Review of Category 3 documents in the REC Baseline Statement

Date of latest update
Type
Change
ID
R0028
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Anton Moden
Change Plan

Preliminary Change Report Issued

Completed

Start:

07 Jan 2022

Due:

04 Feb 2022

Completion:

04 Feb 2022

Consultation Issued

Completed

Start:

04 Feb 2022

Due:

18 Feb 2022

Completion:

18 Feb 2022

Final Change Report Issued

Completed

Start:

18 Feb 2022

Due:

25 Mar 2022

Completion:

25 Mar 2022

Responsible Committee Decision

Completed

Start:

25 Mar 2022

Due:

05 Apr 2022

Completion:

05 Apr 2022
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 14.04.2022_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Market Participant, I need to understand any changes that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  2. As the REC Code Manager, I need to ensure that proposals to amend the REC and its subsidiary documents are subject to appropriate scrutiny and impact assessment, so that impacted stakeholders can appropriately engage with the proposal and understand the impacts to their business.
Proposed Solution Document
Document title
Legal Text
Archive
Off
Document title
Link to Change Set (EMAR)
Archive
Off
Problem Statement
As a rule, changes to Category 3 products should not cause a material impact to parties and stakeholders. It has been identified that there are a number of Category 3 documents where changes to these artefacts could have a material impact to the systems and processes of REC Parties and Service Users. These changes should therefore follow a more robust and thorough assessment to ensure these impacts are identified and the most appropriate solution is considered.
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0028 Change Proposal Plan v1.0 (Approved)
R0028 - Initial Assessment Report v1.0
R0028 - Preliminary Change Report v1.0
R0028 Final Change Report v1.0
Company Name
-
Review status
Review required

Minimum identification requirements in the Meter Operation Code of Practice

Date of latest update
Type
Change
ID
R0027
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
courtney.campbellwood
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an electricity Consumer I want to be able to verify the attending agent’s identity so I can feel safe at my Premises whilst work is completed and trust the Energy industry to care about my safety.
  2. As an electricity Consumer I want to be able to verify the attending agent’s identity so that work can be completed efficiently, without delay or confusion.
  3. As an Electricity Supplier I want my Appointed Metering Equipment Manager to be identifiable when attending Consumer Sites to retain Consumer confidence, trust and for works to be completed without delay.
  4. As a Metering Equipment Manager, I want clarity around the requirements regarding identity cards to be clear so that I can assure compliance and easily identify myself to consumers at site.
  5. As a Metering Scheme Auditor, I want clarity on appropriate identity requirements so I can confidently validate a Metering Equipment Manager’s identity during a site audit.
Problem Statement
Identify card inconsistencies can result in Metering Scheme Auditors and Consumers not being able to reliably verify a Meter Operative’s identity. If Consumers and Metering Scheme Auditors are unable to verify the Competent Person’s identity there could be delays to audits being completed, on-site work being carried out, safety risks or a reduction in consumer trust and confidence.
Stages Selection
R0027 - Change Proposal Plan V1.0 (Approved)
R0027 Initial Assessment Report
Company Name
-
Review status
Review required

Whole current (WC)/Current Transformer (CT) certificates

Date of latest update
Type
Change
ID
R0026
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/01/2024 - Change Proposal has been withdrawn.
Summary
Metering Equipment Managers (MEMs) can currently work on Whole Current (WC) or Current Transformer (CT) meters without having been previously assessed on that metering category. This Change Proposal seeks to develop and implement a solution to address this area of risk.
Proposer
Elise Handy
Change Plan

Solution Analysis and Development Start

Completed

Start:

07 Jan 2022

Due:

31 Oct 2022

Completion:

Impact Assessment Period start

Whole current (WC)/Current Transformer (CT) certificates > Change Plan

Start:

Due:

Completion:

Solution Development completed

Whole current (WC)/Current Transformer (CT) certificates > Change Plan

Start:

Due:

Completion:

Impact Assessment period ends

Whole current (WC)/Current Transformer (CT) certificates > Change Plan

Start:

Due:

Completion:

