A review of Supplier access to data on GES

Date of latest update
Type
Change
ID
R0110
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
When Registered Gas Suppliers and Registered Shippers access the Gas Enquiry Service (GES) they currently have access to their own unique set of Data Items. This Change would give Registered Gas Suppliers access to some additional Data Items which form part of the Registered Gas Shipper Data Items, to enable them to solve Consumer facing switching and billing issues.
Proposer
Lorna Mallon
Change Plan

Service Provider Impact Assessment Due

Completed

Start:

19 Apr 2023

Due:

07 Sep 2023

Completion:

07 Sep 2023

Preliminary Change Report Issued

Completed

Start:

07 Sep 2023

Due:

20 Sep 2023

Completion:

20 Sep 2023

Responsible Committee Review

Completed

Start:

20 Sep 2023

Due:

27 Sep 2023

Completion:

27 Sep 2023

Consultation Issued

Completed

Start:

27 Sep 2023

Due:

27 Sep 2023

Completion:

11 Oct 2023

Final Change Report Issued

Completed

Start:

27 Sep 2023

Due:

18 Oct 2023

Completion:

18 Oct 2023

Responsible Committee Decision

Completed

Start:

18 Oct 2023

Due:

25 Oct 2023

Completion:

25 Oct 2023
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 03.11.2023_live

Documents

Name Version Last updated Actions
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Supplier to be able to access essential information about my energy account, so that billing issues and switching problems can be addressed easily.
  2. As a Registered Gas Supplier, I want to be able to readily access appropriate information relating to my RMP portfolio, so that I can resolve consumer facing billing issues more easily. As the GES Provider, I want my users to be able to access information that helps them fulfil their objectives (in line with REC Data Access principles), so that the service is used as efficiently as possible.
Proposed Solution Document
Document title
R0110 - Draft Legal Text - Gas Data Access Matrix - 20.09.2023
Archive
Off
Problem Statement
When Registered Gas Suppliers need to resolve queries relating to meter reading history, they may need to access information that is currently only available to the Registered Shipper in GES. As a result, Registered Gas Suppliers may be unable to resolve these consumer facing issues on their own, as they do not have direct access to the required Registered Shipper only information.
SME
SME Role
Lead Technical Analyst
R0110 - CP Form (Downloadable Version)
R0110 Initial Assessment Report v1.0 (Approved) - 01.08.2023
R0110 Change Proposal Plan v1.0 (Approved) - 01.08.2023
R0110 Preliminary Change Report v1.0 (Approved) - 27.09.23
R0110 Consolidated Consultation Responses - Non-Confidential v1.0
R0110 Final Change Report v2.0 (Post-Vote) 25.10.23
Company Name
ScottishPower Energy Retail Ltd
Review status
Review required

Enabling Electricity Enquiry Service searches using a Unique Property Reference Number

Date of latest update
Type
Change
ID
R0108
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Consumers that wish to utilise multi-channel switching services for gas, electricity, water, broadband, bank, home insurance etc. cannot make use of generic address-capture services for electricity switching as Unique Property Reference Number (UPRN) search functionality is not available within the Electricity Enquiry Service (EES).
Proposer
Andrew Dawson
Change Plan

Service Provider Impact Assessment window start

Completed

Start:

19 Apr 2023

Due:

02 Oct 2023

Completion:

02 Oct 2023

Service Provider Impact Assessment window close

Completed

Start:

02 Oct 2023

Due:

18 Dec 2023

Completion:

18 Dec 2023

Party Impact Assessment start

Completed

Start:

18 Dec 2023

Due:

12 Jan 2024

Completion:

12 Jan 2024

Preliminary Change Report and Consultation issued

Completed

Start:

02 Feb 2024

Due:

16 Feb 2024

Completion:

16 Feb 2024

Party Impact Assessment close

Completed

Start:

12 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Consultation close

Completed

Start:

16 Feb 2024

Due:

08 Mar 2024

Completion:

08 Mar 2024

Final Change Report issued

Completed

Start:

08 Mar 2024

Due:

15 Mar 2024

Completion:

15 Mar 2024

Responsible Committee decision

Completed

Start:

15 Mar 2024

Due:

27 Mar 2024

Completion:

27 Mar 2024

Appeal window closure

Completed

Start:

27 Mar 2024

Due:

12 Apr 2024

Completion:

12 Apr 2024
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 08.11.2024_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want to be able to switch my electricity easily and efficiently.
  2. As I Consumer, I want to be able to quote or switch my electricity as part of a packaged search.
  3. As a Supplier, I want Consumers to be able to search for quotes and switch efficiently.
  4. As an organisation providing multi-channel switching services, I want Consumers to be able to use one set of data when requesting quotes.
Proposed Solution Document
Document title
R0108 Requirements Specification v0.1
Archive
Off
Document title
Electricity Data Access Matrix_R0108 Draft
Archive
Off
Document title
EES API Interface Specification v3.1.6 - Redline
Archive
Off
Problem Statement
Consumers that wish to utilise multi-channel switching services, cannot benefit from the efficiencies of using a UPRN for the electricity Switch as the EES does not provide this functionality.
SME
SME Role
Lead Technical Analyst
Change Proposal Form
R0108 - Change Proposal Plan (Approved) 17.10.2023
R0108 - Initial Assessment Report (Approved) 17.10.2023
R0108 Consolidated Party IA Responses v1.0 Non-confidential (16.02.2024)
R0108 - Preliminary Change Report v1.0 published for consultation (16.02.2024)
R0108 - Consolidated Consultation Responses_Non Confidential (15.03.2024)
R0108 - Final Change Report v2.0 Post-Vote (27.03.2024)
Company Name
GB Group plc
Review status
Review required

CSS Message Time Stamping

Date of latest update
Type
Change
ID
R0107
Urgent
No
Latest Update
11/08/2023 - This Change Proposal has been withdrawn. During the progression of the Preliminary Impact Assessment work, it was found that an existing data item ‘EventDate’ could be leveraged to address the issue stated in the Change Proposal. R107 will be open for adoption until 25/08/2023.
Summary
Empty
Proposer
admin
Change Plan

Test

In Progress

Start:

14 Apr 2023

Due:

19 Mar 2026

Completion:

19 Mar 2026
Impacted Consumers
Impacted REC Services
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
R0107 - Change Proposal Form
Company Name
DCC
Review status
Review required

Review of ONAGE SLAs

Date of latest update
Type
Change
ID
R0105
Change Category
Change Path
Priority
Urgent
No
Latest Update
11/09/24 - Change Report REJECTED by REC Metering Expert Panel
Summary
In light of the changes introduced as part of the Faster Switching Programme, this Change Proposal has been raised to review the SLAs and lead times around the sending and receiving/processing of the ONAGE and associated Market Messages.
Proposer
Natalie Hitchman
Change Plan

Solution Development Closes

Completed

Start:

06 Apr 2023

Due:

31 May 2024

Completion:

31 May 2024

Party Impact Assessment Published

Completed

Start:

31 May 2024

Due:

04 Jul 2024

Completion:

04 Jul 2024

Preliminary Change Report & Consultation Published

Completed

Start:

04 Jul 2024

Due:

08 Aug 2024

Completion:

08 Aug 2024

Final Change Report Published

Not Started

Start:

08 Aug 2024

Due:

04 Sep 2024

Completion:

Responsible Committee Decision

Not Started

Start:

04 Sep 2024

Due:

11 Sep 2024

Completion:

Appeal Window Closure

Not Started

Start:

11 Sep 2024

Due:

25 Sep 2024

Completion:

Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want to have continual Meter Equipment Manager coverage, so that I am confident that work on my Metering Asset can be conducted even during a Switch.
  2. As a MEM, I want my obligations relating to appointment and de-appointment to be considered and practicable, so that my operational processes are not unduly onerous. 2 - As a Gas Supplier, I want to be able to reliably and predictably appoint and de-appoint MEMs during a Switch, so that I am confident that my Consumers are not left without a MEM at any stage. 3 - As the Code Manager, I want REC processes to operate within SLAs that are reflective of both the realistic operational capacities of REC Parties, and also of the needs of the broader market, so that the end Consumer has the best possible Switching experience.
Problem Statement
Current ONAGE SLAs may no longer be proportionate to the length of the Switching process as a result of the Faster Switching programme. Lengthy ONAGE SLAs relative to the timescale of the switching process may result in Consumers being left without a MEM during the switch process. The proposer has asked the Code Manager to conduct a review of the ONAGE SLAs to explore whether these SLAs are still appropriate, and therefore ensure that Consumers are subject to any detriment.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0105 - Change Proposal Form (downloadable version) 06.04.2023
R0105 Change Proposal Plan (Approved) V2.0 31.05.24
R0105 Initial Assessment Report (Approved) V1.0 16.04.24
R0105 Change Proposal Re-Plan (Approved) V1.0 31.05.24
R0105 Consolidated IA Responses V1.0 08.08.24
R0105 Change Report (Published for Consultation) v1.0 08.08.24
R0105 Consolidated Consultation Responses V1.0 02.09.2024
R0105 Change Report (Rejected) V2.0 11.09.24
Company Name
-
Review status
Review required

Revision of the Implementation Date and approved solution for R0021

Date of latest update
Type
Change
ID
R0101
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
Updated 28 April 2023: Following discussions with DCUSA and Ofgem, this change has been amended to remove reference to deferral of R0021. The Change will focus on providing clarity on the proposed solution and Market Messages to be used when Safe Isolation Works are undertaken. The implementation approach has been amended to a Phased Implementation Approach between 30 June and 03 November 2023.
Proposer
tina.pearce
Change Plan

Solution Analysis and Development

Completed

Start:

23 Mar 2023

Due:

31 Mar 2023

Completion:

31 Mar 2023

Responsible Committee Review Completed

Completed

Start:

31 Mar 2023

Due:

27 Apr 2023

Completion:

27 Apr 2023

Consultation Started

Completed

Start:

27 Apr 2023

Due:

28 Apr 2023

Completion:

28 Apr 2023

Consultation Ended

Completed

Start:

28 Apr 2023

Due:

16 May 2023

Completion:

16 May 2023

Final Change Report Issued

Completed

Start:

16 May 2023

Due:

19 May 2023

Completion:

19 May 2023

Responsible Committee Recommendation

Completed

Start:

19 May 2023

Due:

26 May 2023

Completion:

26 May 2023
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a premise owner I want to be able to contract with a Safe Isolator Provider (SIP), and for the SIP to be able to provide the service in a fully compliant manner.
  2. As a REC MEM who wants to operate as SIP, I need clarity on the solution and Market Message requirements when I provide Safe Isolation Works to Premise Owners. As a Registered Supplier, I need clarity on the solution and Market Message requirements when my consumers have Safe Isolation Works completed at their Premise Owners by SIPs.
  3. As a Distribution Network Operator, I need clarity on the solution and Market Message requirements when my connected parties have Safe Isolation Works completed at their Premise Owners by SIPs.
Proposed Solution Document
Document title
R0101 - Legal text changes for FCR - 19.05.2023
Archive
Off
Document title
FCR R0101 MM & Standards Definition v2.0
Archive
Off
Problem Statement
Updated: 28/04/2023. Following an implementation webinar for R0021 on 2 March, several matters were raised by Parties regarding the solution and the Market Messages that the Code Managers needs to address to ensure that the solution approved by Ofgem can be implemented successfully.
SME
SME Role
Lead Technical Analyst
R0101 Change Proposal Form (downloadable version) 23.03.2023
R0101 - Safe Isolation Provider Solution Overview - V5.0 19.5.2023
R0101 - Initial Assessment Report (approved) - v1.0 06.04.2023
R0101 - Change Proposal Plan - v3.0
R0101 Preliminary Change Report v2.0 (Approved) 28.04.2023
Phased Implementation Approach v1.0 28.04.2023
FAQ's Webinar 09 May 2023 v1.0
Non-Confidential Consolidated Consultation Responses v1.0 19.05.2023
R0101 - Draft Legal text for FCR v2.0 MM & Standards Definition
R0101 Final Change Report
Company Name
REC
Review status
Review required

