This Change Proposal was implemented as part of the 7 November 2025 REC Release.
Summary
This change seeks to specify timezones within the ERDS Service Definition. For example: Data received by the ERDA shall be included within the ERDS Total Daily Processing on the basis that all data received prior to 23:00hrs is made available to the SMRA, EES Provider or CSS Provider (as applicable) by 06:00hrs the following Working Day. Data received after 23:00hrs will be made available to the SMRA, EES Provider or CSS Provider (as applicable) by the second Working Day
Proposer
Daniel Tadecicco
Change Plan

Change Proposal Plan and Impact Assessment Report Published

Completed

Start:

22 Aug 2022

Due:

18 Jun 2024

Completion:

18 Jun 2024

Change report and Consultation issued

Completed

Start:

18 Jun 2024

Due:

28 Jun 2024

Completion:

27 Jun 2024

Consultation closed

Completed

Start:

28 Jun 2024

Due:

19 Jul 2024

Completion:

19 Jul 2024

Responsible Committee decision

Completed

Start:

19 Jul 2024

Due:

28 Aug 2024

Completion:

28 Aug 2024

Appeal Window Closure

Not Started

Start:

28 Aug 2024

Due:

12 Sep 2024

Completion:

Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 07.11.2025_live
Included changes Affected REC Items
R0003 Market-wide Half-Hourly Settlement Implementation
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Supplier, I want to have confidence that the data in the systems is aligned and accurate.
  2. As ERDS Provider, I want to be able to provide accurate and appropriately labelled data that can be aligned with data from other systems.
Proposed Solution Document
Document title
R0060 Proposed legal text for decision 15.08.24.zip
Archive
Off
Document title
R0060 Proposed legal text 27.06.24
Archive
Off
Document title
R0060 Legal Text ERDS Service Definition v1.0 06.06.2024
Archive
Off
Document title
R0060 Approved legal text 28.08.24
Archive
Off
Problem Statement
The ERDS Service Definition does not specify the time with a specified time zone. This has led to some instances of MPRS close of day running at 22:00GMT instead of 23:00GMT. A confirmation of time zone is required within the ERDS Service Definition to negate any confusion or delays in flow processing and systems becoming misaligned.
SME
SME Role
Lead Assurance Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
R0060 - Change Proposal Form
R0060 Consolidated RFI Responses v1.0 (05.03.2024)
R0060 Change Proposal Plan (Approved) v1.0 18.06.2024
R0060 - Initial Assessment Report v1.0 (Approved) 18.06.2024
R0060 Preliminary Change Report v1.0 (For Consultation) 27.06.2024
R0060 Consolidated Consultation Responses v1.0 (15.08.24)
R0060 Change Report (Final Recommendation - Approved) v2.0
Company Name
St Clements Services
Review status
Review required

Maintenance of Qualification Schedule Change

Date of latest update
Type
Change
ID
R0059
Change Category
Change Path
Priority
Urgent
No
Latest Update
03/11/23 - This change was implemented on 03 November 2023 as part of the November 2023 REC Release
Summary
This change seeks to clarify, strengthen and simplify a number of requirements within REC Schedule 9 – Qualification and Maintenance.
Proposer
Georgina Scott-Picton
Change Plan

Solution Development

Completed

Start:

05 Aug 2022

Due:

01 Mar 2023

Completion:

01 Mar 2023

Impact Assessment Start

Completed

Start:

01 Mar 2023

Due:

10 Mar 2023

Completion:

10 Mar 2023

Impact Assessment End

Completed

Start:

10 Mar 2023

Due:

24 Mar 2023

Completion:

24 Mar 2023

Preliminary Change Report Issued

Completed

Start:

24 Mar 2023

Due:

14 Apr 2023

Completion:

14 Apr 2023

Responsible Committee Review

Completed

Start:

14 Apr 2023

Due:

25 Apr 2023

Completion:

25 Apr 2023

Consultation Start

Completed

Start:

25 Apr 2023

Due:

28 Apr 2023

Completion:

28 Apr 2023

Consultation End

Completed

Start:

28 Apr 2023

Due:

22 May 2023

Completion:

22 May 2023

Final Change Report Issued

Completed

Start:

22 May 2023

Due:

16 Jun 2023

Completion:

15 Jun 2023

Responsible Committee Decision

Completed

Start:

16 Jun 2023

Due:

27 Jun 2023

Completion:

27 Jun 2023

Appeal Window Closure

Not Started

Start:

27 Jun 2023

Due:

11 Jul 2023

Completion:

Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 03.11.2023_live

Documents

Name Version Last updated Actions
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
317 bytes
Version 1.0 - 08 Jun 2026 PDF - 317 bytes
1.0 08 Jun 2026
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Supplier, DNO, GT, MEM and REC Service User, I want to understand precisely what obligations apply to me under the Schedule 9 – Qualification and Maintenance, so that I can provide the required information to the Code Manager in a timely manner and be compliant.
  2. As the REC Code Manager, I want REC Parties and REC Service Users to have a clear understanding of the information they need to submit relating to the maintenance of their qualification, so that necessary information can be submitted for review and consideration in the most efficient way.
Proposed Solution Document
Document title
R0059 - Draft legal text for IA v1.0 10.03.2023
Archive
Off
Document title
R0059 - Draft legal text for Consultation v1.0 14.04.2023
Archive
Off
Document title
R0059 - Draft legal text for FCR v1.0 01.06.2023
Archive
Off
Document title
R0059 - Final approved draft legal text v1.0 27.06.2023
Archive
Off
Document title
EMAR Link - R0059 - Draft legal text for FCR v1.0 01.06.2023
Archive
Off
Problem Statement
REC Service Users are required to submit Maintenance of Qualification Annual Statements to the Code Manager, the requirements differ depending on the User category. The lack of clear obligations for REC Service Users surrounding the Maintenance of Qualification reporting, set out in Schedule 9 – Qualification and Maintenance results in missing or partially completed submissions. Considerable time is spent by the Code Manager requesting and following up on individual submissions.
R0059 - Change Proposal Form
R0059 - Change Proposal Plan v1.0 (Approved) 07.02.2023
R0059 - Initial Assessment Report v1.0 (Approved) 07.02.2023
R0059 - Impact Assessment Responses V1.0 14.04.2023
R0059 - Preliminary Change Report v1.0 (approved) 25.04.2023
R0059 - Consolidated Consultation Responses v1.0 23.05.2023
R0059 - Final Change Report v2.0 (post-vote) 27.06.23
Company Name
-
Review status
Review required

24/7 Emergency Metering Service

Date of latest update
Type
Change
ID
R0053
Change Category
Priority
Urgent
No
Latest Update
01/05/25 - Proposal withdrawn at proposers request.
Summary
This change has been raised to address the issue that Suppliers currently are not required to provide a 24/7 emergency metering service that enables a Consumer to speak to an agent and/or receive a visit from a field operative outside normal business hours when faced with power loss situation relating to a metering issue. This Change Proposal has been raised to assess and consider the options to address this issue.
Proposer
bryan.heap
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I want my metering fault to be identified and fixed as soon as possible, so that I am not left in a situation where I have no electricity for an extended period. I want to be able to contact the correct Party to fix my metering fault. I want my personal circumstances to be taken in to account when arranging for a fault to be fixed out of standard working hours.
  2. As a DNO, where there is a meter fault identified I want to be able to contact the Energy Supplier to rectify this, no matter what day or time this is identified, so that Consumers are not left without power for extended periods, during which time they may require ongoing help, support and communication. As an Energy Supplier, I want to provide my Customers with accurate and relevant Emergency contact information. As an Energy Supplier, I want to be able to respond to meter faults in a timely manner and not leave Consumers without power for an extended period.
  3. As a MEM, I want to be notified, in a timely manner, of faults that occur on Metering assets I am responsible for, so that I am able to rectify these without undue detriment being experienced by Consumers
Problem Statement
In situations where an Electricity Consumer experiences a loss of power, the DNOs who attend site to investigate and resolve the issues, are unable to do so when there is a meter issue, which is the responsibility of the Energy Supplier and it’s Appointed agents. When an issue occurs out of hours, or when an Energy Supplier does not have an out of hours metering service in operation, Consumers can be left without power for an extended period, this can create a safety or health concern, particularly for vulnerable Consumers or vulnerable members of their household.
Stages Selection
R0053 - Downloadable Change Proposal Form
R0053 - Change Proposal Plan v1.0 (pre-approval) 27/02/2023
R0053 - Initial Assessment Report v1.1 (Pre-Approval) 06.03.23
R0053 - Initial Assessment Report v2.0 (Approved) 07.03.2023
R0053 - Change Proposal Plan v2.0 (Approved) 07.03.2023
Company Name
Electricity North West Limited
Review status
Review required

