Access to SDES for Gas Networks
Date of latest update
Type
Change
ID
R0162
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/10/2025 - the REC Change Panel approved the withdrawal of the proposal plan for R0162 and that this Change would be placed on hold while I0285 progresses.
Summary
Raising on behalf of the Gas Networks, who currently struggle to find who to email queries to within suppliers organisation. Suppliers and Electricity DNO's moved to SDES to ensure all communications were in a secure portal, with SLA's and for GDPR reasons, but Gas Networks do not have access to this portal, and not considered during the implementation of the system. They also obtain photo's when out on site to help resolve queries and would like somewhere to upload them to send to suppliers.
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0162 Solution Development Report V1.0
Archive
Off
Problem Statement
Energy Suppliers and Distribution Network Operators (DNOs) moved to SDES to ensure all communications were in a secure portal, with SLAs and for GDPR reasons. Gas Transporters do not have access to this portal, and were not considered during the implementation of the system. As such, communications are not being sent as securely as possible.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
CP Form Access to SDES for Gas Networks
R0162 Change Report (Proposal Plan) V1.0 Approved 15.04.2025
R0162 Consolidated Impact Assessment Responses v1.0
R0162 Extension to Plan V1.0 approved 27.08.25
R0162 Rebaseline Plan (withdrawal) V2.0 approved 21.10.25
Company Name
Octopus Energy
Review status
Review required
Removal of Facsimile as a Method of Code Communication
Date of latest update
Type
Change
ID
R0157
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
The Public Switched Telephone Networks (PSTN) will be switched off in December 2025 by all telecom companies and will be replaced with an Internet Protocol (IP) digital network. Existing fax machines that are incompatible with new all IP digital networks will become obsolete and no longer capable of meeting Code Communications as prescribed in the REC. All communication methods referencing fax or facsimile will need to be removed and replaced with email (where this is not an existing option), unless an alternative form of communication is needed. Please note: The government have published preparatory guidance which includes migrating to IP-supported technology in advance of the planned decommissioning. UK transition from analogue to digital landlines - GOV.UK (www.gov.uk) Critical National Infrastructure (CNI) (“assets, facilities, systems, networks or processes and the essential workers that operate and facilitate them”) which is subdivided into 13 sectors including Energy, are advised to consider how they move to digital alternatives smoothly to avoid unnecessary interruption following the PSTN switch-off. Openreach's Energy Guidance Factsheet can be found in the CPs Accompanied Documents.
Change Plan
Preliminary Change Report and Consultation Issued
Completed
Start:
03 Jan 2024Due:
09 Feb 2024Completion:
09 Feb 2024Final Change Report Issued
Completed
Start:
23 Feb 2024Due:
12 Mar 2024Completion:
12 Mar 2024Responsible Committee Decision
Completed
Start:
12 Mar 2024Due:
19 Mar 2024Completion:
19 Mar 2024Appeal Window Closure
Not Started
Start:
19 Mar 2024Due:
02 Apr 2024Completion:
Consultation Close
Completed
Start:
09 Feb 2024Due:
23 Feb 2024Completion:
23 Feb 2024Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
07 November 2025
| Included changes | Affected REC Items | |
|---|---|---|
| R0003 | Market-wide Half-Hourly Settlement Implementation |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- All communication methods referencing fax or facsimile will need to be removed and replaced with email
Proposed Solution Document
Document title
Existing References to Fax and "e-mail" in the REC (January 2024)
Archive
Off
Document title
R00157 - Legal Text Changes (All Affected REC Products and Documents)
Archive
Off
Problem Statement
Existing fax machines that are incompatible with new all IP digital networks will become obsolete and no longer capable of meeting Code Communications as prescribed in the REC
Stages Selection
CP Form - Removal of a Fax as a Code Communication method
R0157 - Change Proposal Plan V1.0 (Approved) 30.01.2024
R0157 - Initial Assessment Report V1.0 (Approved) 30.01.2024
R0157 - Consolidated Consultation Responses
R0157 - Preliminary Change Report V1.0 (For Consultation) 09.02.2024
R0157 - Final Change Report V2.0 (Post-Vote) 19.03.2024
Open Reach Energy Industry Factsheet
Company Name
REC Code Manager
Review status
Review required
Allowing different Metering Equipment Managers (MEMs) to be appointed to Import and Export Metering Points
Date of latest update
Type
Change
ID
R0144
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
17/02/2025 - R0144 has been withdrawn by the Proposer, alongside it's joint BSC Change P459, as they cannot be progressed prior to MHHS. The Proposer will look to re-raise both changes in the future. The adoption window for this withdrawal has closed.