Impacted Consumers
Impacted REC Documents
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Electricity Consumer I want to be confident that the Meter Operative that completes work on my Metering Equipment is competent to ensure my supply is safe, secure and uninterrupted.
  2. As a MEM, I want to be confident that my processes and Meter Operatives are compliant with the MOCoP, to ensure minimal disruption to my clients and the safety of my employees.
  3. As an Electricity Supplier, I want to be confident that my Appointed agents are compliant with the MOCoP to ensure my consumers safety.
Problem Statement
Current metering accreditation arrangements allow MEMs to work on whole current or Current Transformer (CT) meters regardless of whether they have previously or recently been assessed on that metering category. This poses potential risks for the safety of Consumers and Meter Operatives as the MEMs may not have appropriate processes or training in place to ensure compliance with the MOCoP.
Stages Selection
R0026 - Initial Assessment Report v1.0 (Approved)
R0026 - Change Proposal Plan - V3.0 (Approved)
Company Name
-
Review status
Review required

Prepayment Unallocatable Transactions

Date of latest update
Type
Change
ID
R0023
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Jonathan Holland
Change Plan

Preliminary Change Report Issued

Completed

Start:

15 Dec 2021

Due:

04 Mar 2022

Completion:

04 Mar 2022

Responsible Committee Decision

Completed

Start:

08 Apr 2022

Due:

19 Apr 2022

Completion:

19 Apr 2022

Consultation Period Start

Completed

Start:

19 Apr 2022

Due:

22 Apr 2022

Completion:

22 Apr 2022

Consultation Period End

Completed

Start:

22 Apr 2022

Due:

16 May 2022

Completion:

16 May 2022

Final Change Report Issued

Completed

Start:

16 May 2022

Due:

27 May 2022

Completion:

27 May 2022

Responsible Committee Decision

Completed

Start:

27 May 2022

Due:

07 Jun 2022

Completion:

07 Jun 2022

Appeal Window Closure

Completed

Start:

07 Jun 2022

Due:

22 Jun 2022

Completion:

22 Jun 2022

Legal Review / Preliminary Change Report Revision

Completed

Start:

04 Mar 2022

Due:

15 Mar 2022

Completion:

15 Mar 2022

Revised Preliminary Change Report Issued

Completed

Start:

15 Mar 2022

Due:

08 Apr 2022

Completion:

08 Apr 2022
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 30.06.2022_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a PPMIP, I want to receive accurate market share data to allow me to complete the Unallocatable Prepayment Allocation Run in a timely manner.
  2. As an Energy Supplier, I want the calculation of Unallocatable Transactions to be carried out accurately and efficiently so that I receive payments allocated to my organisation.
Proposed Solution Document
Document title
R0023 Legal Text changes (tracked changes)
Archive
Off
Document title
EMAR Change Set
Archive
Off
Problem Statement
The process for the allocation and payment of Unallocatable Transactions, set out in the Prepayment Arrangements Schedule, does not currently take into account Energy Suppliers that have exited the market or that do not have a contract with the PPMIP. This prevents the PPMIP from being able to release payments to Energy Suppliers, as the process doesn’t allow for all funds to be accounted for in the calculation.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
Change Proposal Plan v1.0 (Approved)
R0023 - Preliminary Change Report v3.0 (Approved)
R0023 - Initial Assessment Report v1.0 (Approved)
R0023 - Final Change Report v1.0
Company Name
-
Review status
Review required

ETTOS Report Dissemination

Date of latest update
Type
Change
ID
R0020
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Aiyesha Andrade
Change Plan

Initial Assessment Report published

Completed

Start:

29 Nov 2021

Due:

03 Dec 2021

Completion:

03 Dec 2021

Change Panel review

Completed

Start:

03 Dec 2021

Due:

07 Dec 2021

Completion:

07 Dec 2021

Preliminary Change Report issued

Completed

Start:

07 Dec 2021

Due:

13 Dec 2021

Completion:

13 Dec 2021

Change Panel review

Completed

Start:

13 Dec 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021

Consultation starts

Completed

Start:

21 Dec 2021

Due:

22 Dec 2021

Completion:

21 Dec 2021

Consultation ends

Completed

Start:

22 Dec 2021

Due:

12 Jan 2022

Completion:

12 Jan 2022

Final Change Report issued

Completed

Start:

12 Jan 2022

Due:

14 Jan 2022

Completion:

14 Jan 2022

Change Panel decision

Completed

Start:

14 Jan 2022

Due:

18 Jan 2022

Completion:

18 Jan 2022
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 31.01.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Energy Supplier to receive and act upon energy theft tip-offs, to ensure the safety and security of my energy supply.
  2. As an ETTOS Recipient, I need to be aware of changes to the way I will receive and send tip-off information, so I can engage in the process and plan any required changes to my processes.
  3. As an ETTOS Recipient, I need to receive my ETTOS Service Data in a timely manner, so that I am able to act on tip-offs, to reduce risks for consumers and my business.
Proposed Solution Document
Document title
R0020 legal text (tracked changes)
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
The ETTOS Service Provider, will be decommissioning their onsite servers on 31 January 2022. Consequently, the ETTOS web portal will no longer be used to provide the ETTOS Service Data (tip-off reports) to ETTOS Recipients. Instead, reports will be sent directly to ETTOS Recipients via encrypted emails. Updates are required to the REC to reflect the changes to the ETTOS report dissemination process.
R0020 - Change Proposal Plan v1.0 (Approved)
R0020 - Initial Assessment Report v1.0 (Approved)
R0020 - Preliminary Change Report v1.0 (Approved)
R0020 - Final Change Report v1.0 (Pre-Vote)
R0020 - Final Change Report v2.0 (Post-Vote)
Company Name
RECCo
Review status
Review required

Consequential REC changes for BSC CP1532

Date of latest update
Type
Change
ID
R0019
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Ann Perry
Change Plan

Initial Assessment Report and Change Proposal Plan approved

Completed

Start:

26 Nov 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021

Preliminary Change Report issued

Completed

Start:

21 Dec 2021

Due:

28 Jan 2022

Completion:

28 Jan 2022

Preliminary Change Report approval

Completed

Start:

28 Jan 2022

Due:

09 Feb 2022

Completion:

09 Feb 2022

Consultation starts

Completed

Start:

09 Feb 2022

Due:

14 Feb 2022

Completion:

11 Feb 2022

Consultation ends

Completed

Start:

14 Feb 2022

Due:

04 Mar 2022

Completion:

04 Mar 2022

Final Change Report Issued

Completed

Start:

04 Mar 2022

Due:

11 Mar 2022

Completion:

11 Mar 2022

Responsible Committee decision (ex-Committee)

Completed

Start:

11 Mar 2022

Due:

23 Mar 2022

Completion:

22 Mar 2022
Status
Implementation Date
Status Live
EMAR Version 30.06.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an electricity Consumer I want my new Energy Supplier to set up my account and appoint their agents appropriately, so I receive timely and accurate bills.
  2. As a Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  3. As an Energy Supplier, I want to be able to Appoint and De-appoint Agents more quickly, to minimise risks to my settlement performance and ability to produce accurate and timely consumer bills when the new switching arrangements go-live.
Proposed Solution Document
Document title
Legal text (tracked changes)
Archive
Off
Document title
Change Set
Archive
Off
Problem Statement
BSC CP1532 proposed updates to the Change of Supply (CoS) timescales within BSC Procedures BSCP502, BSCP504 and BSCP514, to align the Half-Hourly and Non-Half Hourly Supplier Agent Appointment and de-Appointment timescales and to facilitate the achievement of the Faster Switching programme objectives. BSC CP1532 was approved on 01 September 2021 by the Supplier Volume Allocation Group (SVG). Following the SVG’s decision to approve, BSCP514 moved to the Retail Energy Code (REC) following the implementation of P420 ‘Retail Code Consolidation Significant Code Review’. A REC Change Proposal is therefore required to deliver the full solution.
CP1532 Final CP Report.pdf
R0019 - Change Proposal Plan v1.0 (Approved)
R0019 - Initial Assessment Report v1.0 (Approved)
R0019 - Preliminary Change Report v1.0 (Approved)
R0019 - Final Change Report v2.0 (Post-Vote)
Company Name
-
Review status
Review required