Switch Request Objections (Change of Occupier)

Date of latest update
Type
Change
ID
R0051
Change Category
Change Path
Priority
Urgent
No
Latest Update
26/01/2024 - Withdrawn following adoption window closure.
Summary
This Change Proposal looks to clarity obligations regarding the losing suppliers' rights to object and the circumstances surrounding registrations by gaining suppliers, following the migration from the MRA to the REC.
Proposer
admin
Impacted Consumers
Impacted REC Services
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Stages Selection
R0051 - Downloadable CP form
Company Name
Business Energy Direct
Review status
Review required

Governance of Data under the REC (Alternative)

Date of latest update
Type
Change
ID
R0046A
Change Category
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Brian O�Shea
Change Plan

REC Party Impact Assessment Issued

Completed

Start:

26 May 2022

Due:

10 Jun 2022

Completion:

10 Jun 2022

Present Revised Change Proposal Plan to the REC Change Panel

Completed

Start:

10 Jun 2022

Due:

21 Jun 2022

Completion:

21 Jun 2022

Deadline for Alternative Change Proposal Plan

Completed

Start:

21 Jun 2022

Due:

08 Jul 2022

Completion:

08 Jul 2022

Preliminary Change Report Issued

Completed

Start:

08 Jul 2022

Due:

08 Jul 2022

Completion:

08 Jul 2022

Consultation Period Start

Completed

Start:

08 Jul 2022

Due:

08 Jul 2022

Completion:

08 Jul 2022

Consultation Period End

Completed

Start:

08 Jul 2022

Due:

15 Jul 2022

Completion:

15 Jul 2022

Final Change Report Issued

Completed

Start:

15 Jul 2022

Due:

21 Jul 2022

Completion:

21 Jul 2022

Responsible Committee Decision

Completed

Start:

21 Jul 2022

Due:

26 Jul 2022

Completion:

26 Jul 2022

Authority Determination

Completed

Start:

26 Jul 2022

Due:

02 Aug 2022

Completion:

01 Aug 2022
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 03.08.2022_live
Included changes Affected REC Items
R0103 Central provision of DCC Technical Contacts for requesting test certificates
  • Schedule 25 - Central Switching Service
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want to have the confidence that my data is being handled compliantly in accordance with the UK GDPR.
  2. As a REC Party, I want to achieve compliance and have clarification on my obligations in the context of REC Services.
  3. As a REC Party/Service User, I want to understand the reporting obligations I need to meet if the event of a Personal Data Breach relating to REC Data, to ensure that RECCo Board is made aware. As a REC Party/Service User, I need to understand that I will still need to independently assess and document my respective data protection roles under the REC. As a REC Party/Service User, I need to understand the roles and responsibilities of a Data Controller and/or Data Processor to be able to carry out my obligations under the REC.
Proposed Solution Document
Document title
R0046A - Updated legal text (Post-Consultation)
Archive
Off
Problem Statement
The current data protection and governance provisions in the REC are not fit for purpose, having the potential for ambiguity. Changes have been identified, following a legal review, which will provide more clarity for REC Parties who are Data Controllers and/or Data Processors, and to enable RECCo to maintain a comprehensive approach to the governance of data under the REC.
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
R0046A - Change Proposal Form
R0046A - Draft legal text submitted with the CP (May 2022)
R0046A - Initial Assessment Report v2.0 (Approved)
R0046A - Change Proposal Plan v4.0 (Approved)
R0046A - Consolidated Consultation Responses v1.0
R0046A Ofgem Decision letter
R0046 - Consolidated Impact Assessment Responses
R0046A - Preliminary Change Report v1.0 (Approved)
R0046A - Draft legal text (Post-Party IA)
R0046A - Final Change Report V2.0
Company Name
RECCo
Review status
Review required

