Document title
Amendments to D0312 red-lined data spec V0.2
Archive
Off
Document title
20260205 CP1622 R0300 industry workshop slides
Archive
Off
Problem Statement
BSC CP1622 is looking to address that SMRS cannot accurately update the Number of Displayed Register Digits for a SMETS2 Smart Electricity Meter due to Validation rules currently in place. The Validation rules proposed to be amended are those on the IF-005, which has direct impacts to the D0312.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0300 submission form
R0300 Change Report (Proposal Plan) V1.0
R0300 Consolidated Impact Assessment Responses PUBLIC v1.0
R0300 Update to Plan V1.0 approved 19.03.26
R0300 Change Report (For Consultation) V1.1
R0300 Consolidated Consultation Responses V1.0
R0300 Change Report (Final Recommendation) V1.0 approved 29.04.26
Company Name
-
Review status
Review required
Meter Manufacturers Make and Type not Populated in SMRS
Date of latest update
Type
Issue
ID
I0297
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
An Update to Plan has been approved by the REC Technical Expert Panel on 25 June 2026.
Summary
The Meter Manufacturers Make and Type (J0410 / DI-048) was not populated as part of the MHHS Programme's data cleanse. However it is part of the SMRS maintained Meter Technical Details (MTDs) for Smart Meters which replace the DTC MTD Market Messages for Smart Meters in the MHHS environment. It is not currently possible to populate this item in the legacy arrangements.
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Following MHHS Migration, the MTDs provided by SMRS do not include the Meter Manufacturers Make and Type, as this replaces the existing D0149/D0150 Market Messages it could lead to the information being lost. This will mean Energy Suppliers and MOAs will not know the make and type of meter installed at a particular Site.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0297 submission form
I0297 Change Report (Proposal Plan) V1.0
I0297 Update to plan
I0297 Legal Drafting
Company Name
-
Review status
Review required
Registration Id Required for MHHS Appointments
Date of latest update
Type
Issue
ID
I0296
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
12/05/2026 - The Code Manager have developed a solution which has been live since 05 May 2026. More detail can be found on the REC Portal Wiki. A Closure Report has now been published, and this Issue has now been classed as resolved.
Summary
The RegistrationId (DI90043 / DI849) is required by SMRS to be included in the IF-031 'Supplier Agent Appointment Request' Market Message to allow the SMRA to process the appointment request. However not all Suppliers hold the RegistrationId for all Meter Points, in particular those that have not undergone a Registration managed by the Central Switching Service (CSS)
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As part of the solution for REC Issue I0296 - Registration Id Required for MHHS Appointments the REC Code Manager have developed a process to provide Energy Suppliers the Registration Id for Metering Points that have not been through a Central Switching Service (CSS) Registration Managed Switch. This is to allow Energy Suppliers that may not hold the Registration Id for these Metering Points to populate the Market-wide Half Hourly Settlement (MHHS) Agent Appointment Messages required to initiate a MHHS Migration.
- More detail of the solution can be found: https://recportal.co.uk/rec-wiki-mhhs/-/knowledge_base/market-wide-half-hourly-settlement/provision-of-registration-id-required-for-mhhs-appointments?utm_source=emailoctopus&utm_medium=email&utm_campaign=Weekly%20Bulletin%20-%202026-05-01
Proposed Solution Document
Document title
I0296 Closure Report_v1.0 (12 May 2026)
Archive
Off
Problem Statement
Not all Energy Suppliers hold the RegistrationId for all Meter Points, particularly those Meter Points that have not gone through a Switch, i.e. have not undergone a Registration managed by the CSS. The RegistrationId is currently only available where a Metering Point has been through a CSS managed Registration. Without the RegistrationId available to Energy Suppliers, not all Metering Points will be able to migrate putting the MHHS Migration and Milestone M15 at risk.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0296 submission form
Company Name
-
Review status
Review required
Legacy Data Item API Service
Date of latest update
Type
Change
ID
R0290
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/06/2026 - the REC Change Panel voted to reject the implementation of this Change Proposal, in line with the Code Manager recommendation. The appeal window closed on 17 June 2026.