Summary
The Export Supplier needs to be able to appoint different MEMs to that of the Import Supplier
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As a Consumer, I want a competitive Export market so I can get the best rates for the energy I generate. I want clear metering equipment ownership so I can be confident my meter is functional and safe. I want accurate billing from my Export Supplier.
- As an Export Supplier, I want to be able to appoint the MEM that ties in with my commercial strategy.
- As a MEM, I want clear guidance on the responsibilities I have for any metering equipment I am appointed to.
Problem Statement
Export Suppliers may become non-compliant with industry regulations if they are unable to appoint the same MEM as the Import Supplier, for example when the Consumer switches Import Supplier or when the Import Supplier changes the appointed MEM.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
Change Proposal Form
R0144 Change Proposal Plan Withdrawal v1.0 (Pre Approval)
R0144 Change Proposal Plan v1.0 (16.04.2024) Approved
R0144 Initial Assessment Report v1.0 (16.04.2024) Approved
Company Name
REC Code Manager
Review status
Review required
Alignment of Market Message D0225 ‘consent to share flag’ to support PSR data sharing
Date of latest update
Type
Change
ID
R0139
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
This change was implemented on the 12th April 2024.
Summary
Ofgem have been in with discussion with Energy Suppliers this year, requesting them to voluntarily change how they use the consent option within the Priority Services Register (PSR) flow. This Change Proposal (CP) has been raised to make sure the Market Message mirrors the process agreed between Ofgem and Energy Suppliers by re-naming the Priority Services Register (PSR) Data Item DI51497 (J2208) as “Lawful basis for sharing” and to amend the relevant clauses in REC Schedule 13 if needed.
Change Plan
Party Impact Assessment
Completed
Start:
11 Aug 2023Due:
05 Jan 2024Completion:
05 Jan 2024Preliminary Change Report Issued
Completed
Start:
05 Jan 2024Due:
26 Jan 2024Completion:
26 Jan 2024Consultation
Completed
Start:
26 Jan 2024Due:
09 Feb 2024Completion:
09 Feb 2024Final Change Report Issued
Completed
Start:
09 Feb 2024Due:
16 Feb 2024Completion:
16 Feb 2024Responsible Committee Decision
Not Started
Start:
16 Feb 2024Due:
28 Feb 2024Completion:
Appeal Window Closure
Not Started
Start:
28 Feb 2024Due:
13 Mar 2024Completion:
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
12 April 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0105 | Review of ONAGE SLAs |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Redlining - DI51497 - J2208 - Consent to share data obtained
Archive
Off
Problem Statement
The current PSR Data Item DI51497(J2208) ‘Consent to share data obtained’ does not mirror the legal basis for sharing data that DNOs rely on, or the process that Suppliers have planned to have in place by early 2024.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0139 - Change Proposal Form
Consolidated Impact Assessment Responses
Consolidated Consultation Responses R0139
R0139 Change Proposal Plan v1.0 Approved
R0139 Initial Assessment Report v1.1 Approved
R0139 - Extension to Change Plan v1.0
R0139 Preliminary Change Report v1.0
R0139 Final Change Report v1.0 approved
ICO letter to Ofgem
R0139 redlining - DI51497 - J2208 - Consent to share data obtained
Company Name
Energy Networks Association
Review status
Review required
Updates to the Data Access Matrix
Date of latest update
Type
Change
ID
R0130
Change Category
Change Path
Priority
Urgent
No
Latest Update
21/05/2024 - This change proposal has been withdrawn and the adoption window is closed. There is no longer the requirement for the requester to have Enquiry Services Data.