Intellectual Property Rights and Services Data Main Body changes

Date of latest update
Type
Change
ID
R0049
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/11/2024 - This Change Proposal has been implemented as part of the November 2024 REC Release.
Summary
The Central Registration Services (CRS) intellectual property rights (IPR) provisions in the Code were drafted before designation of v1.0 of the Code and primarily seek to deal with the CRS Services IPR as if it were IPR developed and owned by the CRS Provider or its contractors. In reality, much of the solution is built upon third party-owned software or platforms/services that are available to the market. Notwithstanding certain concessions were drafted in Clause 13.5 of the Code at designation, the scope of CRS Service IPR refers to some now obsolete terms and concepts and ought to be amended to clarify what the CRS Provider actually owns or is responsible for, to alleviate the existing ambiguity. Potential to amend Clause 13 of the Code as proposed in the attached mark-up, with consequential amendments to the associated definitions in Schedule 1 (Interpretation and Definitions). The definition “User” should be deleted from the Code and the defined terms “CSS User” or “REC Service User” (as applicable) used in substitution.
Proposer
Cordelia Grey
Change Plan

Party Impact Assessment Published

Completed

Start:

20 May 2022

Due:

04 Jul 2024

Completion:

04 Jul 2024

Preliminary Change Report & Consultation Published

Completed

Start:

04 Jul 2024

Due:

08 Aug 2024

Completion:

08 Aug 2024

Consultation Closes

Completed

Start:

08 Aug 2024

Due:

30 Aug 2024

Completion:

30 Aug 2024

Final Change Report Issued

Completed

Start:

30 Aug 2024

Due:

10 Sep 2024

Completion:

10 Sep 2024

Responsible Committee Decision

Completed

Start:

10 Sep 2024

Due:

17 Sep 2024

Completion:

17 Sep 2024

Appeal Window Closure

Not Started

Start:

17 Sep 2024

Due:

01 Oct 2024

Completion:

Impacted Consumers
Status
Implementation Date
Status Live
EMAR Version 08.11.2024_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. N/A – No tangible Consumer impact identified.
  2. As a REC Participant (Service Provider/User), I want the Code to clearly stipulate IPR requirements, so that CRS provisions and arrangements are readily identifiable.
Proposed Solution Document
Document title
R0049-Draft REC Main Body Changes V1.0 04.07.24
Archive
Off
Problem Statement
There is uncertainty as to the scope of the various classes of Intellectual Property Rights (IPR) covered in Clause 13 of the REC Main Body (including the extent to which any IPR may exist in certain data, and the use of obsolete terms and concepts). As a result, there is a risk that the relevant industry stakeholders referred to in Clause 13 are unable to grant the licences and indemnities as described in that Clause. The current wording of Clause 5.3 of the REC Main Body requires amendments to ensure it correctly reflects the relationship between CRS Provider and RECCo, the services being provided and the entitlement to input VAT as a recipient of the CRS.
SME
SME Role
Lead Technical Analyst
SME User
caroline.milner@capgemini.com
SME Role
Lead Assurance Analyst
R0049 - Change Proposal Form
R0049 - Main Body amendments proposed by DCC
R0049 Change Proposal Plan (Approved) V1.0 03.07.24
R0049 Initial Assessment Report (Approved) V1.0 03.07.24
R0049 - Consolidated IA Responses V1.0 08.08.24
R0049 Change Report (Published for Consultation) V1.0 08.08.24
R0049 Consolidated Consultation Responses V1.0 02.09.24
R0049 Final Change Report (Approved) V2.0 17.09.24
Company Name
-
Review status
Review required

