Improved Validation for DI51599 - Electricity Smart Meter Equipment (ESME ID)
Date of latest update
Type
Issue
ID
I0341
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
13/08/2026 - accepted in by Code Manager
Summary
A DNO has raised an issue with the ESME ID data stored in MPRS. Some of the ESMEs are passing MPRS basic validation but are being rejected by the proposed Metering Service preventing a change of service.
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Date of Update to Priority
Solution Development
Stages Selection
Stages Selection
I0341 submission form
Company Name
-
Review status
Review required
Introduction of Sweet Treat Reward System
Date of latest update
Type
Change
ID
R9999
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
Yes
Latest Update
Consultation issued June 29th
Summary
This proposal introduces a formalised “Sweet Treat Reward System” within the REC governance framework, whereby participants are recognised with confectionery based incentives for timely delivery, high quality submissions, and proactive engagement in the change process. The change aims to improve stakeholder participation, reduce consultation fatigue, and enhance overall delivery performance by introducing a light-touch behavioural incentive aligned to existing governance activities.
Impact Status
Alternative Change Proposals
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Version 4.2.0 - 27 Mar 2027.
| Included changes | Affected REC Items | |
|---|---|---|
| R0002 | Review of Data Specification Category in REC Baseline Statement | |
| R0136 | Change to REC Schedule 22 Market Stabilisation Charge (MSC) |
Documents
| Name | Version | Last updated | Actions |
|---|---|---|---|
| 1.0 | 08 Jun 2026 |
Implementation Status
Date Raised
Fuel
REC Decision Maker
Linked to SDS Delivery
No
Date of Update to Priority
Solution Development
Proposed solution summary
The proposed solution is to introduce a new REC provision establishing a “Sweet Treat Reward System” (STRS), creating a light-touch, non-financial incentive mechanism linked to existing change process activities. This would require updates to REC governance documentation (e.g. Change Management schedule and supporting guidance) to define eligibility criteria, reward thresholds, and roles, with the Code Manager responsible for administering and maintaining the scheme and recording outcomes within the REC Portal.
End-to-end, the solution would operate by linking stakeholder behaviours (e.g. timely consultation responses, active participation in CIG discussions, and high-quality submissions) to predefined reward triggers. The REC Portal would be enhanced to capture participation metrics, calculate eligibility, and notify participants of earned rewards via automated communications (e.g. portal notifications or email), with a monthly or milestone-based cadence. Data flows would include submission timestamps, attendance records, and qualitative assessment inputs from the Code Manager or Change Leads, which would be consolidated into a “Reward Eligibility Log” maintained within REC systems.
Implementation would be led by the Code Manager, supported by the DSP for system changes and reporting capability, and overseen by REC governance bodies to ensure alignment with existing obligations and neutrality principles. The solution would not alter core decision-making processes but would overlay an engagement-focused mechanism, with clear accountability for administration, auditability of outcomes, and periodic review to ensure continued effectiveness and proportionality.
Problem Statement
The REC change process currently relies on formal obligations and voluntary participation to secure stakeholder engagement; however, this approach does not consistently drive timely, high-quality input during key stages such as consultations and working groups. As a result, participation can be delayed, inconsistent, or limited in substance, reducing the effectiveness of impact assessments and slowing overall change delivery.
In the absence of any positive reinforcement mechanisms, the process places full reliance on compliance rather than motivation, which may not fully reflect the human factors influencing engagement. This creates a persistent gap between the intended collaborative nature of the REC and the reality of stakeholder behaviour, ultimately affecting the pace and quality of change outcomes delivered to the market.
In the absence of any positive reinforcement mechanisms, the process places full reliance on compliance rather than motivation, which may not fully reflect the human factors influencing engagement. This creates a persistent gap between the intended collaborative nature of the REC and the reality of stakeholder behaviour, ultimately affecting the pace and quality of change outcomes delivered to the market.
Stages Selection
Workgroup
Workgroup(s)
Review status
Reviewed - Accepted
Tariff Interoperability Phase 1a – Supplier Performance Assurance Requirements
Date of latest update
Type
Change
ID
R0323
Change Category
Change Path
Priority
Urgent
No
Latest Update
13/08/2026 - Consultation opened for responses until 23:59 on 07/09/2026
Summary
Obligations are being introduced into the REC to require Suppliers to make Tariff Pricing Data available to Tariff Interoperability Users (TI Users) using a new Tariff Interoperability Application Programming Interface (TI API). This proposal will provide Code Manager with data to assure supplier performance against obligations in a new REC Schedule: Tariff Interoperability Arrangements.
Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2027
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Stages Selection
SME
SME Role
Lead Technical Analyst
I0323 submission form
I0323 - REC Prioritisation Matrix
I0323 Change Report (Proposal Plan) Approved
R0323 Legal Drafting
I0323 Party IA Request
I0323 Consolidated Party IA Responses NON-CONFIDENTIAL
Company Name
-
Review status
Review required
Introduction of Consumer Consent Solution
Date of latest update
Type
Issue
ID
I0318
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
22/04/2026 - The Change Report (Proposal Plan) was approved by Change Panel on 21/04/2026.
Summary
This initiative will support the transformation of how energy is managed and consumed by giving consumers control over their energy (gas, electricity, heat, or other) data, enabling innovation through third-party services, and advancing sustainability goals. This REC Issue is being raised to promote visibility and awareness of opportunities for engagement, in advance of the CCS Change Proposal being progressed.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
RECCo | Consumer Consent Programme page
Archive
Off
Document title
Consumer Consent Hub - REC Portal
Archive
Off
Document title
Consumer Consent Solution Design Consultation (March 2026)
Archive
Off
Document title
RECCo's response to the CCS Design Consultation - 28 May 2026
Archive
Off
Problem Statement
A new set of arrangements for a Consumer Consent Solution (CCS) is currently being developed under the RECCo CCS project. The new arrangements will need to be implemented within the REC so that they can be governed under the REC on an enduring basis.
Stages Selection
Stages Selection
I0318 submission form
RECCHIG_26_0305 - I0318 Consumer Consent Solution
I0318 Change Report (Proposal Plan) v1.0 APPROVED 02.04.2026
Company Name
-
Review status
Review required
Meter Manufacturers Make and Type not Populated in SMRS
Date of latest update
Type
Issue
ID
I0297
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
An Update to Plan has been approved by the REC Technical Expert Panel on 25 June 2026.
Summary
The Meter Manufacturers Make and Type (J0410 / DI-048) was not populated as part of the MHHS Programme's data cleanse. However it is part of the SMRS maintained Meter Technical Details (MTDs) for Smart Meters which replace the DTC MTD Market Messages for Smart Meters in the MHHS environment. It is not currently possible to populate this item in the legacy arrangements.
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
Following MHHS Migration, the MTDs provided by SMRS do not include the Meter Manufacturers Make and Type, as this replaces the existing D0149/D0150 Market Messages it could lead to the information being lost. This will mean Energy Suppliers and MOAs will not know the make and type of meter installed at a particular Site.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME Role
Lead Assurance Analyst
I0297 submission form
I0297 Change Report (Proposal Plan) V1.0
I0297 Update to plan
I0297 Legal Drafting
Company Name
-
Review status
Review required
Review of Schedule 1 Interpretations and Definitions
Date of latest update
Type
Change
ID
R0291
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the June 2026 REC Release.
Summary
During the quality checks of REC Schedules for MHHS, several capitalised terms throughout schedules were identified with no entry in Schedule 1. It has also been identified that there are definitions that link to Schedules (such as 2, 20 and 21) which are no longer live REC Schedules. The Code Manager has reviewed these and determined some changes are required to Schedule 1.
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Status
Implementation Date
26 June 2026
| Included changes | Affected REC Items | |
|---|---|---|
| R0103 | Central provision of DCC Technical Contacts for requesting test certificates |
|
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0291 REC Main Body draft V0.1
Archive
Off
Document title
R0291 Schedule 1 draft V0.1
Archive
Off
Document title
R0291 Schedule 25 (CSS) draft V0.1
Archive
Off
Document title
R0291 Schedule 1 draft V0.2
Archive
Off
Document title
R0291 REC Main Body draft V0.1
Archive
Off
Document title
R0291 Schedule 25 (CSS) draft V0.1
Archive
Off
Problem Statement
Without clear definitions of all defined terms within the REC, there may be confusion for REC Parties and other industry participants who use REC documents.
Stages Selection
I0291 submission form
I0291 Change Report (Proposal Plan) V1.0
R0291 Change Report (For Consultation) V1.0
R0291 Consolidated Consultation Responses v1.0
R0291 Change Report (Final Recommendation) V1.1 approved 21.04.26
Company Name
-
Review status
Review required
Missing Scenario Variant from R0043
Date of latest update
Type
Change
ID
R0242
Change Category
Change Path
Priority
Urgent
No
Latest Update
This Change Proposal has been implemented as part of the February 2026 REC Release.
Summary
There is a missing scenario variant from the introduction of R0043 – Schedule 14 Metering Operations states the Crowded Meter Room MOA (CMRM) should send a D0139 to the Supplier and DNO but the scenario variant of CMRM to DNO is missing.