Summary
MHHS removes certain Data Items (e.g. Profile Class, Measurement Class, Standard Settlement Configuration, Time Pattern Regime etc.) that are important to wider processes and products offered to consumers. This proposal is seeking a mechanism for electricity Market Participants to look up the previous entries for these legacy Data Items held before MHHS Migration begins.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
26 June 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0103 | Central provision of DCC Technical Contacts for requesting test certificates |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0290 New Schedule Legacy Data Item API V0.4
Archive
Off
Document title
R0290 Schedule 1 Defined Terms V0.2
Archive
Off
Document title
R0290 Schedule 9 Qualification and Maintenance v0.1
Archive
Off
Problem Statement
The risk of loss of certain Data Items for MHHS Migrated Metering Points may impact Parties in their ability to carry out and support industry processes, or in what products they are able to offer Consumers, in both the MHHS Market and following a Reverse Migration.
Stages Selection
SME
SME Role
Lead Technical Analyst
I0290 submission form
I0290 Change Report (Proposal Plan) V1.0
I0290 Extension to Plan V1.0 approved 27.03.26
I0290 Extension to Plan V2.0 approved 27.04.26
R0290 Change Report (For Consultation) v1.0
R0290 Consolidated Consultation Responses V1.0
Energy Consultants Association - letter on Change Report (Final Recommendation)
R0290 Change Report (Final Recommendation) v1.1 post vote 02.06.2026
Company Name
-
Review status
Review required
Organisations with multiple role types EES and SDEP access
Date of latest update
Type
Change
ID
I0285
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
01/09/2026 - the Party impact assessment has closed. The Code Manager is reviewing responses and conducting the business case assessment.
Summary
It is currently not possible for organisations with multiple role types to have the same person be able to access all assigned role types within the Secure Data Exchange Portal (SDEP) without having a unique email address for each role type.
Change Plan
Change Report (Proposal Plan) approved by Change Panel
Completed
Start:
Due:
Completion:
04 Nov 2025Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Zip file with I0285 legal text
Archive
Off
Document title
I0285 Solution Development Report V1.0
Archive
Off
Problem Statement
Organisations with more than one role type are required to have unique email addresses for staff who require access to multiple role types, leading to inefficiencies, unnecessary administrative burdens and a poor user experience.
Stages Selection
SME
SME Role
Lead Technical Analyst
I0285 submission form
I0285 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0285 Extension to Plan V1.0 approved 25.02.26
I0285 Extension to Plan V2.0 approved 24.06.26
Company Name
-
Review status
Review required
Updates to Schedule 14 Measurement Transformers Commissioning Timescales
Date of latest update
Type
Change
ID
R0284
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
12/08/2026 - the Metering Expert Panel approved the Change Report (Final Recommendation) V1.2. This Change Proposal will be implemented on 26 June 2027. If you wish to appeal this decision, this must be received by COB 28 August 2026.
Summary
The current timetables in REC Schedule 14 Metering Operations sections 15.6 and 30.6, where an Electricity Metering Asset requires commissioning in accordance with BSC Metering CoP 4 and the Measurement Transformers are owned by the DNO, or in 15.7 and 30.7 where the Measurement Transformers are not owned by the DNO, may no longer be fit for purpose post the implementation of MHHS Milestone M16, where the Settlement timetable reduces the RF run to 4 months.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
25 June 2027
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0284 Schedule 14 Metering Operations draft V0.2
Archive
Off
Document title
R0284 Schedule 14 Metering Operations draft V0.3
Archive
Off
Document title
R0284 Schedule 14 Metering Operations final version
Archive
Off
Problem Statement
The current timetables in REC Schedule 14 Metering Operations sections 15.6 and 30.6, where an Electricity Metering Asset requires commissioning in accordance with BSC Metering CoP 4 and the Measurement Transformers are owned by the DNO, or in 15.7 and 30.7 where the Measurement Transformers are not owned by the DNO, may no longer be fit for purpose post the implementation of MHHS Milestone M16, where the Settlement timetable reduces the RF run to 4 months.
