Introduction of SLA for Supplier De-Registration on Disconnected Meters

Date of latest update
Type
Change
ID
R0191
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
Issue has been discussed twice at RIG and has been identified via data cleanse activity. Parties identified that there are a number of meters (NG alone have 5k in this state) that are showing as terminated but an active Energy Supplier appointment. Discussion at RIG identified that REC Is potentially lacking detail/obligations/timescales on suppliers/DNOs to report/update/respond to disconnection queries.
Proposer
shelley.rouse
Change Plan

Change Plan approved by Change Panel

Completed

Start:

Due:

Completion:

01 Apr 2025

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

03 Apr 2025

Change Report (For Consultation) approved by Change Panel

Completed

Start:

Due:

Completion:

17 Jun 2025

Approved at Change Panel

Completed

Start:

Due:

Completion:

05 Aug 2025
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Live
EMAR Version 07.11.2025_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0191 draft legal text for IA
Archive
Off
Document title
R0191 draft legal text for consultation - pre MHHS
Archive
Off
Document title
R0191 draft legal text for consultation - post MHHS
Archive
Off
Problem Statement
There is no time scale by which Energy Suppliers need to have submitted the Registration De-Activation Request or for electricity to have raised a query with the Distribution Network Operator (DNO) if they believe the Metering Point should not be Disconnected. This raises difficulties for the REC Performance Assurance team when monitoring and enforcing this obligation.
I0191- De-energisation of disconnected meters
I0191 Change Report (Proposal Plan) V1.1 Approved 01.04.25
I0191 Consolidated Impact Assessment Responses v1.0
R0191 Change Report (For Consultation) V1.1
R0191 Consolidated Consultation Responses V1.0
R0191 Change Report (Final Recommendation) Approved 05.08.25
Company Name
REC Issues Group
Review status
Review required

Related Meter Point RMP status rules

Date of latest update
Type
Change
ID
R0190
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
The drafting in Schedule 28 – Related Metering Points has been updated for Market-wide Half Hourly Settlement (MHHS), allowing related Metering Points to be in a Status of Operational or Created in MPRS, as long as all Related Metering Points are in the same Status. This Change Proposal suggests allowing Secondary Metering Points with a Status of Created to be linked to Primary Metering Points with a Status of Operational, for MHHS migrated Metering Points only.
Proposer
andrew.waghorn
Change report - Final Change Report

Comments deadline
Change Plan

Presented at Change Issues Group

Completed

Start:

Due:

Completion:

07 Aug 2025

Proposal Plan approved by Change Panel

Completed

Start:

Due:

Completion:

19 Aug 2025
Impacted Consumers
Impacted REC Documents
Status
Implementation Date
Status Live
EMAR Version 27.02.2026_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0190 - Draft Schedule 28 changes for IA
Archive
Off
Problem Statement
By not allowing Primary Metering Points with a Status of Operational to be linked to Secondary Metering Points with a Status of Created, where the Metering Points have migrated into the MHHS arrangements, full advantage is not being taken of the MHHS functionality of automatically appointing agents to Secondary Metering Points.
SME
SME Role
Lead Assurance Analyst
SME User
awaghorn@deloitte.co.uk
I0190 - Related Meter Point RMP status rules
I0190 Change Report (Proposal Plan) V1.0
I0190 Consolidated Information Request Responses v1.0
I0190 Consolidated Impact Assessment Responses v1.0
I0190 Extension to Plan V1.0 approved 30.10.25
R0190 Change Report (For Consultation) V1.0 approved 18.11.25
R0190 Consolidated Consultation Responses v1.0
R0190 Change Report (Final Recommendation) V1.0 post vote
Company Name
Code Body/ Administrator
Review status
Review required

Voice of the Consumer

Date of latest update
Type
Issue
ID
I0189
Change Category
Priority
Urgent
No
Latest Update
25/02/2026 - an Issue Closure Report has been published and this Issue moved to resolved.
Summary
There is currently a gap in the understanding of the effectiveness of the retail systems and processes in delivering positive outcomes for Consumers. While Consumer surveys are conducted on certain areas to some aspects of Consumer satisfaction, it may be necessary to expand the evaluation methods used by the Code Manager to gain a more comprehensive understanding.
Proposer
Nathan Chaplow
Change Plan

Working Group 1

Completed

Start:

Due:

Completion:

12 Dec 2024

Working Group 2

Completed

Start:

Due:

Completion:

10 Feb 2025

Working Group 3

Completed

Start:

Due:

Completion:

18 Mar 2025

Working Group 4

Completed

Start:

Due:

Completion:

30 Apr 2025

Extension to Plan approved by Change Panel

Completed

Start:

Due:

Completion:

20 May 2025

Working Group 5

Completed

Start:

Due:

Completion:

12 Jun 2025

Working Group 6

Completed

Start:

Due:

Completion:

28 Jul 2025
Impacted Consumers
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0189 proposed legal text - draft 1
Archive
Off
Problem Statement
RECCo’s mission is to facilitate the efficient and effective running of the retail energy market, including its systems and processes through promoting innovation, competition, and delivering positive Consumer outcomes. However, the Code Manager receives limited feedback directly from Consumers to determine if this mission is being fulfilled.
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
I0189- Voice of the Consumer
I0189 Change Report (Proposal Plan) v1.0 20.11.2024
I0189 Extension to Plan V1.0 Approved 20.05.2025
I0189 Extension to Plan V2.0 Approved 23.09.2025
I0189 Issue Closure Report V1.1
Company Name
Code Administrator
Review status
Review required

Housekeeping Amendments

Date of latest update
Type
Change
ID
R0192
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/08/24 - Change Proposal approved for implementation on 06 September 2024.
Summary
The Code Manager has identified a number of typographical and formatting errors, as well as opportunities to provide clarity, improve consistency and accuracy across the REC Services and products. These changes have been assessed as meeting the criteria to be progressed via a Housekeeping Change Proposal.
Proposer
Holly Law
Change report - Final Change Report
Change Plan

Housekeeping Report Published

Completed

Start:

25 Jul 2024

Due:

26 Jul 2024

Completion:

26 Jul 2024

Responsible Committee Decision

Completed

Start:

26 Jul 2024

Due:

06 Aug 2024

Completion:

Impacted Consumers
Status
Implementation Date
Status Live
EMAR Version 06.09.2024_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
holly.law
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
API GES Supply Point Switching Technical Specification v1.1
Archive
Off
Document title
Housekeeping legal text changes
Archive
Off
Problem Statement
This is a Housekeeping Change Proposal subject to the Housekeeping Change Proposal process, rather than the standard change process. The nature of the change is that it makes non-material changes to the REC Products to correct typographical and consistency errors. It also provides an opportunity to introduce necessary clarifications.
Company Name
-
Review status
Review required

Changes to Terms of reference following acceptance of R0167

Date of latest update
Type
Change
ID
R0188
Change Path
Urgent
No
Latest Update
20/08/2024 - Approved for implementation on 06/09/2024.
Summary
This Housekeeping Change Proposal seeks to update the Terms of Reference of the REC Change Panel and the Performance Assurance Board, following the acceptance of R0167, to reflect Issues.
Proposer
Glenn Sheern
Impacted Consumers
Status
Implementation Date
Status Live
EMAR Version 06.09.2024_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
REC Change Panel - Terms of Reference
Archive
Off
Document title
REC Performance Assurance Board (PAB) - Terms of Reference
Archive
Off
Problem Statement
This Housekeeping Change Proposal seeks to update the Change Panel and Performance Assurance Board, Terms of Reference to reflect that these Committees consider change Issues as well as Change Proposals.
R0188 - Change Proposal Form
R0188 - Housekeeping Change Report (Post Approval)
Company Name
Rec Manager
Review status
Review required

Data Cleanse – Report Guidance

Date of latest update
Type
Change
ID
C3-0090
Urgent
No
Latest Update
-
Summary
Addition of Data Cleanse report categorisation
Proposer
Performance Assurance
Status
Implementation Status
Date Raised
Date of Update to Priority
Company Name
Code Manager (RPA)
Review status
Review required

Data Access Request - Housing Associations

Date of latest update
Type
Change
ID
C3-0088
Urgent
No
Latest Update
-
Summary
Prior to R0118 - Review of Schedule 12 and processes to manage access to data being approved, the Code Manager accepted Change Proposal R0056 - EES/GES Additional Service Request for Housing Associations to be added to the Data Access Matrix from Corella. Corella’s intention was to create an API specifically to provide a range of Data Items to Housing Associations, having worked closely with a Housing Association to create a prototype API which provided benefits to them. The Code Manager has considered the broad list of Gas Data Items originally requested and is proposing to provide access to only a subset of these, to enable the Housing Association to identify where a live gas supply exists at the property to comply with the Gas Safety (Installation and Use) Regulations. Once the API is delivered, the Code Manager expects other Housing Associations to make use of it, as an alternative option to the standard Housing Association Report that exists today however has more limited data.
Proposer
Holly Law
Status
Implementation Status
Date Raised
Date of Update to Priority
Company Name
Code Manager (RPS)
Review status
Review required

C3-0089 - Meter Configuration Tables (New)

