Invalid Requests for Site Technical Details

Date of latest update
Type
Change
ID
R0017
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This Change Proposal seeks to provide clarity to Distribution Network Operators (DNOs) and Metering Equipment Managers (MEMs) on the process for requesting and sending Site Technical Details as part of Meter Asset Installation, Switch or Change of Agent processes.
Proposer
elaine.carr
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 03.11.2023_live

Documents

Name Version Last updated Actions
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer I want my existing or new meter to be read regularly to ensure I receive accurate bills.
  2. As a Distribution Network Operator I want to receive appropriate Requests for Site Technical Details. As a Distribution Network Operator I want the difference between my obligations and best practice to be clear in relation to provision of Site Technical Details for sites with and without Measurement Transformers.
  3. As a Metering Equipment Manager I want to be provided with Site Technical Details for all relevant sites so I can correctly install, commission and maintain the Metering Equipment.
Proposed Solution Document
Document title
R0017 - Schedule 14 - Metering Operations (Final Approved) v1.0 08.06.2023
Archive
Off
Document title
R0017 - Schedule 14 - Metering Operations (For FCR) v1.0 26.05.2023
Archive
Off
Document title
R0017 - Schedule 14 - Metering Operations (For PCR) - 31.03.2023
Archive
Off
Document title
R0017 Draft Legal Text (for Party IA) 13.01.23
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
Distribution Network Operators (DNOs) have reported that they are receiving a high volume of requests for Site Technical Details for Domestic and Microbusiness sites following a Switch or Change of Agent, resulting in increased workload for DNOs to validate and process these requests. It is not clear if these requests are all necessary or required by the MEMs and justify the effort required by the DNO to process these requests.
SME
SME Role
Lead Technical Analyst
R0017 - Initial Assessment Report v1.0 (Approved)
R0017 - Change Proposal Plan v7.0 (Approved) 09.03.2023
R0017 - Consolidated Impact Assessment Responses v1.0 - 23.02.2023
R0017 - Preliminary Change Report v2.0 (Approved) 14.04.2023
R0017 - NON-CONFIDENTIAL Consolidated consultation responses v1.0 26.05.2023
R0017 - Final Change Report v2.0 (Post-Vote) 08.06.2023
Company Name
SPEN
Review status
Review required

Remote communication obligations for electricity Advanced Meters

Date of latest update
Type
Change
ID
R0015
Change Category
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This Proposal seeks to introduce an explicit obligation under the REC regarding the provision of active remote communications for electricity Advanced Meters. This supports an effective transition for the Advanced Meter segment, ahead of the Market-wide Half Hourly Settlement (MHHS) Programme migration deadlines.
Proposer
David Brown
Change Plan

Initial Assessment Report published

Completed

Start:

17 Nov 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021

Analysis and Solution development activity

Completed

Start:

21 Dec 2021

Due:

27 Feb 2022

Completion:

25 Feb 2022

Party Impact Assessment completion

Completed

Start:

27 Feb 2022

Due:

21 Mar 2022

Completion:

21 Mar 2022

Preliminary Change Report issued

Completed

Start:

07 Apr 2022

Due:

27 May 2022

Completion:

27 May 2022

Consultation starts

Completed

Start:

27 May 2022

Due:

10 Jun 2022

Completion:

10 Jun 2022

Consultation ends

Completed

Start:

10 Jun 2022

Due:

01 Jul 2022

Completion:

01 Jul 2022

Final Change Report issued

Completed

Start:

01 Jul 2022

Due:

29 Jul 2022

Completion:

28 Jul 2022

Metering Expert Panel decision

Completed

Start:

29 Jul 2022

Due:

10 Aug 2022

Completion:

10 Aug 2022

Service Provider Impact Assessment issued

Completed

Start:

21 Mar 2022

Due:

07 Apr 2022

Completion:

07 Apr 2022

Send back solution refinement completed

Completed

Start:

10 Aug 2022

Due:

13 Jan 2023

Completion:

13 Jan 2023

Consultation issued

Completed

Start:

13 Jan 2023

Due:

20 Jan 2023

Completion:

20 Jan 2023

Update provided to Change Panel

Completed

Start:

20 Jan 2023

Due:

07 Feb 2023

Completion:

07 Feb 2023

Final Change Report issued

Completed

Start:

07 Feb 2023

Due:

14 Feb 2023

Completion:

14 Feb 2023

Responsible Committee decision

Completed

Start:

14 Feb 2023

Due:

21 Feb 2023

Completion:

21 Feb 2023

Authority Determination requested

Completed

Start:

21 Feb 2023

Due:

28 Feb 2023

Completion:

24 Mar 2023
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an electricity consumer with an Advanced Meter, I want my usage data to be accessed remotely from my meter, to reduce the need for on-site visits and ensure that I receive timely and accurate bills.
  2. As the Market-wide Half Hourly Settlement (MHHS) Programme I want to see an effective, early migration of NHH settled Advanced Meters to HH settled, to reduce the risk of missed migration deadlines and ensuring sufficient time to resolve ‘problem’ sites ahead of the MHHS migration deadline.
  3. As an Energy Supplier I want to obtain usage remotely, reducing the need for on-site metering reading activity, enabling me to settle and bill accurately. As a Metering Equipment Manager (MEM), I need to understand any changes to obligations that may impact my business, so I can engage in the change process and plan any required changes to my systems, processes and organisation.
Proposed Solution Document
Document title
R0015 - Draft Legal Text FCR
Archive
Off
Document title
R0015 Send Back - Draft Legal Text
Archive
Off
Document title
R0015 Send Back - Final Legal Text
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
The Balancing and Settlement Code (BSC) is seeking to mandate the Half-Hourly Settlement of Advanced Meters ahead of the transition to Market-wide Half Hourly Settlement. In order to support this transition, these meters will need to support remote communications to allow half hourly consumption data to be collected. There is currently no explicit requirement for Energy Suppliers and/or Metering Equipment Managers to ensure these meters have working remote communications, which could impact the successful migration of these meters to the new arrangements.
SME
SME Role
Lead Technical Analyst
R0015 - Change Proposal Plan v4.0 (Approved)
R0015 - Initial Assessment Report v2.0 (Approved)
R0015 - Consolidated IA Responses
R0015 - Preliminary Change Report v2.0 (Approved)
R0015 - Consolidated Consultation Responses
R0015 - Ofgem Send Back Final
R0015 - Send Back Preliminary Change Report v3.0
R0015 Send Back Consolidated Responses PUBLIC v1.0
R0015 - Send Back Final Change Report v3.0 (Post-Vote) 21.02.2023
R0015 - Authority Decision 24.03.2023
Company Name
Association of Meter Operators
Review status
Review required

Cable Colour Identification

Date of latest update
Type
Change
ID
R0014
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
colette.baldwin
Change Plan

Initial Assessment Report published

Completed

Start:

01 Nov 2021

Due:

26 Nov 2021

Completion:

26 Nov 2021

Change Panel review

Completed

Start:

26 Nov 2021

Due:

07 Dec 2021

Completion:

07 Dec 2021

Preliminary Change Report issued

Completed

Start:

07 Dec 2021

Due:

04 Jan 2022

Completion:

31 Dec 2021

Metering Expert Panel review

Completed

Start:

04 Jan 2022

Due:

12 Jan 2022

Completion:

12 Jan 2022

Consultation starts

Completed

Start:

12 Jan 2022

Due:

17 Jan 2022

Completion:

25 Jan 2022

Consultation ends

Completed

Start:

17 Jan 2022

Due:

15 Feb 2022

Completion:

15 Feb 2022

Final Change Report issued

Completed

Start:

15 Feb 2022

Due:

25 Feb 2022

Completion:

25 Feb 2022

Metering Expert Panel decision

Completed

Start:

25 Feb 2022

Due:

09 Mar 2022

Completion:

09 Mar 2022
Status
Implementation Date
Status Live
EMAR Version 30.06.2022_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
colette.baldwin
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an electricity Consumer, I want requested meter work to take place safely and efficiently at the time and date agreed, so that I have a safe and working meter.
  2. As a MEM or a DNO I want clarity on how to deal with cable labelling during periods of coloured cable supply chain shortages, so that I can continue to install or maintain consumer metering.
  3. As a Metering Scheme Auditor, I want there to be clarity on the permitted labelling of non-standard colour coded cables used when connecting meters, so that audits can be appropriately completed.
Proposed Solution Document
Document title
R0014 legal text (tracked changes)
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
During times of sustained supply chain shortages, some colour coded cables may not generally be available. Where this is the case, Metering Equipment Managers (MEMs) and Distribution Network Operators (DNOs) need to be able to source a suitable alternative cable so that they can continue to install and maintain meters. Although the labelling of cables with different out sheath colours from the inner insulation is covered by the IET Wiring Regulations, this is not set out within the REC Electricity MOCoP.
IET Wiring Regulation BS7671 - 2018 - Table 51 Identification of Conductors
R0014 - Change Proposal Plan v1.0 (Approved)
R0014 - Initial Assessment Report v1.0 (Approved)
R0014 - Preliminary Change Report v2.0 (Approved)
R0014 - Final Change Report V2.0 (Post-Vote)
Company Name
-
Review status
Review required

Housekeeping amendments to REC V2

Date of latest update
Type
Change
ID
R0012
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

04 Oct 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

22 Oct 2021

Completion:

22 Oct 2021

Change Panel review

Completed

Start:

22 Oct 2021

Due:

16 Nov 2021

Completion:

16 Nov 2021

Consultation starts

Completed

Start:

16 Nov 2021

Due:

17 Nov 2021

Completion:

17 Nov 2021

Consultation ends

Completed

Start:

17 Nov 2021

Due:

08 Dec 2021

Completion:

08 Dec 2021

Final Change Report issued

Completed

Start:

08 Dec 2021

Due:

10 Dec 2021

Completion:

10 Dec 2021

Change Panel decision

Completed

Start:

10 Dec 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 31.01.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I need Energy Companies to operate consistent processes, to ensure my energy supply is managed efficiently and to retain my trust in the functioning of the energy market.
  2. As a REC Party, I need the REC to provide a consistent baseline, so I can operate in an interoperable way with other Market Participants.
Proposed Solution Document
Document title
Legal Text (Tracked Changes)
Archive
Off
Document title
Link to Change Set (Clean)
Archive
Off
Problem Statement
The implementation of REC V2, as part of the Retail Code Consolidation SCR, was due to consolidate the existing provisions in other codes into the REC on a like-for-like basis. The Code Manager has identified that there were changes made to previous codes that weren’t reflected in the REC V2 drafting that was implemented. This means that the current processes being operated by industry parties are not reflected in the REC. REC Party's and Service Providers rely on the REC to provide a consistent baseline to ensure the industry operate in an effective and interoperable way. There are currently inconsistencies between the drafting of the REC, and the processes operated by REC Party's and Service Providers, which could cause issues in the effective operation and assurance of the retail energy market.
R0012 - Change Proposal Plan v1.0 (Approved)
R0012 - Initial Assessment Report v1.0 (Approved)
R0012 - Preliminary Change Report v1.0
R0012 - Preliminary Change Report v2.0 (Approved)
R0012 - Final Change Report v1.0 (Pre-Vote)
R0012 - Final Change Report v2.0 (Post-Vote)
Company Name
REC Code Manager
Review status
Review required

Reporting of Additional EMR Backing Data to Suppliers

Date of latest update
Type
Change
ID
R0011
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
The aim of this proposal is to reduce the extra assistance required by Electricity Market Reform (EMR) parties in the invoice validation by updating the backing data within the Market Messages to align to what is being invoiced. The associated Market Messages should be structured and named in line with the actual output of Settlement systems to facilitate validation of Capacity Market (CM) Scheme and the Contracts for Difference (CfD) financial settlement.
Proposer
Gemma Dixon
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

12 Nov 2021

Completion:

12 Nov 2021

Technical Expert Panel review

Completed

Start:

12 Nov 2021

Due:

24 Nov 2021

Completion:

24 Nov 2021

Consultation starts

Completed

Start:

24 Nov 2021

Due:

30 Nov 2021

Completion:

29 Nov 2021

Consultation ends

Completed

Start:

30 Nov 2021

Due:

21 Dec 2021

Completion:

21 Jan 2022

Final Change Report issued

Completed

Start:

21 Dec 2021

Due:

14 Jan 2022

Completion:

14 Jan 2022

Technical Expert Panel decision

Completed

Start:

14 Jan 2022

Due:

26 Jan 2022

Completion:

26 Jan 2022
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Market Participant, I need to be able to validate EMRS invoices and credits without having to request additional supporting data.
  2. As EMR Settlement Ltd, I need to have an efficient mechanism in place that enables me to provide Market Participants with all the relevant data that they need to validate their invoices and credit notes, to reduce/remove the need for Market Participants to contact the service desk for additional information.
Proposed Solution Document
Document title
R0011 Tracked Changes 08.03.2023
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
There is no method for Suppliers and Generators to validate their invoices based on the data currently provided within the relevant Market Messages. Parties are able to request all relevant data from EMRS; however, this is time consuming for Parties, EMRS and LCCC/ESC
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0011 - Change Proposal Plan v1.0 (Approved)
R0011 – Initial Assessment Report v1.0 (Approved)
MRA SPF 107 - IA Response Summary
R0011 - Preliminary Change Report v2.0 (Approved)
R0011 - Final Change Report v2.0
Company Name
-
Review status
Review required

New Meter Types for Auxiliary Proportional Controllers (APCs)

Date of latest update
Type
Change
ID
R0010
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This change seeks to introduce a method for industry parties to identify new SMETS2 variant meter types with Auxiliary Proportional Controllers (APCs).
Proposer
David Morton
Change Plan

Change Panel review

Completed

Start:

08 Sep 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Analysis and Solution development activity

Completed

Start:

19 Oct 2021

Due:

30 Dec 2021

Completion:

30 Dec 2021

Alternative Change Proposal decision point

Completed

Start:

30 Dec 2021

Due:

31 Dec 2021

Completion:

31 Dec 2021

Service Provider Impact Assessment completion

Completed

Start:

31 Dec 2021

Due:

21 Apr 2022

Completion:

21 Apr 2022

REC Party Impact Assessment completion

Completed

Start:

21 Apr 2022

Due:

23 May 2022

Completion:

28 Mar 2022

Preliminary Change Report issued

Completed

Start:

23 May 2022

Due:

27 Jun 2022

Completion:

27 Jun 2022

Technical Expert Panel review

Completed

Start:

27 Jun 2022

Due:

05 Jul 2022

Completion:

30 Jun 2022

Consultation starts

Completed

Start:

05 Jul 2022

Due:

12 Jul 2022

Completion:

01 Jul 2022

Consultation ends

Completed

Start:

12 Jul 2022

Due:

26 Jul 2022

Completion:

22 Jul 2022

Final Change Report issued

Completed

Start:

26 Jul 2022

Due:

22 Aug 2022

Completion:

19 Aug 2022

Technical Expert Panel decision

Completed

Start:

22 Aug 2022

Due:

31 Aug 2022

Completion:

31 Aug 2022
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want to be quoted the correct rates as part of my contract conversation when switching supplier. I want my meter set-up correctly to be able to utilise secondary electricity loads at specific times for specific purposes. (e.g., overnight Electric Vehicle (EV) charging, Heat/Hot Water, Boost, etc.). I want to be assured that I will have access to electricity when I need it. I want to switch to my chosen Supplier without any delays or issues.
  2. As an Energy Supplier, I need to identify meter types with Auxiliary Proportional Controllers (APCs) at a property, so that I can offer my customer the correct tariff and configure their meter correctly.
  3. As a Meter Equipment Manager (MEM), I need to identify meter types that incorporate Auxiliary Proportional Controllers (APCs) are present at a property, so that any necessary maintenance/repair work can be carried out appropriately.
Proposed Solution Document
Document title
R0010 - Final approved legal text
Archive
Off
Document title
R0010 - Draft Legal Text v1.0
Archive
Off
Document title
R0010 - Appendix 1 - Solution Analysis v1.0
Archive
Off
Problem Statement
Currently there is no way to identify new meter types that incorporate Auxiliary Proportional Controllers (APCs) outside of the DCC Smart Metering Inventory. Failure to correctly identify these could result in an incorrect meter type being assigned to a supply point. Failure to accurately record where meter types that incorporate Auxiliary Proportional Controllers (APCs) are at a property could result in the meter not being configured correctly by the Supplier. This may impact switching, timely and accurately billing, and industry settlements. Options need to be considered to accurately record what meter types that incorporate Auxiliary Proportional Controllers (APCs) are installed at a property.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
DTC CP 3580 - New Meter Types for Auxiliary Proportional Controllers.pdf
R0010 - Change Proposal Plan v1.0 (Approved)
R0010 – Initial Assessment Report v1.0 (Approved)
R0010 - Consolidated Impact Assessment Responses v1.0
R0010 - Preliminary Change Report v1.0 (Approved)
R0010 - Consolidated Consultation Responses v1.0
R0010 - Final Change Report v2.0 (Post-Vote - Approved)
Company Name
-
Review status
Review required

Consequential New and Amended Market Messages for BSC Modification P375

Date of latest update
Type
Change
ID
R0008
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Gemma Dixon
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

01 Nov 2021

Completion:

29 Oct 2021

Technical Expert Panel review

Completed

Start:

01 Nov 2021

Due:

08 Nov 2021

Completion:

08 Nov 2021

Consultation starts

Completed

Start:

08 Nov 2021

Due:

15 Nov 2021

Completion:

12 Nov 2021

Consultation ends

Completed

Start:

15 Nov 2021

Due:

06 Dec 2021

Completion:

06 Dec 2021

Final Change Report issued

Completed

Start:

06 Dec 2021

Due:

10 Dec 2021

Completion:

10 Dec 2021

Technical Expert Panel decision

Completed

Start:

10 Dec 2021

Due:

22 Dec 2021

Completion:

22 Dec 2021
Status
Implementation Date
Status Live
EMAR Version 30.06.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer I want to be able to access aggregation services so that I can take full advantage of commercial opportunities for my onsite generation or demand reduction.
  2. As Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  3. As an Asset Metering Virtual Lead Party, I need to be recognised as a valid Market Data Service, so that I can appoint BSC Qualified Agents and fulfil relevant metering operations and data collection activities for Asset Metering.
Proposed Solution Document
Document title
Legal Text (Tracked Changes)
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
BSC Modification P375 will be implemented on 30th June 2022 and introduces a new role of Asset Metering Virtual Lead Party (AMVLP), to allow settlement of meters ‘behind the boundary point’. To enable this, the AMVLP will need to exchange Market Messages with other Market Participants that underpin the new process being introduced by the BSC. Some of these Market Messages are governed by the REC and require a consequential REC Change Proposal to deliver the full solution.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
Attachment B- New and amended Market Messages and Data Items for REC.docx
BSC P375 Final Modification Report
R0008 – Initial Assessment Report v1.0 (Approved)
R0008 – Change Proposal Plan v1.0 (Approved)
R0008 - Preliminary Change Report v1.0 (Approved)
R0008 - Final Change Report v2.0 (Post Vote)
Company Name
-
Review status
Review required

Market-wide Half-Hourly Settlement Implementation

Date of latest update
Type
Change
ID
R0003
Change Category
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Abid Sheikh
Change Plan

Initial Assessment Report published

Completed

Start:

01 Sep 2021

Due:

03 Sep 2021

Completion:

03 Sep 2021

Change Panel review

Completed

Start:

03 Sep 2021

Due:

07 Sep 2021

Completion:

07 Sep 2021

Preliminary Change Report published

Completed

Start:

07 Sep 2021

Due:

09 Sep 2021

Completion:

