21/07/2026 - On 21 July 2026, the REC Change Panel voted to approve the Change Report (Proposal Plan) for I0325.
Summary
The REC was updated, primarily through R0209 and R0241, to add requirements that support the transition to, and enduring operation of the MHHS arrangements. As part of the transition, each impacted Metering Point will be migrated using processes defined in Codes, including the REC. Once this migration activity is complete, the legacy and transitional arrangements will become redundant and should be removed from the REC to support its efficient operation
Proposer
Jonny Moore
Change Report - Initial Assessment and Change Plan Report

Comments deadline
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Retention of redundant obligations within the REC would make it more complex to navigate for Market Participants and could cause confusion on the obligations that are in effect to support the efficient operation of the Great British Energy retail market. It is also worth noting that until Ofgem formally closes the MHHS Significant Code Review (SCR), this REC Issue could potentially impact that SCR.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0325 submission form
I0325 Scope list
Company Name
-
Review status
Review required

Tariff Interoperability Phase 1a – Supplier Performance Assurance Requirements

Date of latest update
Type
Change
ID
R0323
Change Category
Change Path
Priority
Urgent
No
Latest Update
13/08/2026 - Consultation opened for responses until 23:59 on 07/09/2026
Summary
Obligations are being introduced into the REC to require Suppliers to make Tariff Pricing Data available to Tariff Interoperability Users (TI Users) using a new Tariff Interoperability Application Programming Interface (TI API). This proposal will provide Code Manager with data to assure supplier performance against obligations in a new REC Schedule: Tariff Interoperability Arrangements.
Proposer
Andrew Wallace
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 27.02.2027_live
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Date of Update to Priority
Solution Development
SME
SME Role
Lead Technical Analyst
I0323 submission form
I0323 - REC Prioritisation Matrix
I0323 Change Report (Proposal Plan) Approved
R0323 Legal Drafting
I0323 Party IA Request
I0323 Consolidated Party IA Responses NON-CONFIDENTIAL
Company Name
-
Review status
Review required

DNOs Create Export MPANs after approving G98/99 commissioning documents

Date of latest update
Type
Change
ID
R0321
Change Category
Change Path
Priority
Urgent
No
Latest Update
20/08/2026 - the consultation is open, responses must be received by 23:59 14 September 2026.
Summary
The creation of Import Metering Points for new Premises sits with the Distribution Network Operator (DNO), while the Export Metering Points generally sit with the Electricity Supplier. When the DNO approves the G98 Engineering Recommendation Installation Document (Form B) or G99 Engineering Recommendation Installation Document (Form A3-1 or A3-2) under the Distribution Code, they could create Export Metering Points at this time (with the logical Disconnection process being available for any Export Metering Points that are then not required).
Proposer
Ben Atkinson
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 25.06.2027_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Schedule 27 RMP lifecycle draft V0.1
Archive
Off
Document title
Schedule 27 RMP lifecycle draft V0.2
Archive
Off
Problem Statement
The information required by the DNO to create an Export Metering Point sits with the Consumer rather than the Electricity Supplier, and leads to the Electricity Supplier acting as an unnecessary third party in the process. This is leading to unnecessary time being added to the process, negatively impacting Consumers and the journey to Net Zero. This is particularly apparent for large new housing developments, which may have several tens of thousands of Export Metering Points to create with the same DNO and require the use of the Bulk Request process. This process is cumbersome and has no two DNOs operating the process in the same way.
SME
SME Role
Lead Assurance Analyst
R0321 submission form
R0321 Change Report (Proposal Plan) Approved 05.05.26
R0321 Consolidated Impact Assessment Responses v1.0 PUBLIC
R0321 Update to Plan V1.0 approved 18.08.26
R0321 Change Report (For Consultation) approved 18.08.26
Company Name
-
Review status
Review required