Date of latest update
Type
Change
ID
C3-0089
Urgent
No
Latest Update
-
Summary
Following the implementation of MHHS, there is a requirement to host a selection of ISD information acquired from the Market Domain Data Tables (currently hosted by Elexon), centrally within the REC Data Specification. The existing data tables are as follows. MDD Entity ID 27 – Clock Interval (c.11,000 records) MDD Entity ID 29 – Measurement Requirement (c.1500 records) MDD Entity ID 32 – Standard Settlement Configuration (c.1000 records) MDD Entity ID 38 – Time Pattern Regime (c.1200 records) Given the volume of data contained within these tables, the simplest solution is to host and provide this information to REC parties, via Spreadsheet (CSV format) on the existing RTS platform, Digital Navigator/EMAR. We would like to consult parties for their view on presenting the data in this format. There are other formatting options we could consider, including the provision of this information in more than one format. Option 1 – CSV only Option 2 – SQL only Option 3 – SQL and CSV This new Category 3 document will also be added to the REC Baseline Statement.
Proposer
April Harbour
Status
Implementation Status
Date Raised
Date of Update to Priority
Company Name
Code Manager (RTS)
Review status
Review required

Schedule 8 Review and Best Practice Guidance Development

Date of latest update
Type
Issue
ID
I0187
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/06/2026 On 25 June 2026, the REC Change Panel approved this extension to plan.
Summary
Schedule 8 - Unbilled Energy Code of Practice has not been reviewed since its development for REC go-live. This Issue seeks to understand if there are any conflicts in the Schedule with best practice and identify any gaps or duplication. Alongside this, a best practice guidance document will be developed which is relevant, complete and aligned to current processes and obligations.
Proposer
Elise Handy
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Change Plan

Proposal Plan Approved at Change Panel

Completed

Start:

Due:

Completion:

21 Jan 2025
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Date of Update to Priority
Solution Development
Proposed solution summary
  1. A new version of Schedule 8.
  2. Implementation of a new Category 3 guidance document.
Proposed Solution Document
Document title
I0187 - Change Report (Proposal Plan) V1.0 (Pre-Approval) 09.01.2025
Archive
Off
Problem Statement
Schedule 8 - Unbilled Energy Code of Practice has not been reviewed since its development for REC go-live. The Schedule needs to be reviewed to ensure it is up to date, understand if there are any conflicts with best practice and identify any gaps or duplication.
I0187 - Change Proposal Form
I0187 - Change Report (Proposal Plan) V1.0 (Approved) 21.01.2025
I0187 - Change Report (Extension to Plan) Approved 17.06.2025
I0187 - Change Report (Extension to Plan) 02.09.2025
I0187 - Change Report (Extension to Plan) 13.01.2025 (Pre-Approval)
I0187 - Change Report (Extension to Plan) V1.0 Approved 25.06.2026
Company Name
Code Manager
Review status
Review required

Non dual-fuel Gas PSR Consumer

Date of latest update
Type
Issue
ID
I0186
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/08/2025 - Update to Proposal Plan published. This will be presented to the REC Change Panel at their meeting on 02 September 2025.
Summary
Non dual-fuel Consumers who register upon the PSR, will have their PSR data flow across energy industry data flows to mean that all parties are aware of any PSR Needs Codes, allowing us all to provide equal access to our services and support. This will be achieved via the utilisation of existing processes and systems. Initially a pilot will take place for a minimum of 3 months between participating companies before extending this to the whole industry”.
Proposer
Ben Atkinson
Change Report - Initial Assessment and Change Plan Report
Impacted Consumers
Impacted REC Services
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
James Hardy
Date of Update to Priority
Solution Development
Problem Statement
The majority of domestic customers in the UK are what are called in the industry ‘dual-fuel’ - this means that with two types of energy (electricity & gas) a domestic dwelling has a single supplier ie they pay their bill to one organisation. This ‘dual-fuel’ position has supported the industry improvements to Priority Services Register (PSR) data flows by allowing previous divides to be overstepped in terms of data flows between energy types. There is however a problem which this RECC request aims to resolve. That is, where a customer who has both fuel types, also has two suppliers and they want to register upon the PSR. This was always a ‘known’ gap shared with our regulator when the many improvements were implemented across the PSR and considered to be something that would be addressed at a later date. This ‘gap’ means that without the dual-fuel link, currently data flows do not complete across energy types via the supplier data flow triggers.
Change Proposal Form - Non dual-fuel Gas PSR Customer
I0186 - Change Report (Proposal Plan) V1.0 (Approved) 18.02.2025
Company Name
British Gas
Review status
Review required