Metering Code of Practice Consolidation Review

Date of latest update
Type
Change
ID
R0047
Change Category
Change Path
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented on 01 April 2023
Summary
This Change Proposal seeks to consolidate the current Metering Codes of Practice into a single set of arrangements that are simplified, proportionate and relevant, which can be monitored via a single audit scheme.
Proposer
Aiyesha Andrade
Change Plan

Analysis and Solution Development

Completed

Start:

20 May 2022

Due:

28 Jul 2022

Completion:

28 Jul 2022

Impact Assessment Issued

Completed

Start:

28 Jul 2022

Due:

29 Jul 2022

Completion:

29 Jul 2022

Responsible Committee Review

Completed

Start:

02 Sep 2022

Due:

13 Sep 2022

Completion:

13 Sep 2022

Consultation Issued

Completed

Start:

13 Sep 2022

Due:

16 Sep 2022

Completion:

16 Sep 2022

Consultation Complete

Completed

Start:

16 Sep 2022

Due:

10 Oct 2022

Completion:

10 Oct 2022

Final Change Report Issued

Completed

Start:

10 Oct 2022

Due:

04 Nov 2022

Completion:

04 Nov 2022

Responsible Committee Decision

Completed

Start:

04 Nov 2022

Due:

15 Nov 2022

Completion:

15 Nov 2022

Preliminary Change Report publication

Completed

Start:

29 Jul 2022

Due:

02 Sep 2022

Completion:

02 Sep 2022
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 01.04.2023_live
Included changes Affected REC Items
R0100 Update to Error Handling Documents
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a DNO, MEM, AMI or MI, I want all CoP obligations to be clear and transparent, to ensure all obligations placed upon my organisation and operatives are understood and can be met in the most efficient way. As a MEM, AMI or MI, I want metering accreditation and audit activity to be streamlined and duplication removed, so that efficiency is increased, and unnecessary costs reduced.
  2. As RECCo, I want the metering scheme accreditation and audit arrangements to be managed and delivered in a cost efficient, effective and consistent approach, to ensure the arrangements deliver against the RECCo strategic aims.
  3. As an Energy Supplier, I want to be confident that my Appointed agents are compliant with all relevant CoP to ensure the safety of my Consumers.
Proposed Solution Document
Document title
R0047 Final Legal Text (Post Consultation)
Archive
Off
Document title
CoMCoP revisions (Post Consultation)
Archive
Off
Document title
CoMCoP Full v1.1 - Extended Clauses (04.10.22)
Archive
Off
Document title
Supporting information for Consultation (Extended obligations)
Archive
Off
Document title
Proposed Legal Text for Consultation (Redlined and Clean versions)
Archive
Off
Document title
RECCo Review - working documents
Archive
Off
Document title
Pre-Impact Assessment Proposed Solution (Excel)
Archive
Off
Document title
Pre-Impact Assessment Proposed Legal Text (Word)
Archive
Off
Problem Statement
The current metering arrangements, with separate Metering Codes of Practice, contains duplication and inefficiencies. There are currently four different auditors that undertake accreditation and audit activities across the different schemes. This could mean that a REC Party may require multiple separate accreditations and site audits, resulting in unnecessary operational impacts and costs.
R0047 - Change Proposal Form
R0047 - Change Proposal Plan v1.0 (Approved)
R0047 - Initial Assessment Report v1.0 (Approved)
R0047 - Consolidated Impact Assessment Responses
R0047 - Preliminary Change Report v2.1 (Approved)
R0047 - Consolidated consultation responses v1.0
R0047 - Final Change Report v2.0 (Post-Vote)
Company Name
RECCo
Review status
Review required