Introduction of Consumer Consent Solution

Date of latest update
Type
Issue
ID
I0318
Change Category
Priority
Urgent
No
Latest Update
22/04/2026 - The Change Report (Proposal Plan) was approved by Change Panel on 21/04/2026.
Summary
This initiative will support the transformation of how energy is managed and consumed by giving consumers control over their energy (gas, electricity, heat, or other) data, enabling innovation through third-party services, and advancing sustainability goals. This REC Issue is being raised to promote visibility and awareness of opportunities for engagement, in advance of the CCS Change Proposal being progressed.
Proposer
consumerconsent
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
RECCo | Consumer Consent Programme page
Archive
Off
Document title
Consumer Consent Hub - REC Portal
Archive
Off
Document title
Consumer Consent Solution Design Consultation (March 2026)
Archive
Off
Document title
RECCo's response to the CCS Design Consultation - 28 May 2026
Archive
Off
Problem Statement
A new set of arrangements for a Consumer Consent Solution (CCS) is currently being developed under the RECCo CCS project. The new arrangements will need to be implemented within the REC so that they can be governed under the REC on an enduring basis.
I0318 submission form
RECCHIG_26_0305 - I0318 Consumer Consent Solution
I0318 Change Report (Proposal Plan) v1.0 APPROVED 02.04.2026
Company Name
-
Review status
Review required

Clarification of Data Items within the Payment Method Levelisation Supplier Data Reporting Specification

Date of latest update
Type
Change
ID
R0316
Change Category
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
The definition of certain data items within the PML schedule is currently ambiguous and open to misinterpretation by Suppliers, which may result in inconsistent data submissions and a consequential variation in the allocation of scheme debits and credits.
Proposer
Jenny Bridges
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 26.06.2026_live
Included changes Affected REC Items
R0103 Central provision of DCC Technical Contacts for requesting test certificates
  • Schedule 25 - Central Switching Service
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0316 Legal Text For Consultation
Archive
Off
Document title
CODE_YYYYMM[_x]
Archive
Off
Problem Statement
There is a lack of clarity in REC Schedule 31 – Payment Method Levelisation Reconciliation around the definition of Primary Meter Points, which has led to inconsistent data submission and consequential variation in the allocation of PML scheme debits and credits.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0316 submission form
R0316 Guidance for Suppliers
R0316 Change Report (Proposal Plan and Consultation)
R0316 Consolidated Consultation Responses V1.0 (26.03.2026)
R0316 Change Report (Final Recommendation) v1.0 Approved 07.04.2026
R0316 Authority Decision
Company Name
-
Review status
Review required

Crossed Meters Process: Clarifications and Support

Date of latest update
Type
Issue
ID
I0314
Change Category
Change Path
Priority
Urgent
No
Latest Update
12/05/2026 - The Information Request has closed. The Code Manager is curently assessing the responses
Summary
This issue seeks to solve is the gap between the documented REC Crossed Meters process and how it is being applied operationally. The aim is to ensure all parties fully understand the process, apply it consistently, and have the support necessary to achieve timely, correct resolution of Crossed Meter cases.
Proposer
James Hardy
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Date of Update to Priority
Solution Development
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0314 submission form
I0314 Change Report (Proposal Plan) Approved 21.04.26
Company Name
-
Review status
Review required

Review of export meter work arrangements

Date of latest update
Type
Issue
ID
I0312
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
28/05/2026 The Code Manager has set up an I0312 Working Group to engage with Industry Parties on solution development. The next session will be held on Wednesday, 03 June 2026. To register your interest, please email change.management@recmanager.co.uk
Summary
The REC Metering Operations Schedule has limited distinction between the activities for import and export metering. These provisions were not specifically developed to support a market with high volumes of small-scale microgeneration with shared metering assets for import and export.
Proposer
Jon Hawkins
Status
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
There is a lack of distinction within REC Schedule 14 – Metering Operations between activities for Import and Export Metering, and how to manage work arrangements where is a shared Metering Asset between Import and Export Suppliers.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0312 submission form
I0312 Change Report (Proposal Plan) v1.0 Approved 21.04.26
Company Name
-
Review status
Review required