Summary
There are organisations that are named in Schedule 12 - Data Access that are not recorded in the gas and/or electricity Data Access Matrix (DAM). This means it is not possible for the Code Manager to provision them access. All organisations listed in Schedule 12 to access data in the REC should have an entry in the Data Access Matrices. This Change Proposal has been raised to review the Schedule and DAMs and take forward the necessary changes.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
Date of Update to Priority
Solution Development
Stages Selection
R0130 - Change Proposal form (downloadable version) 16.06.2023
Company Name
REC Code Manager
Review status
Review required
Clarifying Event of Default requirements
Date of latest update
Type
Change
ID
R0129
Priority
Urgent
No
Latest Update
04/10/2023 - Following the approval of R0138, this change has been withdrawn.
Summary
Following several recent events of non-payment for services and REC defaults it is clear that the event of default provisions in the Code are unclear. This change seeks to introduce clarity to the REC Main Body.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
R0129 - Change Proposal form (downloadable version) 16.06.2023
Company Name
REC Code Manager
Review status
Review required
Removal of CSS Business Rule 1177 to reflect OFAF optionality
Date of latest update
Type
Change
ID
R0128
Change Category
Change Path
Priority
Urgent
No
Latest Update
06/12/2023- This Change was implemented as part of the 6 December 2023 Extraordinary Release *No Market-wide Half Hourly Settlement impacts
Summary
This change looks to remove business rule 1177, from the Central Switching Service (CSS) Message Business Data Validation Rules, which mandates that all Suppliers have a ‘One Fail All Fail’ (OFAF) reference included in their Switching Operational Data record in CSS. This was not the intended design. CSS system functionality will be updated as part of an operational change, as agreed at Switching go-live. This change is required to align the Data Specification with the operation of the system.
Change Plan
Preliminary Change Report and Consultation Issued
Completed
Start:
16 Jun 2023Due:
28 Jul 2023Completion:
27 Jul 2023Consultation Closed
Completed
Start:
28 Jul 2023Due:
18 Aug 2023Completion:
18 Aug 2023Final Change Report published
Completed
Start:
18 Aug 2023Due:
08 Sep 2023Completion:
08 Sep 2023Responsible Committee Decision
Completed
Start:
08 Sep 2023Due:
27 Sep 2023Completion:
15 Sep 2023Appeal Window Closed
Completed
Start:
27 Sep 2023Due:
02 Oct 2023Completion:
02 Oct 2023Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
06 December 2023
| Included changes | Affected REC Items | |
|---|---|---|
| R0106 | Performance Assurance Report Catalogue V5.1 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
- As the Code Manager, I want the REC to reflect the intended design and align to the CSS functionality so that I do not need to operate a workaround As the Switching Operator, I want the REC Data Specification to reflect the functionality as designed so that my obligations are clear
- As an Energy Supplier, I want the SOD, relating to my Market Participant Identifier/s (MPIDs), to accurately record my OFAF reference so that my OFAF qualification status is clearly understood
Proposed Solution Document
Document title
R0128 Proposed Solution v1.0 (Initial Assessment) 11.07.2023
Archive
Off
Document title
R0128 Proposed Solution v1.0 (Approved) 18.09.2023
Archive
Off
Document title
R0128 - Draft Legal Text 27.07.2023
Archive
Off
Document title
R0128 - Approved Legal Text 18.09.23
Archive
Off
Problem Statement
As a Consumer, I want the operational switching processes to run efficiently so that my switching experience is not impacted
Stages Selection
SME
SME Role
Lead Technical Analyst
R0128 - Change Proposal form (downloadable version) 16.06.2023
R0128 - Change Proposal Plan v1.0 (Pre-Approval) 11.07.2023
R0128 - Change Proposal Plan v1.0 (Approved) 18.07.2023
R0128 - Initial Assessment Report v1.0 (Approved) 18.07.2023
R0128 - Preliminary Change Report v1.0 (For Consultation) 27.07.2023
R0128 Consolidated Consultation Responses PUBLIC v1.0 08.09.23
R0128 - Final Change Report v2.0 (Post-Vote) 18.09.23
Company Name
RTS
Review status
Review required
Annulment Definition
Date of latest update
Type
Change
ID
R0119
Change Category
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
Annulments are defined in the interpretations schedule as: Annulled means that a Registration has been annulled by the Losing Supplier pursuant to an Annulment Request. “Annulment” and similar expressions shall be interpreted accordingly. Annulment Request means the Registration Service Request from the Losing Supplier to terminate the progress of a Registration in accordance with Paragraph 10 of the Registration Services Schedule. The Registration Services Schedule does not define an annulment but sets out in para 10: A Losing Supplier must only submit an Annulment Request in respect of a Registration where the Losing Supplier is permitted to do so in accordance with its Energy Supply Licence. Unfortunately the Energy Supply Licence does not refer to annulments, making this term not clearly defined. REC Performance Assurance (RPA) have identified Parties using annulments when they should use other processes. The lack of a clear definition of what an annulment is could be a contributing factor to this.