09 Sep 2021

Consultation start

Completed

Start:

09 Sep 2021

Due:

14 Sep 2021

Completion:

14 Sep 2021

Consultation end

Completed

Start:

14 Sep 2021

Due:

20 Sep 2021

Completion:

20 Sep 2021

Final Change Report published

Completed

Start:

20 Sep 2021

Due:

24 Sep 2021

Completion:

24 Sep 2021

Change Panel decision

Completed

Start:

24 Sep 2021

Due:

05 Oct 2021

Completion:

05 Oct 2021
Status
Implementation Date
Status Live
EMAR Version 04.11.2021_live
Included changes Affected REC Items
R0001 Amendment to DCC Service Flag (DI51130) Data Item

Documents

Name Version Last updated Actions
241.04 KB
Version 1.3 - 29 May 2026 XLSX - 241.04 KB
1.3 29 May 2026
455.42 KB
Version 1.3 - 29 May 2026 XLSX - 455.42 KB
1.3 29 May 2026
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As the Senior Responsible Owner for the Market-wide Half-Hourly Settlement programme, I need assurance that all programme participants will deliver the required changes in accordance with programme plan, so Market-wide Half-Hourly settlement can be introduced and implemented successfully.
Proposed Solution Document
Document title
R0003 - Red-lined amendments to Main Body
Archive
Off
Document title
Link to EMAR - Change Set (Clean)
Archive
Off
Problem Statement
The successfully introduction of Market-wide Half-Hourly Settlement (MHHS) requires changes to made to the systems and processes governed by other codes outside of the BSC, including the REC. Elexon as the Senior Responsible Owner (SRO) and Ofgem as the Programme Sponsor for the MHHS programme need assurance that all programme participants will support the implementation of the programme and deliver against the approved timetable. While there is a general ‘duty to cooperate’ with Significant Code Reviews that exists for licenced parties, there is no explicit legal requirement for RECCo (as a non-BSC Party) to support this and no contractual recourse if its duties are not met.
Letter from the Authority to the REC Code Manager - Authority Led Modification Proposal
Initial Assessment Report v1.0 (Approved)
Change Proposal Plan v1.0 (Approved)
R0003 - Preliminary Change Report v1.0 (Approved)
R0003 - Final Change Report v1.0 (Pre-Vote)
R0003 - Final Change Report v2.0 (Post-Vote)
R0003 - Authority Decision
Company Name
-
Review status
Review required

Review of Data Specification Category in REC Baseline Statement

Date of latest update
Type
Change
ID
R0002
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

01 Sep 2021

Due:

03 Sep 2021

Completion:

02 Sep 2021

Change Panel review

Completed

Start:

03 Sep 2021

Due:

07 Sep 2021

Completion:

07 Sep 2021

Preliminary Change Report published

Completed

Start:

07 Sep 2021

Due:

09 Sep 2021

Completion:

09 Sep 2021

Consultation start

Completed

Start:

09 Sep 2021

Due:

14 Sep 2021

Completion:

14 Sep 2021

Consultation end

Completed

Start:

14 Sep 2021

Due:

20 Sep 2021

Completion:

20 Sep 2021

Final Change Report published

Completed

Start:

20 Sep 2021

Due:

24 Sep 2021

Completion:

24 Sep 2021

Change Panel decision

Completed

Start:

24 Sep 2021

Due:

05 Oct 2021

Completion:

05 Oct 2021
Status
Implementation Date
Status Live
EMAR Version 04.11.2021_live
Included changes Affected REC Items
R0001 Amendment to DCC Service Flag (DI51130) Data Item

