Prepayment Credit Balance Transfer Process

Date of latest update
Type
Change
ID
R0037
Change Category
Other Industry Codes impacted
Priority
Urgent
No
Latest Update
04/08/2026 - On 04 August 2026, the REC Change Panel approved this Proposal Plan.
Summary
This Change Proposal seeks to develop an agile, efficient, Consumer-centric solution for the transfer of credit balance as part of a smart prepayment Switch.
Proposer
Simon Bevis
Change Plan

Initial Analysis

Completed

Start:

10 Mar 2022

Due:

30 Jun 2022

Completion:

Present updated Change Proposal Plan to Change Panel

Completed

Start:

30 Jun 2022

Due:

19 Jul 2022

Completion:

Solution Development Complete

Completed

Start:

30 Jan 2023

Due:

29 Feb 2024

Completion:

29 Feb 2024

Present Updated Change Proposal Plan to Change Panel

Completed

Start:

19 Jul 2022

Due:

08 Nov 2022

Completion:

Present Updated Plan to Change Panel

Completed

Start:

08 Nov 2022

Due:

17 Jan 2023

Completion:

17 Jan 2023

Service Provider Impact Assessment

Completed

Start:

17 Jan 2023

Due:

30 Jan 2023

Completion:

30 Jan 2023
Impacted Consumers
Impacted REC Services
Impacted REC Parties and Market Participants
Implementation Status
Date Raised
Fuel
REC Decision Maker
Lead Analyst
florentina.monea
Date of Update to Priority
Solution Development
Proposed Solution Document
Document title
R0037 - Draft Legal Text v1.0
Archive
Off
Document title
R0037 - Solution Document v2.0
Archive
Off
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
SME Role
Lead Assurance Analyst
SME User
vaishnsharma@deloitte.co.uk
R0037 - CP Form (Downloadable version)
R0037 Consolidated Party IA Responses PUBLIC v1.0
R0037 - Change Proposal Plan V6.0 (Approved) 05.03.24
R0037 - Initial Assessment Report v1.0 (Approved) 06.04.22
R0037 Consolidated RFI Responses PUBLIC v1.0
R0037 Change Report (Proposal Plan) Approved
Company Name
Utilita Energy Limited
Review status
Review required

Market Stabilisation Charge – Administration

Date of latest update
Type
Change
ID
R0035
Change Category
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Jon Dixon
Change Plan

Party Impact Assessment initiated

Completed

Start:

22 Feb 2022

Due:

08 Apr 2022

Completion:

08 Apr 2022

Party Impact Assessment completed

Completed

Start:

08 Apr 2022

Due:

29 Apr 2022

Completion:

29 Apr 2022

Preliminary Change Report issued

Completed

Start:

29 Apr 2022

Due:

06 May 2022

Completion:

06 May 2022

Issued to Responsible Committee for review (ex-Committee)

Completed

Start:

06 May 2022

Due:

10 May 2022

Completion:

10 May 2022

Consultation initiated

Completed

Start:

10 May 2022

Due:

13 May 2022

Completion:

13 May 2022

Consultation completed

Completed

Start:

13 May 2022

Due:

01 Jun 2022

Completion:

01 Jun 2022

Final Change Report issued

Completed

Start:

01 Jun 2022

Due:

10 Jun 2022

Completion:

10 Jun 2022

Responsible Committee Decision (ex-Committee)

Completed

Start:

10 Jun 2022

Due:

14 Jun 2022

Completion:

14 Jun 2022

Authority Determination

Completed

Start:

14 Jun 2022

Due:

24 Jun 2022

Completion:

27 Jun 2022
Impacted Consumers
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 30.06.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Domestic Consumer, I want to be able to choose my Energy Supplier and a tariff from a range of competitive options, so that I can take advantage of cheaper deals as they become available.
  2. As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the MSC obligations, so that the new MSC licence obligations on Energy Suppliers can be effectively discharged by RECCo.
  3. As RECCo, I want the Retail Energy Code to specify my obligations, governance and charging mechanisms, so that I can effectively discharge obligations imposed by the Authority through the Licence Condition modification.
  4. As a Domestic Supplier, I want to understand how RECCo will calculate my credits and liabilities and when they will send my invoices/credit notes, so that I can plan to review my invoices/credit notes prior to the receipt of monies owed or payments I make to RECCo or at an appropriate time for my organisation. As a Domestic Supplier, I want to understand how I could dispute an invoice which I do not believe is accurate, so that I am able to raise a dispute/challenge compliantly
Proposed Solution Document
Document title
Legal Text (tracked changes)
Archive
Off
Document title
EMAR Change Set
Archive
Off
Problem Statement
Following the publication of Ofgem’s decision on potential short-term interventions to address risks to consumers from market volatility, the Market Stabilisation Charge will be introduced via the modified Standard Licence Condition 24A and introduced into the REC by Change Proposal R0034. A change is needed to the REC to set out the charging and payment mechanism, and to introduce the necessary governance arrangements to allow these MSC payments to be administered by RECCo.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
R0035 - CP Form (Downloadable version)
Ofgem Decision document - Short Term Interventions
MSC calculation guidance
Gas SLC Modified Decision Notice
Elec SLC Modified Decision Notice
R0035 - High level Solution Overview v1.0
R0035 - Change Proposal Plan v2.0 (Approved)
R0035 - Initial Assessment Report v2.0 (Approved)
R0035 - Consolidated IA responses v1.0
R0035 - Proposed Solution v2.0
R0035 - Preliminary Change Report v2.0 (Approved)
R0035 - Consolidated consultation responses v1.0
R0035 - Final Change Report v2.0 (Post-Vote)
Authority Decision for R0035
Company Name
RECCo
Review status
Review required

Market Stabilisation Charge

Date of latest update
Type
Change
ID
R0034
Change Category
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Henry Kemp
Change Plan

Preliminary Change Report issued

Completed

Start:

21 Feb 2022

Due:

04 Mar 2022

Completion:

04 Mar 2022

Consultation issued (5 WD)

Completed

Start:

04 Mar 2022

Due:

04 Mar 2022

Completion:

04 Mar 2022

Final Change Report issued

Completed

Start:

04 Mar 2022

Due:

18 Mar 2022

Completion:

18 Mar 2022

Responsible Committee decision (ex-Committee)

Completed

Start:

18 Mar 2022

Due:

23 Mar 2022

Completion:

23 Mar 2022

Authority determination

Completed

Start:

23 Mar 2022

Due:

08 Apr 2022

Completion:

08 Apr 2022
Impacted Consumers
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 14.04.2022_live
Included changes Affected REC Items
R0105 Review of ONAGE SLAs
  • Schedule 14 - Metering Operations
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As the Authority, I want the necessary changes made to the Retail Energy Code to introduce the MSC obligations, so that the new MSC licence obligations on Energy Suppliers can be effectively discharged by RECCo.
Proposed Solution Document
Document title
Legal Text
Archive
Off
Document title
EMAR Change Set
Archive
Off
Problem Statement
Following the publication of Ofgem’s decision on potential short-term interventions to address risks to consumers from market volatility, the Market Stabilisation Charge will be introduced via the modified Standard Licence Condition 24A. A change is needed to the REC to give effect to the Market Stabilisation Charge from 14 April 2022.
Ofgem Decision Document - Short Term Interventions
R0034 - CP Form (Downloadable version)
R0034 - Change Proposal Plan v1.0 (Approved)
R0034 - Initial Assessment Report v1.0 (Approved)
R0034 - Preliminary Change Report v1.0 (Published for Consultation)
R0034 - Consolidated consultation responses v1.0
R0034 - Final Change Report v2.0 (Post-Vote)
Authority Decision for R0034 - Market Stabilisation Charge
Company Name
-
Review status
Review required

New Registration data items and processes to support the transition to Market-wide Half-Hourly Settlement (MHHS)

Date of latest update
Type
Change
ID
R0032
Change Category
Change Path
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This change seeks to deliver a recommendation from the Market-Wide Half Hourly Settlement Programme’s (MHHSP’s) Code Change and Development Group (CCDG), to introduce Registration Service Data Items that will be needed for MHHS, into the existing Supplier Meter Registration Service (SMRS) systems, before MHHS migration commences in October 2024.
Proposer
Colette Baldwin
Change Plan