Optional fuzzy searching in EES

Date of latest update
Type
Change
ID
R0098
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
This change seeks to introduce new configuration settings in to the EES API - to enable a search to be exact or fuzzy.
Proposer
Andrew Dawson
Change Plan

Service Provider Impact Assessment window start

Completed

Start:

07 Mar 2023

Due:

09 Oct 2023

Completion:

09 Oct 2023

Service Provider Impact Assessment window close

Completed

Start:

09 Oct 2023

Due:

27 Dec 2023

Completion:

24 Nov 2024

Party Impact Assessment start

Completed

Start:

27 Dec 2023

Due:

12 Jan 2024

Completion:

12 Jan 2024

Party Impact Assessment close

Completed

Start:

12 Jan 2024

Due:

02 Feb 2024

Completion:

02 Feb 2024

Preliminary Change Report and Consultation issued

Completed

Start:

02 Feb 2024

Due:

16 Feb 2024

Completion:

16 Feb 2024

Consultation close

Completed

Start:

16 Feb 2024

Due:

08 Mar 2024

Completion:

08 Mar 2024

Final Change Report issued

Completed

Start:

08 Mar 2024

Due:

15 Mar 2024

Completion:

15 Mar 2024

Responsible Committee decision

Completed

Start:

15 Mar 2024

Due:

27 Mar 2024

Completion:

27 Mar 2024

Appeal window closure

Completed

Start:

27 Mar 2024

Due:

12 Apr 2024

Completion:

12 Apr 2024
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 08.11.2024_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want to be able to switch my electricity easily and efficiently.
  2. As an organisation providing switching services, I want Consumers to be able to search addresses efficiently.
Proposed Solution Document
Document title
EES Technical Requirement Specification v0.2
Archive
Off
Document title
EES API Interface Specification v3.1.6 - Redline
Archive
Off
Problem Statement
Where a Consumer initiates a Switch through a Supplier, PCW or TPI that utilises the EES API address searches can fail as the API only undertakes “fuzzy” matching. Address Search errors will then need to go through an exception handling process creating an inefficiency and producing a loss of confidence in the Switching process.
SME
SME Role
Lead Technical Analyst
R0098 - Change Proposal Form 08.03.2023
R0098 - Change Proposal Plan (Approved) 17.10.2023
R0098 - Initial Assessment Report (Approved) 17.10.2023
R0098 Consolidated Party IA Responses v1.0_Non Confidential (16.02.2024)
R0098 - Preliminary Change Report v1.0 published for consultation (16.02.2024)
R0098 - Consolidated Consultation Responses_Non Confidential (15.03.2024)
R0098 - Final Change Report v2.0 Post-Vote (27.03.2024)
Company Name
GB Group plc
Review status
Review required