Complex Sites process improvements

Date of latest update
Type
Change
ID
R0018
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Ann Perry
Change Plan

Party Impact Assessment Issued

Completed

Start:

25 Nov 2021

Due:

20 Jan 2022

Completion:

10 Feb 2022

Preliminary Change Report Issued

Completed

Start:

20 Jan 2022

Due:

21 Feb 2022

Completion:

18 Feb 2022

Responsible Committee Decision – Ex-Committee

Completed

Start:

21 Feb 2022

Due:

03 Mar 2022

Completion:

03 Mar 2022

Consultation Started

Completed

Start:

03 Mar 2022

Due:

07 Mar 2022

Completion:

07 Mar 2022

Consultation End

Completed

Start:

07 Mar 2022

Due:

01 Apr 2022

Completion:

01 Apr 2022

Final Change Report Issued

Completed

Start:

01 Apr 2022

Due:

29 Apr 2022

Completion:

29 Apr 2022

Responsible Committee Decision

Completed

Start:

29 Apr 2022

Due:

11 May 2022

Completion:

11 May 2022

Appeal Window Open

Completed

Start:

11 May 2022

Due:

13 May 2022

Completion:

13 May 2022

Appeal Window Closed

Completed

Start:

13 May 2022

Due:

27 May 2022

Completion:

27 May 2022
Status
Implementation Date
Status Live
EMAR Version 04.11.2022_live
Included changes Affected REC Items
R0002 Review of Data Specification Category in REC Baseline Statement

Documents

Name Version Last updated Actions
241.04 KB
Version 1.3 - 29 May 2026 XLSX - 241.04 KB
1.3 29 May 2026
455.42 KB
Version 1.3 - 29 May 2026 XLSX - 455.42 KB
1.3 29 May 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an electricity Consumer, I want my metering data to be accurate, to ensure my account is set up correctly and I receive accurate and timely invoices.
  2. As a Metering Equipment Manager, I want to have clarity on my obligations to provide data - specifically what data I need to send, who the recipients are and when I need to send it to ensure I provide accurate data to other Market Participants. As an Electricity Supplier and as an Electricity Distribution Network Operator (DNO), I want to receive accurate and complete Meter Technical Details (MTD) to enable me to take appropriate action following a change of metering equipment, a switch, a change of HHDC, a new connection a meter configuration or MEM.
  3. As a Half Hourly Data Collector, I want to receive accurate and complete Meter Technical Details to enable me to take appropriate action following a change of metering equipment, change of supplier, change of HHDC, new connections, meter configuration or MEM.
Proposed Solution Document
Document title
R0018 - Draft Legal Text
Archive
Off
Document title
Link to Change Set (EMAR)
Archive
Off
Problem Statement
There is not a consistent understanding around the Complex Site process which can lead to the Complex Site Supplementary Information Form (CSSIF) being populated or interpreted differently by different parties. This may lead to incorrect data being used for consumer billing and Settlement, which can result in BSC Trading Disputes.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
Issue-88-Issue-Report.zip
R0018 - Preliminary Change Report v1.0 (Approved)
R0018 - Final Change Report v1.0
R0018 - Change Proposal Plan v1.0 (Approved)
R0018 - Consolidated Consultation Responses v1.0
R0018 - Consolidated Impact Assessment Responses v0.1
R0018 - Initial Assessment Report v1.0 (Approved)
Company Name
-
Review status
Review required

Resolution of Bilateral Erroneous Transfers

Date of latest update
Type
Change
ID
R0016
Change Category
Change Path
Priority
Urgent
No
Latest Update
16/05/2023 - At the Change Panel meeting on 02 May 2023, the recommendations set out in the SDEP Review Report were approved. This included the initiation of 6 Change Proposal groups, including a group that captures Multilateral Erroneous Switches and the functionality changes required within R0016. As a consequence Change Proposal R0016 - Resolution of Bilateral Erroneous Transfers has been withdrawn. The requirements identified under R0016 will be taken forward under a new SDEP review related Change Proposal.
Summary
This Change Proposal is to introduce a more consistent and efficient mechanism for Suppliers to use when investigating and resolving Bilateral Erroneous Transfers.
Proposer
admin
Change Plan