Change Plan
Proposal Plan approved at Change Panel
Completed
Start:
Due:
Completion:
18 Mar 2025Final vote at Technical Expert Panel
Completed
Start:
Due:
Completion:
25 Jun 2025Impacted REC Parties and Market Participants
Status
Implementation Date
27 February 2026
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
CMRMs currently cannot send all the Market Messages required of them in Schedule 14 Metering Operations.
Stages Selection
Change Proposal form
R0242 Change Report (Proposal Plan) V1.0 Approved 18.03.25
R0242 Consolidated Impact Assessment Responses
R0242 Change Report (For Consultation) V1.0
R0242 Consolidated Consultation Responses v1.0
R0242 Change Report (Final Recommendation) V1.0 approved 25.06.25
Company Name
-
Review status
Review required
D0303 flow following MHHS design changes
Date of latest update
Type
Issue
ID
I0230
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
29/04/2026 - This Issue has been withdrawn by the Proposer, as there was not a strong preference amongst MAPs of which temporary solution option (if any) should be progressed. Many MAPs already have workarounds in place, and a permanent solution is expected to be progressed in the future through a joint REC / BSC change. The adoption window has closed.
Summary
As part of Market Wide Half Hourly Settlement (MHHS) design, the requirement to provide Data Item Effective from Settlement Date {REGI} (J0049 / DI50025) in the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message (D0303 / MM00240) has been changed from mandatory to optional. This means Meter Asset Providers (MAP) may not receive it.
Change Plan
Change Report (Proposal Plan) approved at Change Panel
Completed
Start:
Due:
Completion:
04 Nov 2025Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Problem Statement
The Effective from Settlement Date {REGI} Data Item being optional rather than mandatory inside the Notification of Meter Operator, Supplier and Metering Assets installed / removed by the MOP to the MAP Market Message means that MAPs may not receive this information required for billing purposes.
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
Issue Proposal Form
I0230 Change Report (Proposal Plan) V1.0 approved 04.11.25
I0230 and I0261 Solution Development Report V1.0
I0230 I0261 Q&A session V1.0
I0230 and I0261 Consolidated IR Responses PUBLIC V1.0
Company Name
-
Review status
Review required
Stranded RMPs in Defunct Suppliers
Date of latest update
Type
Issue
ID
I0219
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
27/02/2025 - Change is now not being merged into any other changes and will proceed as a standalone change. A potential solution has been identified, but will be discussed for potential cross code impacts
Summary
Currently within Schedule 23 a Registration can only be undertaken on RMPs with an Operational or Dormant RMP Status, and not Terminated. Terminated is a status that the RMP is set to when the Meter Point Status is no longer operational or the site is isolated. It is right that these sites are not able to be Registered as there is a risk that Suppliers could inadvertently Register such Meter Points. We do have instances where such sites are stranded in defunct Supplier portfolios - and the Supplier no longer has the capability to take the relevant action to Deactivate the Registrations. This may because the operational staff have left and the business is in administration.
Change Plan
Discussed at Technical Change Workshop
Completed
Start:
Due:
Completion:
25 Feb 2025Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Status
Implementation Status
Date Raised
Fuel
Date of Update to Priority
Solution Development
Stages Selection
Stages Selection
SME
SME Role
Lead Technical Analyst
SME User
maxime.van-eyseren@capgemini.com
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
Issue Proposal Form
Company Name
Xoserve
Review status
Review required
Introducing Third Party Intermediary (energy broker) assurance and accreditation (Alternate)
Date of latest update
Type
Change
ID
R0137A
Change Category
Urgent
No
Latest Update
16/05/2025 - the Authority have published their decision to reject R0137 and R0137A.
Summary
This change seeks to expand the obligation for Energy Suppliers to only work with TPIs who are adhering to principles as set out in the REC TPI Code of Practice to all Non-Domestic Consumers. It also looks to reduce the burden on Energy Suppliers having to perform their own audits by introducing a REC Services Accreditation Scheme and allowing companies to qualify as an Industry-Recognised Accreditation Body.
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Status
Date Raised
Fuel
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
Legal Text R0137A Consultation
Archive
Off
Document title
Legal Text for R0137A - Final
Archive
Off
Problem Statement
Non-Domestic Consumers have more limited protections than Domestic and Microbusiness Consumers in the energy market, and so may not always experience best practice from all parties they interact with. The aim is to expand these protections while limiting the audit burdens on Suppliers and TPIs.
Stages Selection
SME
SME Role
Lead Assurance Analyst
SME User
amoden@deloitte.co.uk
R0137A Change Proposal Form
Authority decision on REC modification proposal R0137 and R0137A
Company Name
REC Code Manager
Review status
Review required