Changes to allow DNOs to reinstate disconnected MPANs

Date of latest update
Type
Change
ID
R0095
Change Category
Change Path
Priority
Urgent
No
Latest Update
10/04/2026 - Change has been taken of hold. This change will be triggered for a reassessment for Code Manager Impact on 14/04/2026.
Summary
When Meter Point Administration Numbers (MPANs) are erroneously disconnected, they cannot be reinstated. As a result, Consumers suffer billing issues and Registered Suppliers cannot settle against the disconnected MPAN. This change seeks to introduce a mechanism to restore erroneously disconnected MPANs.
Proposer
leanne.yates
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I do not want the erroneous disconnection of my MPAN to affect the continuity of my supply contract and billing arrangements.
  2. As a DNO, I want to be able to reverse erroneous disconnections with no lasting effect so that I don’t need to create a new MPAN to resolve the issue, thereby avoiding DUoS payment collection issues. 2 - As a Supplier, I want to be able to reverse erroneous disconnections with no lasting effect so that I can correctly bill my consumers. 3 - As the CSS, I want users to be able to effectively resolve discrepancies, so that industry data for their portfolio is accurate. 4 - As MPRS, I want users to be able to effectively resolve discrepancies, so that industry data for their portfolio is accurate.
Problem Statement
When MPANs are incorrectly identified and targeted for disconnection, the RMP will be erroneously terminated following receipt of Termination Market Messages by the CSS. This process is irreversible once triggered, meaning that there is no mechanism to restore the MPAN as it was previously. This results in a poor Consumer experience, and settlement misbalancing for Registered Suppliers. Currently, there is no mechanism to mitigate the negative impact on Registered Suppliers/DNO and Consumers.
SME
SME Role
Lead Technical Analyst
R0095 - Change Proposal form downloadable version 17.02.2023
R0095 Change Proposal Plan v1.0 (Approved) - 20.09.23
R0095 Initial Assessment Report v1.0 (Approved) - 20.09.2023
R0095 - Change Proposal Re-Plan (Approved) v1.0-13.12.23
Company Name
-
Review status
Review required

Clarifications to the Theft Detection Incentive Scheme

Date of latest update
Type
Change
ID
R0091
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
The Energy Theft Detection Incentive Scheme (TDIS) seeks to encourage Suppliers to undertake theft investigations. Following the completion of the first scheme year operated wholly under the REC, there have been several areas of the Code identified where additional clarity would benefit the administration of the TDIS.
Proposer
andrew.waghorn
Change Plan

Initial Assessment Report Issued

Completed

Start:

23 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Change Proposal Plan Issued

Completed

Start:

27 Jan 2023

Due:

27 Jan 2023

Completion:

27 Jan 2023

Preliminary Change Report Issued

Completed

Start:

07 Feb 2023

Due:

17 Feb 2023

Completion:

17 Feb 2023

Consultation Issued

Completed

Start:

17 Feb 2023

Due:

17 Feb 2023

Completion:

17 Feb 2023

Responsible Committee Decision

Completed

Start:

17 Feb 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

IAR and CPP Approval

Completed

Start:

27 Jan 2023

Due:

07 Feb 2023

Completion:

07 Feb 2023
Status
Implementation Date
Status Live
EMAR Version 01.04.2023_live
Included changes Affected REC Items
R0100 Update to Error Handling Documents
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Supplier, I need my TDIS obligations to be clear to ensure I can meet the requirements appropriately.
  2. As the Code Manager, I want all Suppliers to be clear on the required Energy Theft reporting so that the scheme can be effectively administered.
  3. As RECCo, I want to ensure that all Suppliers have clear obligations to ensure the effective administration of TDIS to support the Theft Reduction Strategy.
Proposed Solution Document
Document title
R0091 - Legal Text (as at IAR/CPP)
Archive
Off
Document title
R0091 - Legal Text at FCR 21.03.2023
Archive
Off
Document title
R0091 - Legal Text FINAL
Archive
Off
Document title
EMAR Link
Archive
Off
Problem Statement
To enable REC Parties and their agents to successfully meet the obligations of the TDIS, the REC needs to accurately reflect the intention of the requirements and current processes.
R0091 - Change Proposal Form
R0091 - Change Proposal Plan (Approved) 07.02.2023
R0091 - Initial Assessment Report v1.0 (Approved) 07.02.2023
R0091 - Preliminary Change Report v1.0 17.02.2023
R0091 - Consolidated Consultation Responses
R0091 - Final Change Report v1.0 (Pre-Vote) 21.03.2023
R0091 - Final Change Report v2.0 (Post-Vote) 24.03.2023
Company Name
-
Review status
Review required

