Search GES API using Meter Serial Number

Date of latest update
Type
Change
ID
R0120
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change was implemented on 04 April 2025.
Summary
This change seeks to enable searches of GES API by Meter Serial Number, which is enough information to enable the return of all meter-point data associated with the MPRN.
Proposer
Andrew Dawson
Change Plan

Service Provider Impact Assessment start

Completed

Start:

18 May 2023

Due:

04 Apr 2024

Completion:

04 Apr 2024

Service Provider Impact Assessment close

Completed

Start:

04 Apr 2024

Due:

21 Jun 2024

Completion:

18 Jun 2024

Party Impact Assessment start

Completed

Start:

21 Jun 2024

Due:

28 Jun 2024

Completion:

28 Jun 2024

Party Impact Assessment close

Completed

Start:

28 Jun 2024

Due:

19 Jul 2024

Completion:

19 Jul 2024

Preliminary Change Report and Consultation published

Completed

Start:

19 Jul 2024

Due:

26 Jul 2024

Completion:

26 Jul 2024

Consultation close

Completed

Start:

26 Jul 2024

Due:

16 Aug 2024

Completion:

16 Aug 2024

Final Change Report published

Completed

Start:

16 Aug 2024

Due:

20 Aug 2024

Completion:

20 Aug 2024

Responsible Committee Decision

Completed

Start:

20 Aug 2024

Due:

28 Aug 2024

Completion:

28 Aug 2024
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 28.02.2025_live
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0120 Solution Requirements Matrix v1.0 (21.06.2024)
Archive
Off
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
SME Role
Lead Assurance Analyst
R0120 - Change Proposal form (downloadable version) 18.05.2023
GES Supply Point Switching API Technical Specification- REDLINED
R0120 - Change Proposal Plan V1.0 (16.04.2024) Approved
R0120 - Initial Assessment Report V1.0 (16.04.2024) Approved
R0120 - Consolidated Impact Assessment Responses (26.07.2024)
R0120 - Change Report (published for consultation) 26.07.2024
R0120 - Consolidated Consultation Responses (20.08.2024)
R0120 Change Report (Final Recommendation) approved 28.08.24
Company Name
GB Group plc
Review status
Review required

TPI access to the Meter Asset Manager data via the GES

Date of latest update
Type
Change
ID
R0116
Change Category
Change Path
Priority
Urgent
No
Latest Update
04/06/2024 - Adoption window closed. Withdrawn.
Summary
Empty
Proposer
chris felgate
Impacted Consumers
Impacted REC Services
Status
Implementation Status
Date Raised
Fuel
Date of Update to Priority
Solution Development
Stages Selection
R0116 - Change Proposal Form (Downloadable version) 05.05.2023
Company Name
Ginger Energy Limited
Review status
Review required

A review of Supplier access to data on GES

Date of latest update
Type
Change
ID
R0110
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
When Registered Gas Suppliers and Registered Shippers access the Gas Enquiry Service (GES) they currently have access to their own unique set of Data Items. This Change would give Registered Gas Suppliers access to some additional Data Items which form part of the Registered Gas Shipper Data Items, to enable them to solve Consumer facing switching and billing issues.
Proposer
Lorna Mallon
Change Plan

Service Provider Impact Assessment Due

Completed

Start:

19 Apr 2023

Due:

07 Sep 2023

Completion:

07 Sep 2023

Preliminary Change Report Issued

Completed

Start:

07 Sep 2023

Due:

20 Sep 2023

Completion:

20 Sep 2023

Responsible Committee Review

Completed

Start:

20 Sep 2023

Due:

27 Sep 2023

Completion:

27 Sep 2023

Consultation Issued

Completed

Start:

27 Sep 2023

Due:

27 Sep 2023

Completion:

11 Oct 2023

Final Change Report Issued

Completed

Start:

27 Sep 2023

Due:

18 Oct 2023

Completion:

18 Oct 2023

Responsible Committee Decision

Completed

Start:

18 Oct 2023

Due:

25 Oct 2023

Completion:

25 Oct 2023
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 03.11.2023_live

Documents

Name Version Last updated Actions
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Supplier to be able to access essential information about my energy account, so that billing issues and switching problems can be addressed easily.
  2. As a Registered Gas Supplier, I want to be able to readily access appropriate information relating to my RMP portfolio, so that I can resolve consumer facing billing issues more easily. As the GES Provider, I want my users to be able to access information that helps them fulfil their objectives (in line with REC Data Access principles), so that the service is used as efficiently as possible.
Proposed Solution Document
Document title
R0110 - Draft Legal Text - Gas Data Access Matrix - 20.09.2023
Archive
Off
Problem Statement
When Registered Gas Suppliers need to resolve queries relating to meter reading history, they may need to access information that is currently only available to the Registered Shipper in GES. As a result, Registered Gas Suppliers may be unable to resolve these consumer facing issues on their own, as they do not have direct access to the required Registered Shipper only information.
SME
SME Role
Lead Technical Analyst
R0110 - CP Form (Downloadable Version)
R0110 Initial Assessment Report v1.0 (Approved) - 01.08.2023
R0110 Change Proposal Plan v1.0 (Approved) - 01.08.2023
R0110 Preliminary Change Report v1.0 (Approved) - 27.09.23
R0110 Consolidated Consultation Responses - Non-Confidential v1.0
R0110 Final Change Report v2.0 (Post-Vote) 25.10.23
Company Name
ScottishPower Energy Retail Ltd
Review status
Review required

Review of ONAGE SLAs

Date of latest update
Type
Change
ID
R0105
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/09/24 - Change Report REJECTED by REC Metering Expert Panel
Summary
In light of the changes introduced as part of the Faster Switching Programme, this Change Proposal has been raised to review the SLAs and lead times around the sending and receiving/processing of the ONAGE and associated Market Messages.
Proposer
Natalie Hitchman
Change Plan

Solution Development Closes

Completed

Start:

06 Apr 2023

Due:

31 May 2024

Completion:

31 May 2024

Party Impact Assessment Published

Completed

Start:

31 May 2024

Due:

04 Jul 2024

Completion:

04 Jul 2024

Preliminary Change Report & Consultation Published

Completed

Start:

04 Jul 2024

Due:

08 Aug 2024

Completion:

08 Aug 2024

Final Change Report Published

Not Started

Start:

08 Aug 2024

Due:

04 Sep 2024

Completion:

Responsible Committee Decision

Not Started

Start:

04 Sep 2024

Due:

11 Sep 2024

Completion:

Appeal Window Closure

Not Started

Start:

11 Sep 2024

Due:

25 Sep 2024

Completion:

Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want to have continual Meter Equipment Manager coverage, so that I am confident that work on my Metering Asset can be conducted even during a Switch.
  2. As a MEM, I want my obligations relating to appointment and de-appointment to be considered and practicable, so that my operational processes are not unduly onerous. 2 - As a Gas Supplier, I want to be able to reliably and predictably appoint and de-appoint MEMs during a Switch, so that I am confident that my Consumers are not left without a MEM at any stage. 3 - As the Code Manager, I want REC processes to operate within SLAs that are reflective of both the realistic operational capacities of REC Parties, and also of the needs of the broader market, so that the end Consumer has the best possible Switching experience.
Problem Statement
Current ONAGE SLAs may no longer be proportionate to the length of the Switching process as a result of the Faster Switching programme. Lengthy ONAGE SLAs relative to the timescale of the switching process may result in Consumers being left without a MEM during the switch process. The proposer has asked the Code Manager to conduct a review of the ONAGE SLAs to explore whether these SLAs are still appropriate, and therefore ensure that Consumers are subject to any detriment.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0105 - Change Proposal Form (downloadable version) 06.04.2023
R0105 Change Proposal Plan (Approved) V2.0 31.05.24
R0105 Initial Assessment Report (Approved) V1.0 16.04.24
R0105 Change Proposal Re-Plan (Approved) V1.0 31.05.24
R0105 Consolidated IA Responses V1.0 08.08.24
R0105 Change Report (Published for Consultation) v1.0 08.08.24
R0105 Consolidated Consultation Responses V1.0 02.09.2024
R0105 Change Report (Rejected) V2.0 11.09.24
Company Name
-
Review status
Review required