Documents

Name Version Last updated Actions
241.04 KB
Version 1.3 - 29 May 2026 XLSX - 241.04 KB
1.3 29 May 2026
455.42 KB
Version 1.3 - 29 May 2026 XLSX - 455.42 KB
1.3 29 May 2026
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a market participant, I need to understand any changes to market messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  2. As the REC Code Manager, I need to ensure that proposals to amend the Data Specification are subject to appropriate scrutiny and impact assessment, so that impacted stakeholders can appropriately engage with the proposal and understand the impacts to their business.
Proposed Solution Document
Document title
Changes to REC Baseline Statement
Archive
Off
Problem Statement
The Data Specification was not included in the Switching Programme Change Requests that gave effect to REC V2.0. Therefore, the Data Specification was not formally designated as part of REC V2.0 and has temporarily been added to the REC Baseline Statement as a Category 3 product. This means that changes to the Data Specification, including changes to Market Messages and Data Items used by market participants to interface with other businesses and service providers, are not subject to the process set out in the REC Change Management Schedule. Changes to these artefacts can have significant impacts to the systems and processes of market participants and service providers. These changes should follow a robust and thorough assessment to ensure these impacts are identified and considered, and the most appropriate solution is considered. The Category 3 change process is not appropriate for this, as changes to Category 3 products should not cause a material impact to parties and stakeholders.
Initial Assessment Report V1.0 (Approved)
Change Proposal Plan V1.0 (Approved)
R0002 - Preliminary Change Report v1.0 (Approved)
R0002 - Final Change Report v1.0 (Pre-Vote)
R0002 - Final Change Report v2.0 (Post-Vote)
Company Name
-
Review status
Review required

Amendment to DCC Service Flag (DI51130) Data Item

Date of latest update
Type
Change
ID
R0001
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

01 Sep 2021

Due:

03 Sep 2021

Completion:

02 Sep 2021

Change Panel review

Completed

Start:

03 Sep 2021

Due:

07 Sep 2021

Completion:

07 Sep 2021

Preliminary Change Report published

Completed

Start:

07 Sep 2021

Due:

09 Sep 2021

Completion:

09 Sep 2021

Consultation start

Completed

Start:

09 Sep 2021

Due:

14 Sep 2021

Completion:

14 Sep 2021

Consultation end

Completed

Start:

14 Sep 2021

Due:

20 Sep 2021

Completion:

20 Sep 2021

Final Change Report published

Completed

Start:

20 Sep 2021

Due:

24 Sep 2021

Completion:

24 Sep 2021

Change Panel decision

Completed

Start:

24 Sep 2021

Due:

05 Oct 2021

Completion:

05 Oct 2021
Status
Implementation Date
Status Live
EMAR Version 04.11.2021_live
Included changes Affected REC Items
R0001 Amendment to DCC Service Flag (DI51130) Data Item

Documents

Name Version Last updated Actions
241.04 KB
Version 1.3 - 29 May 2026 XLSX - 241.04 KB
1.3 29 May 2026
455.42 KB
Version 1.3 - 29 May 2026 XLSX - 455.42 KB
1.3 29 May 2026
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want my Energy Supplier to know the status of my smart meter, so they can bill me accurately using remote smart data.
  2. As an Energy Supplier, I need to establish whether there is a smart meter I can communicate with in the DCC network, so I can complete the correct process for customers switching supplier.
  3. As a Distribution Network Operator, I need to establish whether there is a smart meter I can communicate with in the DCC network, so I know whether to respond to smart meter alerts.
Proposed Solution Document
Document title
Amendments to DCC Service Flag Data Item - Legal Text
Archive
Off
Document title
Link to EMAR - Change Set (Clean)
Archive
Off
Problem Statement
SEC Modification Proposal 077 proposes to update the values, and business rules, of the DCC Service Flag Data Item. This will allow users to use the Data Item as originally intended, to establish whether there is an active smart meter in the DCC network that they can communicate with at a premises. This modification has been approved for implementation on 4th November 2021 by the SEC, and a consequential change is required to the Data Specification to reflect this.
SEC MP077 - Modification Report v1.0.pdf
SEC MP077 Legal Text v1.0 (1).pdf
Initial Assessment Report V1.0 (Approved)
Change Proposal Plan V1.0 (Approved)
R0001 - Preliminary Change Report v1.0 (Approved)
R0001 - Final Change Report v1.0 (Pre-Vote)
R0001 - Final Change Report v2.0 (Post-Vote)
Company Name
-
Review status
Review required