REC Change to Align with DCP467 Asset Condition Reporting

Date of latest update
Type
Change
ID
R0306
Change Category
Change Path
Priority
Urgent
No
Latest Update
08/07/2026 - the Metering Expert Panel approved the Update to Plan.
Summary
DCUSA change DCP467 has been raised to propose that Category A and B defects reported currently using the Asset Condition Report (D0135) or phone call to the DNO, should instead be reported via an online reporting tool where the DNO has one available. This is expected to have impacts to the REC.
Proposer
Caroline Freimuller
Status
Implementation Date
Status Live
EMAR Version 06.11.2026_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
I0306 STIRG Guidance Document draft V0.1
Archive
Off
Document title
I0306 Data Spec changes v0.1
Archive
Off
Document title
R0306 STIRG Guidance Document draft V0.2
Archive
Off
Document title
R0306 Data Spec changes V0.2
Archive
Off
Problem Statement
Where DNOs have enhanced reporting tools for Category A or Category B situations, it is not mandatory for Parties to submit reports using this method. This may lead to a detrimental Consumer experience, as it is limited what information can be provided over the telephone or via Market Message (e.g. it is not possible to provide photographs of the situation).
I0306 submission form
I0306 Change Report (Proposal Plan) V1.0 approved 03.02.26
I0306 Consolidated Impact Assessment Responses V1.0
R0306 Change Report (For Consultation) V1.1
R0306 Consolidated Consultation Responses v1.1 PUBLIC
R0306 Change Proposal Re-Plan v1.0 approved 08.07.26
Company Name
-
Review status
Review required

Potential Consumer detriment for Smart Economy 7

Date of latest update
Type
Issue
ID
I0303
Urgent
No
Latest Update
09/04/2026 Following a review of responses to the joint information request on REC Issues I0273 - Sharing of SSC and TPR Information for MHHS Smart and Advanced Meters and I0303 - Potential Consumer detriment for Smart Economy 7, the Code Manager has determined that the scope of REC Issue I0303 can be considered as part of the solution development for REC Issue I0273. I0303 has now been classed as resolved and will not be progressed further as a separate Issue. For further engagement with this issue, please refer to I0273 directly.
Summary
There is a potential for Consumer detriment under the Market-wide Half Hourly Settlement arrangements where a customer unknowingly selects a tariff (i.e. single rate) where they have an Economy 7 type configuration on a Smart meter for water/storage heating.
Proposer
rebecca.bennett
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Date of Update to Priority
Solution Development
Problem Statement
There is a potential for Consumer detriment under the Market-wide Half Hourly Settlement arrangements where a customer unknowingly selects a tariff (i.e. single rate) where they have an Economy 7 type configuration on a Smart meter for water/storage heating. A solution is required that enables a Supplier to identify a Smart E7 Consumer during the Switch process to ensure they can offer the correct tariff and prevent consumer detriment.
I0303 submission form
Company Name
-
Review status
Review required

Amendments to D0312 to align with BSC CP1622

Date of latest update
Type
Change
ID
R0300
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
Elexon have raised CP1622 to amend the Validation rules within the Supplier Meter Registration Service (SMRS) for the Number of Register Digits Data Item within the IF-005 Market Message, to allow digit values from 1–9, ensuring accurate data and reducing exceptions. There are no Validation rules related to the D0312 Market Message which need to be amended under the Balancing and Settlement Code (BSC), but the D0312 itself contains a Data Item Rule regarding the Number of Displayed Register Digits which needs to be amended in line with CP1622.
Proposer
Caroline Freimuller
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 26.06.2026_live
Included changes Affected REC Items
R0103 Central provision of DCC Technical Contacts for requesting test certificates
  • Schedule 25 - Central Switching Service
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Amendments to D0312 red-lined data spec V0.1
Archive
Off
Document title
Amendments to D0312 red-lined data spec V0.2
Archive
Off
Document title
20260205 CP1622 R0300 industry workshop slides
Archive
Off
Problem Statement
BSC CP1622 is looking to address that SMRS cannot accurately update the Number of Displayed Register Digits for a SMETS2 Smart Electricity Meter due to Validation rules currently in place. The Validation rules proposed to be amended are those on the IF-005, which has direct impacts to the D0312.
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
R0300 submission form
R0300 Change Report (Proposal Plan) V1.0
R0300 Consolidated Impact Assessment Responses PUBLIC v1.0
R0300 Update to Plan V1.0 approved 19.03.26
R0300 Change Report (For Consultation) V1.1
R0300 Consolidated Consultation Responses V1.0
R0300 Change Report (Final Recommendation) V1.0 approved 29.04.26
Company Name
-
Review status
Review required