Solution Analysis

In Progress

Start:

18 Nov 2021

Due:

21 Mar 2023

Completion:

Proposed Approach Presented To Change Panel

Not Started

Start:

21 Mar 2023

Due:

18 Apr 2023

Completion:

Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want issues affecting me or my energy account to be resolved at the earliest opportunity, to minimise impacts to my energy switch or accurate and timely billing.
  2. As a Consumer, I want industry parties to share my personal data securely so that my data is protected.
  3. As an Energy Supplier, I want to be able to resolve Bilateral Erroneous Transfers effectively and efficiently, so that I can bill my Consumers accurately and timely.
  4. As an Energy Supplier, I want to be able to resolve Bilateral Erroneous Transfers effectively and efficiently, so that I supply Consumers with whom I have a valid contract.
Problem Statement
The SDEP currently only supports direct messaging between two SDEP Users and doesn’t allow for communications to be shared with multiple users (three or more). In circumstances where agreement is required between multiple parties, this needs to be managed outside of the SDEP by telephone and email. This has reportedly resulted in inconsistencies between parties and delays in the resolution process.
Stages Selection
R0016 Initial Assessment Report v1.0 (Approved)
R0016 Change Proposal Plan v6.0 (Approved)
Company Name
-
Review status
Review required

Remote communication obligations for electricity Advanced Meters

Date of latest update
Type
Change
ID
R0015
Change Category
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This Proposal seeks to introduce an explicit obligation under the REC regarding the provision of active remote communications for electricity Advanced Meters. This supports an effective transition for the Advanced Meter segment, ahead of the Market-wide Half Hourly Settlement (MHHS) Programme migration deadlines.
Proposer
David Brown
Change Plan

Initial Assessment Report published

Completed

Start:

17 Nov 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021

Analysis and Solution development activity

Completed

Start:

21 Dec 2021

Due:

27 Feb 2022

Completion:

25 Feb 2022

Party Impact Assessment completion

Completed

Start:

27 Feb 2022

Due:

21 Mar 2022

Completion:

21 Mar 2022

Preliminary Change Report issued

Completed

Start:

07 Apr 2022

Due:

27 May 2022

Completion:

27 May 2022

Consultation starts

Completed

Start:

27 May 2022

Due:

10 Jun 2022

Completion:

10 Jun 2022

Consultation ends

Completed

Start:

10 Jun 2022

Due:

01 Jul 2022

Completion:

01 Jul 2022

Final Change Report issued

Completed

Start:

01 Jul 2022

Due:

29 Jul 2022

Completion:

28 Jul 2022

Metering Expert Panel decision

Completed

Start:

29 Jul 2022

Due:

10 Aug 2022

Completion:

10 Aug 2022

Service Provider Impact Assessment issued

Completed

Start:

21 Mar 2022

Due:

07 Apr 2022

Completion:

07 Apr 2022

Send back solution refinement completed

Completed

Start:

10 Aug 2022

Due:

13 Jan 2023

Completion:

13 Jan 2023

Consultation issued

Completed

Start:

13 Jan 2023

Due:

20 Jan 2023

Completion:

20 Jan 2023

Update provided to Change Panel

Completed

Start:

20 Jan 2023

Due:

07 Feb 2023

Completion:

07 Feb 2023

Final Change Report issued

Completed

Start:

07 Feb 2023

Due:

14 Feb 2023

Completion:

14 Feb 2023

Responsible Committee decision

Completed

Start:

14 Feb 2023

Due:

21 Feb 2023

Completion:

21 Feb 2023

Authority Determination requested

Completed

Start:

21 Feb 2023

Due:

28 Feb 2023

Completion:

24 Mar 2023
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an electricity consumer with an Advanced Meter, I want my usage data to be accessed remotely from my meter, to reduce the need for on-site visits and ensure that I receive timely and accurate bills.
  2. As the Market-wide Half Hourly Settlement (MHHS) Programme I want to see an effective, early migration of NHH settled Advanced Meters to HH settled, to reduce the risk of missed migration deadlines and ensuring sufficient time to resolve ‘problem’ sites ahead of the MHHS migration deadline.
  3. As an Energy Supplier I want to obtain usage remotely, reducing the need for on-site metering reading activity, enabling me to settle and bill accurately. As a Metering Equipment Manager (MEM), I need to understand any changes to obligations that may impact my business, so I can engage in the change process and plan any required changes to my systems, processes and organisation.
Proposed Solution Document
Document title
R0015 - Draft Legal Text FCR
Archive
Off
Document title
R0015 Send Back - Draft Legal Text
Archive
Off
Document title
R0015 Send Back - Final Legal Text
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
The Balancing and Settlement Code (BSC) is seeking to mandate the Half-Hourly Settlement of Advanced Meters ahead of the transition to Market-wide Half Hourly Settlement. In order to support this transition, these meters will need to support remote communications to allow half hourly consumption data to be collected. There is currently no explicit requirement for Energy Suppliers and/or Metering Equipment Managers to ensure these meters have working remote communications, which could impact the successful migration of these meters to the new arrangements.
SME
SME Role
Lead Technical Analyst
R0015 - Change Proposal Plan v4.0 (Approved)
R0015 - Initial Assessment Report v2.0 (Approved)
R0015 - Consolidated IA Responses
R0015 - Preliminary Change Report v2.0 (Approved)
R0015 - Consolidated Consultation Responses
R0015 - Ofgem Send Back Final
R0015 - Send Back Preliminary Change Report v3.0
R0015 Send Back Consolidated Responses PUBLIC v1.0
R0015 - Send Back Final Change Report v3.0 (Post-Vote) 21.02.2023
R0015 - Authority Decision 24.03.2023
Company Name
Association of Meter Operators
Review status
Review required

Housekeeping amendments to REC V2

Date of latest update
Type
Change
ID
R0012
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

04 Oct 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

22 Oct 2021

Completion:

22 Oct 2021

Change Panel review

Completed

Start:

22 Oct 2021

Due:

16 Nov 2021

Completion:

16 Nov 2021

Consultation starts

Completed

Start:

16 Nov 2021

Due:

17 Nov 2021

Completion:

17 Nov 2021

Consultation ends

Completed

Start:

17 Nov 2021

Due:

08 Dec 2021

Completion:

08 Dec 2021

Final Change Report issued

Completed

Start:

08 Dec 2021

Due:

10 Dec 2021

Completion:

10 Dec 2021

Change Panel decision

Completed

Start:

10 Dec 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 31.01.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I need Energy Companies to operate consistent processes, to ensure my energy supply is managed efficiently and to retain my trust in the functioning of the energy market.
  2. As a REC Party, I need the REC to provide a consistent baseline, so I can operate in an interoperable way with other Market Participants.
Proposed Solution Document
Document title
Legal Text (Tracked Changes)
Archive
Off
Document title
Link to Change Set (Clean)
Archive
Off
Problem Statement
The implementation of REC V2, as part of the Retail Code Consolidation SCR, was due to consolidate the existing provisions in other codes into the REC on a like-for-like basis. The Code Manager has identified that there were changes made to previous codes that weren’t reflected in the REC V2 drafting that was implemented. This means that the current processes being operated by industry parties are not reflected in the REC. REC Party's and Service Providers rely on the REC to provide a consistent baseline to ensure the industry operate in an effective and interoperable way. There are currently inconsistencies between the drafting of the REC, and the processes operated by REC Party's and Service Providers, which could cause issues in the effective operation and assurance of the retail energy market.
R0012 - Change Proposal Plan v1.0 (Approved)
R0012 - Initial Assessment Report v1.0 (Approved)
R0012 - Preliminary Change Report v1.0
R0012 - Preliminary Change Report v2.0 (Approved)
R0012 - Final Change Report v1.0 (Pre-Vote)
R0012 - Final Change Report v2.0 (Post-Vote)
Company Name
REC Code Manager
Review status
Review required