Governance of Data under the REC

Date of latest update
Type
Change
ID
R0046
Change Category
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
admin
Change Plan

REC Party Impact Assessment Issued

Completed

Start:

20 May 2022

Due:

10 Jun 2022

Completion:

10 Jun 2022

Present Revised Change Proposal Plan to the REC Change Panel

Completed

Start:

10 Jun 2022

Due:

21 Jun 2022

Completion:

21 Jun 2022

Consultation Period End

Not Started

Start:

21 Jun 2022

Due:

08 Jul 2022

Completion:

Final Change Report Issued

Not Started

Start:

08 Jul 2022

Due:

15 Jul 2022

Completion:

Responsible Committee Decision

Not Started

Start:

15 Jul 2022

Due:

19 Jul 2022

Completion:

Authority Determination

Not Started

Start:

19 Jul 2022

Due:

02 Aug 2022

Completion:

Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Jonathan Holland
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want to have the confidence that my data is being handled compliantly in accordance with the Data Protection Act 2018. As a REC Party, I want to achieve better compliance and have clarification on my obligations in the context of REC Services.
  2. As the CRS Service Provider, I need to ensure when submitting reporting data from the REC v3.0 Go-Live Date I meet the REC Obligations. As RECCo I want to have an approval role concerning additional uses of data beyond the provision of the CRS services, so that a comprehensive approach to the governance of data under the REC is maintained.
  3. As a REC Party/Service User, I want to understand the reporting obligations I need to meet if I have suffered a personal data breach, to ensure that RECCo Board is made aware. As a REC Party/Service User, I need to understand that I will still need to independently assess and document my respective data protection roles under the REC. As a REC Party/Service User, I need to understand the roles and responsibilities of a Data Controller and/or Data Processor to be able to carry out my obligations under the REC.
Problem Statement
The current data protection and governance provisions in the REC are not fit for purpose, having the potential for ambiguity. Changes have been identified, following legal review, to provide more clarity for REC Parties who are Data Controllers and/or Data Processors, and to enable RECCo to maintain a comprehensive approach to the governance of data under the REC.
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
rosalind.timperley
SME Role
Lead Assurance Analyst
R0046 - Draft legal text submitted with CP (May 2022)
R0046 - Change Proposal Form
R0046 - Initial Assessment Report v2.0 (Approved)
R0046 - Change Proposal Plan v3.0 (Approved)
Company Name
RECCo
Review status
Review required

MHHS Programme Changes required to Central Switching Service

Date of latest update
Type
Change
ID
R0044
Change Category
Urgent
Yes
Latest Update
22/09/25 - This Change Proposal has been implemented as part of the MHHS M8 22 September 2025 REC Release.
Summary
This change has been raised by the Market-wide Half-Hourly Settlement (MHHS) Programme to implement the necessary Retail Energy Code (REC) changes in relation to a new Data Communications Company User Role for the Meter Data Retrieval service (MDR). The new role required by the MHHS Target Operating Model will be established by the Smart Energy Code Modification Proposal, SEC MP162. This REC change will provide the new system interfaces required for sharing the MDR’s Registration Data.
Proposer
Jason Brogden
Change Plan

Analysis and Requirements Gathering started

Completed

Start:

29 Apr 2022

Due:

05 May 2022

Completion:

05 May 2022

Present Updated Change Proposal Plan to REC Change Panel

Completed

Start:

05 May 2022

Due:

21 Jun 2022

Completion:

21 Jun 2022

Service Provider Impact Assessment initiated

Completed

Start:

21 Jun 2022

Due:

11 Jul 2022

Completion:

05 Jul 2022

Service Provider Impact Assessment completed

Completed

Start:

11 Jul 2022

Due:

15 Aug 2022

Completion:

10 Aug 2022

Present extended Change Proposal Plan to Change Panel

Completed

Start:

15 Aug 2022

Due:

06 Sep 2022

Completion:

06 Sep 2022

Requirement refinement and validation of Detailed Impact Assessment

Completed

Start:

06 Sep 2022

Due:

27 Sep 2022

Completion:

27 Sep 2022

Provide extended Change Proposal Plan to Change Panel

Completed

Start:

28 Oct 2022

Due:

31 Oct 2022

Completion:

25 Oct 2022

Preliminary Change Report Issued

Completed

Start:

27 Sep 2022

Due:

28 Oct 2022

Completion:

27 Oct 2022

Responsible Committee Review of the Preliminary Change Report

Completed

Start:

31 Oct 2022

Due:

01 Nov 2022

Completion:

01 Nov 2022

Consultation started

Completed

Start:

01 Nov 2022

Due:

04 Nov 2022

Completion:

03 Nov 2022

Consultation ended

Completed

Start:

04 Nov 2022

Due:

25 Nov 2022

Completion:

25 Nov 2022

Final Change Report issued

Completed

Start:

25 Nov 2022

Due:

09 Dec 2022

Completion:

09 Dec 2022

Responsible Committee ex-committee decision

Completed

Start:

09 Dec 2022

Due:

13 Dec 2022

Completion:

13 Dec 2022

Authority Determination

Completed

Start:

13 Dec 2022

Due:

02 Feb 2023

Completion:

02 Feb 2023
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version _live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As the SMDSP, I want to be able to validate that an SMDR is registered so that I can provide them with access to the Metering Points to which they are registered.
  2. As a SMDR, I want to be able to access the Metering Points I am registered to so that I can collect settlement data from those meters
  3. As the CSS Provider, I want the CSS to be able to receive notifications from the Registration Service on the appointment/de-appointment of an SMDR so that I can send the appointment data to the SMDSP. As the CSS Provider, I want the CSS to be able to provide SMDR appointment data to the SMDSP.
Proposed Solution Document
Document title
R0044 - Draft Legal Text
Archive
Off
Document title
R0044 Final Legal Text (Post Consultation)
Archive
Off
Document title
Consultation page
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
The MHHS Target Operating Model requires that the appointment data of the Smart Meter Data Retriever (SMDR) is available to the Smart Meter Data Service Provider (SMDSP), so that the SMDSP can provide SMDRs with access to the Smart Meters at Metering Points they are registered to. Currently the new SMDR role and appointment data do not exist in, nor can they be made available from, CSS as this is a new industry operating model.
SME
SME Role
Lead Technical Analyst
R0044 - Change Proposal form v1.0
MHHSP-BP003A-CSSandDCC Update - v3.0
R0044 Change Proposal Plan v5.0 (Approved)
R0044 Initial Assessment Report v1.0 (Approved)
R0044 - Preliminary Change Report v1.0 (Approved)
R0044 - Consolidated Consultation Responses v1.0
R0044 - Final Change Report v2.0 (Post-Vote)
R0044 - Ofgem Decision
Company Name
MHHS Programme
Review status
Review required

Commissioning of Works by the Crowded Meter Room Coordinator (CMRC) to Resolve Issues In Crowded Meter Rooms

Date of latest update
Type
Change
ID
R0043
Change Category
Priority
Urgent
No
Latest Update
28/06/2024 - Change implemented as part of the June 2024 REC Release
Summary
This Change Proposal is to introduce new processes which will allow a Crowded Meter Room Co-ordinator (CMRC) to contract with a REC accredited Metering Equipment Manager (MEM) to act on behalf of the CMRC, so that they may resolve issues in a Crowded Meter Room (CMR) on behalf of all Registered Suppliers within that meter room. The MEMs undertaking this work on behalf of the CMRC will be referred to as the Crowded Meter Room MEM (CMRM).
Proposer
David Jones
Change Plan

Sandbox Decision

Completed

Start:

22 Apr 2022

Due:

29 Nov 2022

Completion:

29 Nov 2022

Sandbox Trial Commences

In Progress

Start:

29 Nov 2022

Due:

01 Feb 2023

Completion:

Impact Assessment Window

Completed

Start:

06 Jun 2023

Due:

09 Jun 2023

Completion:

09 Jun 2023

Present Extended Plan to Responsible Committee

Completed

Start:

01 Feb 2023

Due:

06 Jun 2023

Completion:

06 Jun 2023

Preliminary Change Report Published

Completed

Start:

09 Jun 2023

Due:

04 Aug 2023

Completion:

02 Aug 2023

Consultation Issued

Completed

Start:

04 Aug 2023

Due:

18 Aug 2023

Completion:

18 Aug 2023

Final Change Report Published

Completed

Start:

18 Aug 2023

Due:

08 Dec 2023

Completion:

10 Nov 2023

Responsible Committee Decision

Completed

Start:

08 Dec 2023

Due:

19 Dec 2023

Completion:

19 Dec 2023
Status
Implementation Date
Status Live
EMAR Version 28.06.2024_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer I want to be able to have a working Smart Meter that can communicate with my Energy Supplier so that I can receive the benefits of smart metering
  2. As a property owner I want to be able to have Smart Meters installed in my properties where there are currently issues with meter room space or other technical constraints preventing installation so that my tenants can access the benefits of having a Smart Meter. As a property owner I want a co-ordinated and managed process for resolving crowded meter room issues so that I am not contacted by or dealing with multiple Suppliers or metering agents for a single property.
  3. As an Energy Supplier, I need to be able to send and receive data, from the CMRC related to interference, faults, or damage to my equipment so that I can fulfil my obligations. As an Energy Supplier I need a coordinated approach to resolving the crowded meter room to enable me to meet my regulatory obligations related to Smart Meter installations and Communications. As an Energy Supplier, I want to know of CMR works being carried out so that I am informed of relevant updates regarding RMPs that I supply. In addition, I wish to be informed if the CMRM identifies any metering issues during their initial assessment or rectification works
  4. As a Distribution Network Operator, I need to be able to send and receive data, from the CMRC related to danger, interference, or damage to my equipment so that I can fulfil my obligations.
  5. As a MEM I need a co-ordinated approach to resolving the CMR issues, to enable me to install working Smart Meters on site.
Proposed Solution Document
Document title
R0043 - Solution Overview (10.11.2023)
Archive
Off
Document title
R0043 Legal Text (10.11.2023)
Archive
Off
Document title
R0043 Data Specification (22.03.2024)
Archive
Off
Problem Statement
For many Multiple Dwelling Units (MDU), Alt HAN Co equipment is required. This needs to be installed near to the electricity Smart Meter, connected to the tails of that Smart Meter, and requires at least one further device in the Consumer premises. However, the installation of HAN equipment can be inhibited by Crowded Meter Room (CMR) for the installation of alternative HAN and smart equipment. The objective of the CMR work is to leave a meter room ready for Energy Suppliers to proceed with their installations to meet their smart metering rollout obligations. Without the ability to install the alternative HAN wired bridge device in a CMR, Energy Suppliers will ultimately be unable to establish a HAN with the associated premises in the MDU
SME
SME Role
Lead Technical Analyst
DCP400 Crowded Meter Room Data Flows.pptx
DCP 400 Introduction to CMR.pptx
R0043 - Change Proposal Plan v5.0 (Approved)
R0043 - Initial Assessment Report v1.0 (Approved)
Alt HAN Co - Target Operating Model
R0043 FAQs v1.1 (08.11.2023)
Crowded Meter Room Pilot overview 14.07.2023
Non Confidential Consolidated Party Impact Assessment Responses
Preliminary Change Report (Approved) 15.08.2023
Crowded Meter Room Webinar 10.08.2023
R0043 - Non Confidential Consultation Response
R0043 Authority Decision
R0043 Final Change Report V2.1 (Approved)
Company Name
-
Review status
Review required