ERDS Upload File in the Data Specification and clarification of cancellation code

Date of latest update
Type
Change
ID
R0086
Priority
Urgent
No
Latest Update
06/11/2023 - Withdrawal adoption window closed.
Summary
The MPAS/ERDS Upload file has historically been a part of the Data Specification however during transition from the MRA, the process has been omitted. This change seeks to restore the file to the specification. Secondly, the file previously provided a cancellation reason code for Switches. Under the current REC arrangements (i.e. since CSS go live) Reason codes are not provided and have been defaulting to W which indicated a reason of “withdrawn” which may now be misleading. This Change Proposal has been raised to address these issues
Proposer
admin
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
R0086 - Change Proposal Form (downloadable version)
Company Name
-
Review status
Review required

Housekeeping changes to the approved legal text for R0047

Date of latest update
Type
Change
ID
R0084
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
Change Proposal R0047 - Metering Code of Practice Consolidation Review, has been approved for implementation on 01 April 2023. Since approval of the Change Proposal the Code Manager has identified a number of omissions, clarifications, typographical errors and changes needed to the approved legal text. This CP has been raised to make the changes to the legal text and ensure accurate text is introduced into the REC.
Proposer
Ann Perry
Change Plan

Preliminary Change Report published and issued for Consultation

Completed

Start:

16 Dec 2022

Due:

24 Feb 2023

Completion:

24 Feb 2023

Consultation ends

Completed

Start:

24 Feb 2023

Due:

10 Mar 2023

Completion:

10 Mar 2023

Final Change Report published

Completed

Start:

10 Mar 2023

Due:

21 Mar 2023

Completion:

21 Mar 2023

Responsible Committee decision (Ex-Committee)

Completed

Start:

21 Mar 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Appeal window closure

In Progress

Start:

24 Mar 2023

Due:

07 Apr 2023

Completion:

Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 01.04.2023_live
Included changes Affected REC Items
R0100 Update to Error Handling Documents
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a DNO, MEM, AMI, ASP or MI, I want all Code of Practice obligations to be clear and transparent, to ensure all obligations placed upon my organisation and operatives are understood and can be met in the most efficient way.
  2. As an Energy Supplier, I want to be confident that my Appointed agents are compliant with all relevant CoP obligations to ensure the safety of my Consumers.
  3. As RECCo, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
  4. As the Metering Scheme Auditor, I want the Metering Scheme obligations to be clear and transparent, to ensure the arrangements deliver against the RECCo strategic aims.
Proposed Solution Document
Document title
R0084 Legal text changes - CoMCoP - (For Final Change Report) 21.03.2023
Archive
Off
Document title
R0084 Legal text changes - CoMCoP - (For consultation) 24.02.2023
Archive
Off
Problem Statement
To enable REC Parties to successfully meet the obligations of the CoMCoP, when it is implemented via Change Proposal R0047 on 01 April 2023, the CoMCoP needs to accurately reflect the intention of R0047 and current processes.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0084 - CP Form (Downloadable version)
R0084 - Legal text changes identified pre IAR/CPP - uploaded 12.02.23
R0084 - Change Proposal Plan v1.0 (Approved) 23.02.2023
R0084 - Initial Assessment Report v1.0 (Approved) 23.02.2023
R0084 - Preliminary Change Report v1.0 (Published for Consultation) 24.02.2023
R0084 - Consolidated consultation responses v1.0 21.03.2023
R0084 - Final Change Report v2.0 (Post-Vote) 24.03.2023
Company Name
-
Review status
Review required