Stages Selection
I0284 submission form
I0284 Change Report (Proposal Plan) V1.0 approved 03.02.26
I0284 Change Issue Group paper v1.0
I0284 Consolidated Impact Assessment Responses PUBLIC v1.0
R0284 Change Report (For Consultation) V1.0 approved 08.04.26
R0284 Consolidated Consultation Responses PUBLIC v1.0
R0284 Change Report (Final Recommendation) V1.2 approved 12.08.26
Company Name
-
Review status
Review required
Establishing the Safe Isolation Provider (SIP) as a Standalone REC Party
Date of latest update
Type
Issue
ID
I0278
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
21/07/2026 - An Update to Plan has been approved by the Change Panel on 21 July 2026.
Summary
This proposal recommends the formal recognition of the Safe Isolation Provider (SIP) as a standalone Party under the Retail Energy Code (REC). This aligns with the direction set out in Ofgem’s recently published Strategic Direction Statement (SDS), which explicitly calls for the establishment of SIPs as a standalone Party role. The aim is to address the growing scale of unregulated SIP activity, mitigate associated consumer safety risks, and ensure the metering industry is equipped to support the UK’s Net Zero ambitions. By enabling easier access to certified SIPs, this change will enhance consumer protection, accelerate low-carbon technology deployment, and improve operational efficiency across the energy sector.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
The current SIP framework poses several risks: - Consumers, MEMs and unaccredited practitioners’ safety. Unaccredited and unregulated isolation work increases the risk of unsafe installations and potential harm to Consumers. NAPIT highlighted to RECCo and DESNZ that 17 and 13 unregulated practitioners respectively died in 2023 and in 2024 due to unsafe isolation. With the right Party undertaking this work, there would also be less safety issues for the Consumer at their premises; - Inequity. Independent Installers face longer wait times compared to supplier-led installations, creating a two-tier system; - Low competitive market. Currently prospective Parties can be put off from applying to be a SIP as it appears they would need full MEM Accreditation which is often too far outside their current business operating model. Providing SIPs with their own pathway and requirements could result in more Parties becoming SIPs and therefore giving Consumers more choice in their provider; and - Decarbonisation delays. The inability to scale SIP capacity undermines the timely deployment of LZCTs, threatening Net Zero targets.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0278 submission form
I0278 Change Report (Proposal Plan) V1.0 (Pre-Approval) 09.10.2025
I0278_Change Report (Extension to Plan) v1.0 (Pre-Approval) 12.01.2026
I0278_Change Report (Extension to Plan) v2.0 (Pre-Approval) 13.07.2026
I0278_Change Report (Extension to Plan) v2.1 (Approved) 21.07.26
I0278_Consolidated Information Request DNO Responses
I0278_Consolidated Information Request MEM-SIP Responses PUBLIC
I0278_Consolidated Information Request RPA Responses
Company Name
-
Review status
Review required
MHHS Related Metering Points across Market Segments
Date of latest update
Type
Issue
ID
I0275
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
06/11/2025 - Following discussions at the Change Issues Group on 06 November, a REC guidance will be developed to support the resolution of this Issue after which it will be classed as resolved.
Summary
It has been identified by the MHHS Data Cleanse Working Group (DCWG) that around 9,000 existing Metering Point Relationships include Metering Points that would migrate into different Market-wide Half Hourly Settlement (MHHS) Market Segments. The majority of these are where one Metering Point has a Traditional meter installed (Smart Segment) and a Related Metering Point has an Advanced meter (Advanced Segment). This situation is currently valid but in MHHS would cause two problems. - SMRS would not be able to align the agent appointments, leaving secondary MPANs without agents and MHHS Migrations unable to fully complete.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Without considering this Issue, there will be a risk to the MHHS migration. Indeed, a Metering Point installed which does not match its Related Metering Point (for example a Relationship between a Traditional meter with an Advanced Meter) will not be able to fully migrate to MHHS arrangements.
Stages Selection
Stages Selection
I0275 submission form
Company Name
-
Review status
Review required