Change Plan
Preliminary Change Report and Consultation Issued
Completed
Start:
17 May 2023Due:
31 May 2024Completion:
31 May 2024Final Change Report Issued
Completed
Start:
31 May 2024Due:
05 Jul 2024Completion:
05 Jul 2024Responsible Committee Decision
Not Started
Start:
05 Jul 2024Due:
16 Jul 2024Completion:
Authority Determination Requested
Not Started
Start:
16 Jul 2024Due:
17 Jul 2024Completion:
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
08 November 2024
| Included changes | Affected REC Items | |
|---|---|---|
| R0105 | Review of ONAGE SLAs |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Extract: Schedule 23 - Registration Services (R0119 Draft Legal Text) - Published at PCR 31.05.2024
Archive
Off
Document title
Schedule 23 - Registration Services (R0119 Draft Legal Text) - Published at PCR 31.05.2024
Archive
Off
Document title
Schedule 1 - Interpretations and Definitions (R0119 Draft Legal Text) - Published at PCR 31.05.2024
Archive
Off
Document title
Schedule 1 - Interpretations and Definitions - R0119 (updated draft amendments at FCR) 05.07.2024
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (updated draft amendments at FCR) 05.07.2024
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (updated draft amendments at FCR) (Extract) 05.07.2024
Archive
Off
Document title
Schedule 1 - Interpretations and Definitions - R0119 (Recommended for Authority Approval) 16.07.2024
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (Recommended for Authority approval) 16.07.2024
Archive
Off
Document title
Schedule 23 - Registration Services - R0119 (Recommended for Authority approval) (Extract) 16.07.2024.docx
Archive
Off
Problem Statement
Parties are using annulments when they should use other processes, in particular the objection process. The lack of a clear definition of what an annulment is could be a contributing factor to this.
Stages Selection
SME
SME Role
Lead Assurance Analyst
R0119 - Change Proposal Form 17.05.2023
R0119 - Change Proposal Plan V1.0 (Approved)
R0119 - Initial Assessment Report V1.0 (Approved)
R0119 - Preliminary Change Report V1.0 (Published for Consultation) 31.05.2024
R0119 - Consolidated Consultation Responses V1.0 (25.06.2024)
R0119 - Final Change Report V2.0 (Post-Vote) 16.07.2024
R0119 - Authority Decision (10.09.2024)
Company Name
REC Code Manager
Review status
Review required
Supplier compensation for Network Party driven MPXN or GSP Group changes
Date of latest update
Type
Change
ID
R0112
Priority
Urgent
No
Latest Update
28/07/2023 - The Proposer has withdrawn R0112. This Change Proposal is open for adoption for 10 Working Days, after which time it will be fully withdrawn on the REC Portal. If you wish to adopt the Change Proposal, you can do this via the ‘Adopt Proposal’ button by 23:59 on 12 August 2023.
Summary
Empty
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Stages Selection
R0112 - CP Form (Downloadable Version)
Company Name
ScottishPower Energy Retail Ltd
Review status
Review required
Provision of Grid Supply Point Group ID from a Postcode search in EES
Date of latest update
Type
Change
ID
R0111
Change Category
Change Path
Priority
Urgent
No
Latest Update
05/04/2024 - The Code Manager has rejected the progression of R0111 as Postcode itself does not always have a direct correlation to the GSP Group and believes that a full address should be provided so that accurate quotes are given to a Consumer.
Summary
Empty
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
Date of Update to Priority
Solution Development
Stages Selection
R0111 - CP Form (Downloadable version)
Company Name
GB Group plc
Review status