Clarify obligations on gas meter exchanges that occur close to CoS

Date of latest update
Type
Change
ID
R0094
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This change has been raised to address an issue with the 'Switch with a Concurrent Change of MEM process.'. MEMs are obliged to issue ONJOBs to the CDSP as part of a meter exchange. However, this would not be issued if the MEM has received a de-Appointment flow as part of the Switch. This change proposes to obligate MEMs to issue ONJOBs for any completed meter exchanges, even after receiving a de-Appointment flow. This will ensure accurate Meter Technical Details are available to the gaining Supplier and MEM.
Proposer
David Morley
Change Plan

Solution Development & Analysis

Completed

Start:

17 Feb 2023

Due:

29 Mar 2024

Completion:

27 Mar 2024

Party Impact Assessment Due

Completed

Start:

29 Mar 2024

Due:

19 Apr 2024

Completion:

19 Apr 2024

Preliminary Change Report Issued

Completed

Start:

19 Apr 2024

Due:

26 Apr 2024

Completion:

26 Apr 2024

Responsible Committee Review

Completed

Start:

26 Apr 2024

Due:

08 May 2024

Completion:

08 May 2024

Consultation Closes

Completed

Start:

08 May 2024

Due:

31 May 2024

Completion:

31 May 2024

Final Change Report Issued

Completed

Start:

31 May 2024

Due:

05 Jun 2024

Completion:

05 Jun 2024

Responsible Committee Decision

Completed

Start:

05 Jun 2024

Due:

12 Jun 2024

Completion:

12 Jun 2024

Appeal Window Closure

Not Started

Start:

12 Jun 2024

Due:

26 Jun 2024

Completion:

Status
Implementation Date
Status Live
EMAR Version 08.11.2024_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Supplier to have accurate information about my meter, so that I do not experience billing problems following a Switch.
  2. As a MEM, I want to clearly understand my obligations relating to data transfer during a Switch, so that records of work I carry out are accurately recorded. 2 - As a Registered Supplier, I want metering data on my portfolio of Registrable Measurement Points to be accurate, so that Consumers do not experience billing problems or have a negative switch experience. 3 - As the CDSP, I want Change of Metering Asset data communicated with me to be timely and accurate, so that I am better able to fulfil my role and support REC Parties.
Proposed Solution Document
Document title
R0094 Draft Legal Text
Archive
Off
Document title
R0094 Solution - Draft Legal Text V1.1 05.06.24
Archive
Off
Problem Statement
When Metering Asset work is carried out concurrently with a Switch, details of the work undertaken may not be sent to industry by the MEM, resulting in inaccurate and out of date Metering Asset data being passed to the gaining Registered Gas Supplier.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
R0094 - Change Proposal Form downloadable version 17.02.2023
R0094 Change Proposal Plan v1.0 (Approved) 04-10-2023
R0094 Change Proposal Plan v2.0 (Approved) 01-03-2024
R0094 Initial Assessment Report v1.0 (Approved) 04-10-2023
R0094 Change Proposal Re-Plan (Approved) V1.0 01.03.24
R0094 Consolidated Impact Assessment Responses
R0094 Preliminary Change Report (Approved) V1.0 08.05.24
R0094 Consolidated Consultation Responses V1.0 05.06.24
R0094 Final Change Report (Post-Vote) V1.0 12.06.24
Company Name
-
Review status
Review required

Make Shipper NExA values available on the GES portal

Date of latest update
Type
Change
ID
R0088
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This Change Proposal seeks to deliver the consequential REC changes for Uniform Network Code (UNC) Modification 0701 Aligning Capacity Booking under the UNC and arrangements set out in relevant NExAs. Modification (MOD) 0701 will ensure that the daily capacity allowed by the Network Exit Agreement (NExA) and that permitted by the UNC are aligned.
Proposer
Sharon Dudley
Change Plan

Initial Assessment and Change Proposal Plan issued

Completed

Start:

16 Jan 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Initial Assessment Report and Change Plan approved

Completed

Start:

24 Mar 2023

Due:

04 Apr 2023

Completion:

04 Apr 2023

Service Provider Impact Assessment

Completed

Start:

04 Apr 2023

Due:

25 Apr 2023

Completion:

24 Apr 2023

Party Impact Assessment

Completed

Start:

25 Apr 2023

Due:

31 May 2023

Completion:

31 May 2023

Preliminary Change Report published

Completed

Start:

31 May 2023

Due:

16 Jun 2023

Completion:

16 Jun 2023

Consultation

Completed

Start:

16 Jun 2023

Due:

21 Jul 2023

Completion:

21 Jul 2023

Final Change Report published

Completed

Start:

21 Jul 2023

Due:

18 Aug 2023

Completion:

18 Aug 2023

Responsible Committee decision

Completed

Start:

18 Aug 2023

Due:

30 Aug 2023

Completion:

30 Aug 2023
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 03.11.2023_live

Documents

Name Version Last updated Actions
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, where I have entered a bi-lateral NExA with the relevant Transporter, I want my Shipper and Transporter to have access to all the data they need when capacity referrals to the Gas Transporters are required.
  2. As a Gas Transporter, I want the details of the NExA to be held in GES, to increase visibility of the existence of the NExA and to provide details of the offtake parameters.
  3. As a Gas Shipper, I need to understand both that a NExA exists, and that I have visibility of the offtake parameters relative to the site, so that I can ensure that I take the necessary actions to ensure the Consumer has the appropriate booked Supply Point Capacity.
Proposed Solution Document
Document title
R0088 Gas DAM v3.1 at FCR (18.08.2023)
Archive
Off
Problem Statement
XRN 5186 will make updates to the GES to implement the solution for UNC MOD 701. Following Ofgem’s decision to approve MOD 701, a REC Change Proposal is required to make changes to the REC DAM to enable the delivery of the full cross code solution.
SME
SME Role
Lead Technical Analyst
R0088 - Initial Assessment Report v1.0 (Approved) 04.04.2023
R0088 - Preliminary Change Report (Post-Vote) 28.06.2023
R0088 - Change Proposal Plan v1.0 (Approved) 04.04.2023
R0088 - Final Change Report v2.0 (Approved) 30.08.2023
R0088 - Final Change Report v1.0 (Pre-Vote) 18.08.2023
Company Name
Xoserve
Review status
Review required

MAP GES data access

Date of latest update
Type
Change
ID
R0087
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/01/25 - Change Proposal withdrawn at proposers request.
Summary
As a MAP I want to be able to track my daily position of my portfolio. As a MAP I want to be able to track changes in my portfolio over time. As a MAP I want to understand who are using my assets and identify where assets are not being used
Proposer
David Newman
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
Lead Analyst
holly.law
Date of Update to Priority
Solution Development
Stages Selection
Company Name
Correla
Review status
Review required

Release of Community View Data Items to MEMs in GES

Date of latest update
Type
Change
ID
R0074
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/06/2023 The system changes associated with this change were successfully implemented as planned on Friday 02 June 2023.
Summary
This Change Proposal will enable MEMs to ‘Community View’ access to a limited set of data in the GES, for sites where they are not the appointed MEM.
Proposer
David Addison
Change Plan

Service Provider Impact Assessment

Completed

Start:

05 Oct 2022

Due:

21 Nov 2022

Completion:

16 Dec 2022

Party Impact Assessment

Completed

Start:

21 Nov 2022

Due:

21 Nov 2022

Completion:

18 Dec 2022

Preliminary Change Report Issued

Completed

Start:

21 Nov 2022

Due:

13 Jan 2023

Completion:

13 Jan 2023

Consultation closure

Completed

Start:

13 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Responsible Committee Decision

Completed

Start:

27 Jan 2023

Due:

22 Feb 2023

Completion:

22 Feb 2023
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 24.02.2023_live
Included changes Affected REC Items
R0130 Updates to the Data Access Matrix
  • Schedule 12 - Data Access
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want a Metering Equipment Manager to be able to access and validate my site details, ahead of their arrival on site for planned or emergency metering work, so that I do not experience any delays in work being completed and can have continuity of supply.
  2. As a MEM, I want access to sufficient data for sites where I am not the Appointed MEM, to enable me to complete pre-metering works validations of the site details, so I can undertake these works correctly and safely.
  3. As a MEM, I want access to data for sites where I am not the Appointed MEM, so I can confirm de-appointments and answer invoice validation queries.
Proposed Solution Document
Document title
GES Data Access Matrix for R0074
Archive
Off
Problem Statement
At go-live for REC v3.0 the ‘Community View’ access to data in the GES, previously available via the DES under the UNC, was inadvertently removed. MEMs used this data in a number of processes, including validation of site details prior to metering works – particularly for emergency work, and the resolution of invoice queries from Suppliers. Without access to this Enquiry Service Data, MEMs are unable to complete activities that are central to their operations, including checking site details prior to attending emergency metering works. This has the potential to have a direct negative impact on the experience of metering works for Consumers, and in in some cases, continuity of supply and safety could be at risk.
Change Proposal Form
R0074 - Change Proposal Plan v1.0
R0074 - Initial Assessment Report v1.0 (Approved)
R0074 - Consultation Responses_NON CONFIDENTIAL
R0074 - Preliminary Change Report v1.0 (Published for Consultation)
R0074 - Final Change Report v2.0 (Post-Vote) 22.02.2023
Company Name
Xoserve
Review status
Review required

GES Service Definition Document

Date of latest update
Type
Change
ID
R0052
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/11/2022 - The REC Technical Expert Panel voted to APPROVE R0052 for implementation on 24 February 2023.
Summary
The frequency of certain reports detailed in the Gas Enquiry Service (GES) Definition document are not consistent with the frequencies set out during the development of REC v3.0 and consulted on with industry stakeholders. This change seeks to align the reporting defined within the Service Definition with the originally intended timetable.
Proposer
Cristina Bermudez Alvarez
Change Plan

Party Impact Assessment

Completed

Start:

13 Jun 2022

Due:

09 Sep 2022

Completion:

23 Sep 2022

Preliminary Change Report Issued

Completed

Start:

09 Sep 2022

Due:

21 Oct 2022

Completion:

21 Oct 2022

Consultation Issued

Completed

Start:

21 Oct 2022

Due:

21 Oct 2022

Completion:

21 Oct 2022

Final Change Report Issued

In Progress

Start:

21 Oct 2022

Due:

18 Nov 2022

Completion:

Responsible Committee Decision

Not Started

Start:

18 Nov 2022

Due:

30 Nov 2022

Completion:

Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 24.02.2023_live
Included changes Affected REC Items
R0130 Updates to the Data Access Matrix
  • Schedule 12 - Data Access
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Meter Asset Provider (MAP), I want it to be clear how and when I will receive reports relating to my portfolio, to ensure that I have the data required to operate efficiently.
  2. As a Meter Equipment Manager (MEM), I want it to be clear how and when I will receive reports relating to my portfolio, to ensure that I have the data required to operate efficiently.
  3. As the GES Service Provider, I want to have clearly and correctly defined requirements and responsibilities, to enable me to efficiently carry out my function as a REC Service Provider.
Proposed Solution Document
Document title
R0052 - Redlined Gas Enquiry Service Definition Document
Archive
Off
Document title
R0052 - EMAR Change Sets
Archive
Off
Problem Statement
The Frequency of reports set out in the Gas Enquiry Service Definition document does not currently reflect the expected frequency for the ‘Supplier Registration report (MEM)’, ‘Portfolio Data (MEM)’ and ‘Portfolio Data (MAP)’ reports. The Gas Enquiry Service Definition needs to be amended to ensure that Meter Equipment Managers (MEMs) and Meter Asset Providers (MAPs) receive reports in the correct timeframe.
R0052 - Proposed legal text submitted with CP
R0052 - Change Proposal Form v1.0
R0052 - Change Proposal Plan v1.0 (Approved)
R0052 - Initial Assessment Report v1.1 (Approved)
R0052 - Preliminary Change Report v1.0 (Published for Consultation)
R0052 - Consolidated Consultation Responses v1.0
R0052 - Final Change Report v1.0 (Approved)
Company Name
-
Review status
Review required