02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
Change Proposal R0047 - Metering Code of Practice Consolidation Review, has been approved for implementation on 01 April 2023. Since approval of the Change Proposal the Code Manager has identified a number of omissions, clarifications, typographical errors and changes needed to the approved legal text. This CP has been raised to make the changes to the legal text and ensure accurate text is introduced into the REC.
Proposer
Ann Perry
Change Plan

Preliminary Change Report published and issued for Consultation

Completed

Start:

16 Dec 2022

Due:

24 Feb 2023

Completion:

24 Feb 2023

Consultation ends

Completed

Start:

24 Feb 2023

Due:

10 Mar 2023

Completion:

10 Mar 2023

Final Change Report published

Completed

Start:

10 Mar 2023

Due:

21 Mar 2023

Completion:

21 Mar 2023

Responsible Committee decision (Ex-Committee)

Completed

Start:

21 Mar 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Appeal window closure

In Progress

Start:

24 Mar 2023

Due:

07 Apr 2023

Completion:

Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 01.04.2023_live
Included changes Affected REC Items
R0100 Update to Error Handling Documents
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a DNO, MEM, AMI, ASP or MI, I want all Code of Practice obligations to be clear and transparent, to ensure all obligations placed upon my organisation and operatives are understood and can be met in the most efficient way.
  2. As an Energy Supplier, I want to be confident that my Appointed agents are compliant with all relevant CoP obligations to ensure the safety of my Consumers.
  3. As RECCo, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
  4. As the Metering Scheme Auditor, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
Proposed Solution Document
Document title
R0084 Legal text changes - CoMCoP - (For Final Change Report) 21.03.2023
Archive
Off
Document title
R0084 Legal text changes - CoMCoP - (For consultation) 24.02.2023
Archive
Off
Problem Statement
To enable REC Parties to successfully meet the obligations of the CoMCoP, when it is implemented via Change Proposal R0047 on 01 April 2023, the CoMCoP needs to accurately reflect the intention of R0047 and current processes.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0084 - CP Form (Downloadable version)
R0084 - Legal text changes identified pre IAR/CPP - uploaded 12.02.23
R0084 - Change Proposal Plan v1.0 (Approved) 23.02.2023
R0084 - Initial Assessment Report v1.0 (Approved) 23.02.2023
R0084 - Preliminary Change Report v1.0 (Published for Consultation) 24.02.2023
R0084 - Consolidated consultation responses v1.0 21.03.2023
R0084 - Final Change Report v2.0 (Post-Vote) 24.03.2023
Company Name
-
Review status
Review required

Maintenance of Qualification Schedule Change

Date of latest update
Type
Change
ID
R0059
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This change seeks to clarify, strengthen and simplify a number of requirements within REC Schedule 9 – Qualification and Maintenance.
Proposer
Georgina Scott-Picton
Change Plan

Solution Development

Completed

Start:

05 Aug 2022

Due:

01 Mar 2023

Completion:

01 Mar 2023

Impact Assessment Start

Completed

Start:

01 Mar 2023

Due:

10 Mar 2023

Completion:

10 Mar 2023

Impact Assessment End

Completed

Start:

10 Mar 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Preliminary Change Report Issued

Completed

Start:

24 Mar 2023

Due:

14 Apr 2023

Completion:

14 Apr 2023

Responsible Committee Review

Completed

Start:

14 Apr 2023

Due:

25 Apr 2023

Completion:

25 Apr 2023

Consultation Start

Completed

Start:

25 Apr 2023

Due:

28 Apr 2023

Completion:

28 Apr 2023

Consultation End

Completed

Start:

28 Apr 2023

Due:

22 May 2023

Completion:

22 May 2023

Final Change Report Issued

Completed

Start:

22 May 2023

Due:

16 Jun 2023

Completion:

15 Jun 2023

Responsible Committee Decision

Completed

Start:

16 Jun 2023

Due:

27 Jun 2023

Completion:

27 Jun 2023

Appeal Window Closure

Not Started

Start:

27 Jun 2023

Due:

11 Jul 2023

Completion:

Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 03.11.2023_live

Documents

Name Version Last updated Actions
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Supplier, DNO, GT, MEM and REC Service User, I want to understand precisely what obligations apply to me under the Schedule 9 – Qualification and Maintenance, so that I can provide the required information to the Code Manager in a timely manner and be compliant.
  2. As the REC Code Manager, I want REC Parties and REC Service Users to have a clear understanding of the information they need to submit relating to the maintenance of their qualification, so that necessary information can be submitted for review and consideration in the most efficient way.
Proposed Solution Document
Document title
R0059 - Draft legal text for IA v1.0 10.03.2023
Archive
Off
Document title
R0059 - Draft legal text for Consultation v1.0 14.04.2023
Archive
Off
Document title
R0059 - Draft legal text for FCR v1.0 01.06.2023
Archive
Off
Document title
R0059 - Final approved draft legal text v1.0 27.06.2023
Archive
Off
Document title
EMAR Link - R0059 - Draft legal text for FCR v1.0 01.06.2023
Archive
Off
Problem Statement
REC Service Users are required to submit Maintenance of Qualification Annual Statements to the Code Manager, the requirements differ depending on the User category. The lack of clear obligations for REC Service Users surrounding the Maintenance of Qualification reporting, set out in Schedule 9 – Qualification and Maintenance results in missing or partially completed submissions. Considerable time is spent by the Code Manager requesting and following up on individual submissions.
R0059 - Change Proposal Form
R0059 - Change Proposal Plan v1.0 (Approved) 07.02.2023
R0059 - Initial Assessment Report v1.0 (Approved) 07.02.2023
R0059 - Impact Assessment Responses V1.0 14.04.2023
R0059 - Preliminary Change Report v1.0 (approved) 25.04.2023
R0059 - Consolidated Consultation Responses v1.0 23.05.2023
R0059 - Final Change Report v2.0 (post-vote) 27.06.23
Company Name
-
Review status
Review required

Clarification of REC Maintenance of Qualification Schedule

Date of latest update
Type
Change
ID
R0050
Urgent
No
Latest Update
Change withdrawn following agreement to combine with R0059
Summary
_
Proposer
bryan.heap
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
R0050 - Downloadable Change Proposal form
Company Name
-
Review status
Review required

REC V3.0

Date of latest update
Type
Change
ID
R0041
Change Category
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Alasdair MacMillan
Change Plan

Legal text baselined

Completed

Start:

10 Apr 2022

Due:

13 May 2022

Completion:

13 May 2022

Final Change Report Issued

Completed

Start:

13 May 2022

Due:

20 May 2022

Completion:

20 May 2022

Responsible Committee Decision

Completed

Start:

20 May 2022

Due:

07 Jun 2022

Completion:

07 Jun 2022

Authority Determination (Original)

Completed

Start:

07 Jun 2022

Due:

20 Jun 2022

Completion:

17 Jun 2022

Authority Determination (revoked and re-issued)

Completed

Start:

20 Jun 2022

Due:

29 Jun 2022

Completion:

29 Jun 2022
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 18.07.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want to be able to successfully switch my Energy Supplier with minimal delay or hassle, so that I can start to receive the service and tariff from my chosen Energy Supplier at the earliest opportunity.
  2. As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the obligations, processes and provisions for the new switching arrangements, to enable the successful transition to enduring governance and operational arrangements.
  3. As a REC Party, I want to be clear on the obligations I need to meet and the processes I need to follow post CSS go live, to ensure my organisation is ready for the introduction of the new switching arrangements.
  4. As a REC Service Provider, I want to be clear on the obligations, processes and service standards that I need to meet, to ensure my organisation is ready for the introduction of the new switching arrangements.
Proposed Solution Document
Document title
REC V3.0 Baselined documents
Archive
Off
Document title
REC v3.0 Baselined documents (REC Portal)
Archive
Off
Problem Statement
Changes are required to the REC, to ensure the appropriate obligations, processes and provisions are defined within the REC at CSS go-live, enabling successful transition to enduring governance and operational arrangements developed as part of Ofgem’s Switching Programme.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0041 - Change Proposal Form
Letter from the Authority to the REC Code Manager - REC V3.0 Authority Change Proposal
R0041 - Change Proposal Plan v1.0 (Approved)
R0041 - Initial Assessment Report v2.0 (Approved)
R0041 - Final Change Report v3.0 (Post-Vote)
R0041 Authority Decision
Company Name
Ofgem
Review status
Review required

ETTOS Report Dissemination

Date of latest update
Type
Change
ID
R0020
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Aiyesha Andrade
Change Plan

Initial Assessment Report published

Completed

Start:

29 Nov 2021

Due:

03 Dec 2021

Completion:

03 Dec 2021

Change Panel review

Completed

Start:

03 Dec 2021

Due:

07 Dec 2021

Completion:

07 Dec 2021

Preliminary Change Report issued

Completed

Start:

07 Dec 2021

Due:

13 Dec 2021

Completion:

13 Dec 2021

Change Panel review

Completed

Start:

13 Dec 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021

Consultation starts

Completed

Start:

21 Dec 2021

Due:

22 Dec 2021

Completion:

21 Dec 2021

Consultation ends

Completed

Start:

22 Dec 2021

Due:

12 Jan 2022

Completion:

12 Jan 2022

Final Change Report issued

Completed

Start:

12 Jan 2022

Due:

14 Jan 2022

Completion:

14 Jan 2022

Change Panel decision

Completed

Start:

14 Jan 2022

Due:

18 Jan 2022

Completion:

18 Jan 2022
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 31.01.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Energy Supplier to receive and act upon energy theft tip-offs, to ensure the safety and security of my energy supply.
  2. As an ETTOS Recipient, I need to be aware of changes to the way I will receive and send tip-off information, so I can engage in the process and plan any required changes to my processes.
  3. As an ETTOS Recipient, I need to receive my ETTOS Service Data in a timely manner, so that I am able to act on tip-offs, to reduce risks for consumers and my business.
Proposed Solution Document
Document title
R0020 legal text (tracked changes)
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
The ETTOS Service Provider, will be decommissioning their onsite servers on 31 January 2022. Consequently, the ETTOS web portal will no longer be used to provide the ETTOS Service Data (tip-off reports) to ETTOS Recipients. Instead, reports will be sent directly to ETTOS Recipients via encrypted emails. Updates are required to the REC to reflect the changes to the ETTOS report dissemination process.
R0020 - Change Proposal Plan v1.0 (Approved)
R0020 - Initial Assessment Report v1.0 (Approved)
R0020 - Preliminary Change Report v1.0 (Approved)
R0020 - Final Change Report v1.0 (Pre-Vote)
R0020 - Final Change Report v2.0 (Post-Vote)
Company Name
RECCo
Review status
Review required

Housekeeping amendments to REC V2

Date of latest update
Type
Change
ID
R0012
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

04 Oct 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

22 Oct 2021

Completion:

22 Oct 2021

Change Panel review

Completed

Start:

22 Oct 2021

Due:

16 Nov 2021

Completion:

16 Nov 2021

Consultation starts

Completed

Start:

16 Nov 2021

Due:

17 Nov 2021

Completion:

17 Nov 2021

Consultation ends

Completed

Start:

17 Nov 2021

Due:

08 Dec 2021

Completion:

08 Dec 2021

Final Change Report issued

Completed

Start:

08 Dec 2021

Due:

10 Dec 2021

Completion:

10 Dec 2021

Change Panel decision

Completed

Start:

10 Dec 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 31.01.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I need Energy Companies to operate consistent processes, to ensure my energy supply is managed efficiently and to retain my trust in the functioning of the energy market.
  2. As a REC Party, I need the REC to provide a consistent baseline, so I can operate in an interoperable way with other Market Participants.
Proposed Solution Document
Document title
Legal Text (Tracked Changes)
Archive
Off
Document title
Link to Change Set (Clean)
Archive
Off
Problem Statement
The implementation of REC V2, as part of the Retail Code Consolidation SCR, was due to consolidate the existing provisions in other codes into the REC on a like-for-like basis. The Code Manager has identified that there were changes made to previous codes that weren’t reflected in the REC V2 drafting that was implemented. This means that the current processes being operated by industry parties are not reflected in the REC. REC Party's and Service Providers rely on the REC to provide a consistent baseline to ensure the industry operate in an effective and interoperable way. There are currently inconsistencies between the drafting of the REC, and the processes operated by REC Party's and Service Providers, which could cause issues in the effective operation and assurance of the retail energy market.
R0012 - Change Proposal Plan v1.0 (Approved)
R0012 - Initial Assessment Report v1.0 (Approved)
R0012 - Preliminary Change Report v1.0
R0012 - Preliminary Change Report v2.0 (Approved)
R0012 - Final Change Report v1.0 (Pre-Vote)
R0012 - Final Change Report v2.0 (Post-Vote)
Company Name
REC Code Manager
Review status
Review required