Solution Analysis and Development

Completed

Start:

03 Feb 2022

Due:

09 May 2022

Completion:

09 May 2022

Service Provider Impact Assessment Issued

Completed

Start:

09 May 2022

Due:

13 May 2022

Completion:

13 May 2022

Party Impact Assessment Issued

Completed

Start:

13 May 2022

Due:

13 May 2022

Completion:

13 May 2022

Preliminary Change Report Issued

Completed

Start:

29 Jun 2022

Due:

29 Jul 2022

Completion:

29 Jul 2022

Consultation Issued

Completed

Start:

29 Jul 2022

Due:

05 Aug 2022

Completion:

05 Aug 2022

Final Change Report Issued

Completed

Start:

05 Aug 2022

Due:

08 Nov 2022

Completion:

08 Nov 2022

Additional Impact Assessment Issued

Completed

Start:

13 May 2022

Due:

29 Jun 2022

Completion:

29 Jun 2022

Responsible Committee Decision (Deferred from 20/09/22)

Completed

Start:

08 Nov 2022

Due:

15 Nov 2022

Completion:

15 Nov 2022
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an impacted Market Participant, I want to ensure good quality underlying data is available to support the transition to HH Settlements to avoid additional time and effort being spent fixing data quality issues during the migration period.
  2. As the MHHS Programme, I want Registration Data Items to be available ahead of the MHHS migration to enable data cleanse activity to be completed to address data quality issues.
Proposed Solution Document
Document title
R0032 Final Solution Documents
Archive
Off
Problem Statement
There are Registration Service Data Items that are critical to the MHHS rules and processes. The MHHS Programme is concerned that starting migration in October 2024 with poor underlying data quality would lead to avoidable time and effort being spent fixing issues during the 12-month migration period. To facilitate MHHS Programme data cleanse activity, prior to the transition to Half Hourly Settlement, Registration Service Data Items need to be introduced into the existing Supplier Meter Registration Service (SMRS) system and displayed in EES.
SME
SME Role
Lead Technical Analyst
CCDG_Transition_Consultation_v1.0-1.pdf
Proposed D0312 data flow with new data items.pdf (03.02.2022)
R0032 - CP form (Downloadable version)
R0032 - Change Proposal Plan v2.0 (Approved)
R0032 Initial Assessment Report v1.0 (Approved)
R0032 Consolidated First Impact Assessment Responses
R0032 Consolidated Second Impact Assessment Responses
R0032 - Preliminary Change Report V1.0 (Approved)
R0032 - Consolidated Consultation Responses
R0032 - Final Change Report v3.0 (Post-Vote)
Company Name
-
Review status
Review required

Service Provider Performance Charges (DCC)

Date of latest update
Type
Change
ID
R0025
Change Category
Priority
Urgent
No
Latest Update
02/04/2023 - Change Proposal implemented 01 April 2023
Summary
This Change Proposal seeks to introduce an economic incentive scheme for the Centralised Registration Service (CRS) Provider through the introduction of Service Provider Performance Charges linked to performance against service levels defined in the REC.
Proposer
Performance Assurance
Change Plan

Preliminary Change Report and Consultation Issued

Completed

Start:

04 Jan 2022

Due:

15 Nov 2022

Completion:

15 Nov 2022

Final Change Report Issued

Completed

Start:

15 Nov 2022

Due:

09 Dec 2022

Completion:

09 Dec 2022

Responsible Committee Decision

Completed

Start:

09 Dec 2022

Due:

20 Dec 2022

Completion:

20 Dec 2022

Send to Authority for Decision

Completed

Start:

20 Dec 2022

Due:

21 Dec 2022

Completion:

21 Dec 2022
Status
Implementation Date
Status Live
EMAR Version 01.04.2023_live
Included changes Affected REC Items
R0100 Update to Error Handling Documents
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As the REC Code Manager, I want to ensure that REC Service Providers achieve their Service Level Agreements (SLAs) defined in REC Service Definitions, so that impacts to the REC Code Manager, REC Parties and other Service Providers, as a consequence of Service Provider underperformance, are minimised and the change process delivers to time and cost.
  2. As a Service Provider, I want clarity on when and how Performance Charges will be used as part of the Performance Assurance Techniques, so that I’m clear on what service levels I need to meet and the consequences of not delivering against these.
Proposed Solution Document
Document title
R0025 Final Legal Text
Archive
Off
Document title
R0025 - Final Solution
Archive
Off
Problem Statement
Service Provider performance measures and charges do not currently exist for services that are not procured by the Retail Energy Code Company but are provided by other Parties. The performance of Service Providers is essential to the proper functioning of the market, without appropriate performance measure or Performance Charges there is little incentive for these providers to maintain service performance or improve poor performance in a timely manner.
R0025 Change Proposal Plan V1.0 (Approved)
R0025 Initial Assessment Report V1.0 (Approved)
R0025 - Preliminary Change Report v1.0 (Issued for Consultation)
R0025 Consolidated Consultation Responses v1.0
R0025 - Final Change Report v2.0 (Post-Vote)
R0025 - Ofgem Decision
Company Name
-
Review status
Review required

ETTOS Report Dissemination

Date of latest update
Type
Change
ID
R0020
Change Category
Change Path
Priority
Urgent
Yes
Latest Update
_
Summary
_
Proposer
Aiyesha Andrade
Change Plan

Initial Assessment Report published

Completed

Start:

29 Nov 2021

Due:

03 Dec 2021

Completion:

03 Dec 2021

Change Panel review

Completed

Start:

03 Dec 2021

Due:

07 Dec 2021

Completion:

07 Dec 2021

Preliminary Change Report issued

Completed

Start:

07 Dec 2021

Due:

13 Dec 2021

Completion:

13 Dec 2021

Change Panel review

Completed

Start:

13 Dec 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021

Consultation starts

Completed

Start:

21 Dec 2021

Due:

22 Dec 2021

Completion:

21 Dec 2021

Consultation ends

Completed

Start:

22 Dec 2021

Due:

12 Jan 2022

Completion:

12 Jan 2022

Final Change Report issued

Completed

Start:

12 Jan 2022

Due:

14 Jan 2022

Completion:

14 Jan 2022

Change Panel decision

Completed

Start:

14 Jan 2022

Due:

18 Jan 2022

Completion:

18 Jan 2022
Impacted REC Documents
Impacted REC Services
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 31.01.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer, I want my Energy Supplier to receive and act upon energy theft tip-offs, to ensure the safety and security of my energy supply.
  2. As an ETTOS Recipient, I need to be aware of changes to the way I will receive and send tip-off information, so I can engage in the process and plan any required changes to my processes.
  3. As an ETTOS Recipient, I need to receive my ETTOS Service Data in a timely manner, so that I am able to act on tip-offs, to reduce risks for consumers and my business.
Proposed Solution Document
Document title
R0020 legal text (tracked changes)
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
The ETTOS Service Provider, will be decommissioning their onsite servers on 31 January 2022. Consequently, the ETTOS web portal will no longer be used to provide the ETTOS Service Data (tip-off reports) to ETTOS Recipients. Instead, reports will be sent directly to ETTOS Recipients via encrypted emails. Updates are required to the REC to reflect the changes to the ETTOS report dissemination process.
R0020 - Change Proposal Plan v1.0 (Approved)
R0020 - Initial Assessment Report v1.0 (Approved)
R0020 - Preliminary Change Report v1.0 (Approved)
R0020 - Final Change Report v1.0 (Pre-Vote)
R0020 - Final Change Report v2.0 (Post-Vote)
Company Name
RECCo
Review status
Review required

Consequential REC changes for BSC CP1532

Date of latest update
Type
Change
ID
R0019
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Ann Perry
Change Plan

Initial Assessment Report and Change Proposal Plan approved

Completed

Start:

26 Nov 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021

Preliminary Change Report issued

Completed

Start:

21 Dec 2021

Due:

28 Jan 2022

Completion:

28 Jan 2022

Preliminary Change Report approval

Completed

Start:

28 Jan 2022

Due:

09 Feb 2022

Completion:

09 Feb 2022

Consultation starts

Completed

Start:

09 Feb 2022

Due:

14 Feb 2022

Completion:

11 Feb 2022

Consultation ends

Completed

Start:

14 Feb 2022

Due:

04 Mar 2022

Completion:

04 Mar 2022

Final Change Report Issued

Completed

Start:

04 Mar 2022

Due:

11 Mar 2022

Completion:

11 Mar 2022

Responsible Committee decision (ex-Committee)

Completed

Start:

11 Mar 2022

Due:

23 Mar 2022

Completion:

22 Mar 2022
Status
Implementation Date
Status Live
EMAR Version 30.06.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an electricity Consumer I want my new Energy Supplier to set up my account and appoint their agents appropriately, so I receive timely and accurate bills.
  2. As a Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  3. As an Energy Supplier, I want to be able to Appoint and De-appoint Agents more quickly, to minimise risks to my settlement performance and ability to produce accurate and timely consumer bills when the new switching arrangements go-live.
Proposed Solution Document
Document title
Legal text (tracked changes)
Archive
Off
Document title
Change Set
Archive
Off
Problem Statement
BSC CP1532 proposed updates to the Change of Supply (CoS) timescales within BSC Procedures BSCP502, BSCP504 and BSCP514, to align the Half-Hourly and Non-Half Hourly Supplier Agent Appointment and de-Appointment timescales and to facilitate the achievement of the Faster Switching programme objectives. BSC CP1532 was approved on 01 September 2021 by the Supplier Volume Allocation Group (SVG). Following the SVG’s decision to approve, BSCP514 moved to the Retail Energy Code (REC) following the implementation of P420 ‘Retail Code Consolidation Significant Code Review’. A REC Change Proposal is therefore required to deliver the full solution.
CP1532 Final CP Report.pdf
R0019 - Change Proposal Plan v1.0 (Approved)
R0019 - Initial Assessment Report v1.0 (Approved)
R0019 - Preliminary Change Report v1.0 (Approved)
R0019 - Final Change Report v2.0 (Post-Vote)
Company Name
-
Review status
Review required

Remote communication obligations for electricity Advanced Meters

Date of latest update
Type
Change
ID
R0015
Change Category
Priority
Urgent
No
Latest Update
30/06/2023 - This change was implemented on 30 June 2023 as part of the June 2023 REC Release
Summary
This Proposal seeks to introduce an explicit obligation under the REC regarding the provision of active remote communications for electricity Advanced Meters. This supports an effective transition for the Advanced Meter segment, ahead of the Market-wide Half Hourly Settlement (MHHS) Programme migration deadlines.
Proposer
David Brown
Change Plan

Initial Assessment Report published

Completed

Start:

17 Nov 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021

Analysis and Solution development activity

Completed

Start:

21 Dec 2021

Due:

27 Feb 2022

Completion:

25 Feb 2022

Party Impact Assessment completion

Completed

Start:

27 Feb 2022

Due:

21 Mar 2022

Completion:

21 Mar 2022

Preliminary Change Report issued

Completed

Start:

07 Apr 2022

Due:

27 May 2022

Completion:

27 May 2022

Consultation starts

Completed

Start:

27 May 2022

Due:

10 Jun 2022

Completion:

10 Jun 2022

Consultation ends

Completed

Start:

10 Jun 2022

Due:

01 Jul 2022

Completion:

01 Jul 2022

Final Change Report issued

Completed

Start:

01 Jul 2022

Due:

29 Jul 2022

Completion:

28 Jul 2022

Metering Expert Panel decision

Completed

Start:

29 Jul 2022

Due:

10 Aug 2022

Completion:

10 Aug 2022

Service Provider Impact Assessment issued

Completed

Start:

21 Mar 2022

Due:

07 Apr 2022

Completion:

07 Apr 2022

Send back solution refinement completed

Completed

Start:

10 Aug 2022

Due:

13 Jan 2023

Completion:

13 Jan 2023

Consultation issued

Completed

Start:

13 Jan 2023

Due:

20 Jan 2023

Completion:

20 Jan 2023

Update provided to Change Panel

Completed

Start:

20 Jan 2023

Due:

07 Feb 2023

Completion:

07 Feb 2023

Final Change Report issued

Completed

Start:

07 Feb 2023

Due:

14 Feb 2023

Completion:

14 Feb 2023

Responsible Committee decision

Completed

Start:

14 Feb 2023

Due:

21 Feb 2023

Completion:

21 Feb 2023

Authority Determination requested

Completed

Start:

21 Feb 2023

Due:

28 Feb 2023

Completion:

24 Mar 2023
Impacted Consumers
Impacted REC Documents
Impacted REC Parties and Market Participants
Status
Implementation Date
Status Live
EMAR Version 30.06.2023_live
Implementation Status
Date Raised
REC Decision Maker
Lead Analyst
Harriet Truss
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an electricity consumer with an Advanced Meter, I want my usage data to be accessed remotely from my meter, to reduce the need for on-site visits and ensure that I receive timely and accurate bills.
  2. As the Market-wide Half Hourly Settlement (MHHS) Programme I want to see an effective, early migration of NHH settled Advanced Meters to HH settled, to reduce the risk of missed migration deadlines and ensuring sufficient time to resolve ‘problem’ sites ahead of the MHHS migration deadline.
  3. As an Energy Supplier I want to obtain usage remotely, reducing the need for on-site metering reading activity, enabling me to settle and bill accurately. As a Metering Equipment Manager (MEM), I need to understand any changes to obligations that may impact my business, so I can engage in the change process and plan any required changes to my systems, processes and organisation.
Proposed Solution Document
Document title
R0015 - Draft Legal Text FCR
Archive
Off
Document title
R0015 Send Back - Draft Legal Text
Archive
Off
Document title
R0015 Send Back - Final Legal Text
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
The Balancing and Settlement Code (BSC) is seeking to mandate the Half-Hourly Settlement of Advanced Meters ahead of the transition to Market-wide Half Hourly Settlement. In order to support this transition, these meters will need to support remote communications to allow half hourly consumption data to be collected. There is currently no explicit requirement for Energy Suppliers and/or Metering Equipment Managers to ensure these meters have working remote communications, which could impact the successful migration of these meters to the new arrangements.
SME
SME Role
Lead Technical Analyst
R0015 - Change Proposal Plan v4.0 (Approved)
R0015 - Initial Assessment Report v2.0 (Approved)
R0015 - Consolidated IA Responses
R0015 - Preliminary Change Report v2.0 (Approved)
R0015 - Consolidated Consultation Responses
R0015 - Ofgem Send Back Final
R0015 - Send Back Preliminary Change Report v3.0
R0015 Send Back Consolidated Responses PUBLIC v1.0
R0015 - Send Back Final Change Report v3.0 (Post-Vote) 21.02.2023
R0015 - Authority Decision 24.03.2023
Company Name
Association of Meter Operators
Review status
Review required

Housekeeping amendments to REC V2

Date of latest update
Type
Change
ID
R0012
Change Category
Other Industry Codes impacted
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Jonathan Hawkins
Change Plan

Initial Assessment Report published

Completed

Start:

04 Oct 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

22 Oct 2021

Completion:

22 Oct 2021

Change Panel review

Completed

Start:

22 Oct 2021

Due:

16 Nov 2021

Completion:

16 Nov 2021

Consultation starts

Completed

Start:

16 Nov 2021

Due:

17 Nov 2021

Completion:

17 Nov 2021

Consultation ends

Completed

Start:

17 Nov 2021

Due:

08 Dec 2021

Completion:

08 Dec 2021

Final Change Report issued

Completed

Start:

08 Dec 2021

Due:

10 Dec 2021

Completion:

10 Dec 2021

Change Panel decision

Completed

Start:

10 Dec 2021

Due:

21 Dec 2021

Completion:

21 Dec 2021
Impacted Consumers
Impacted REC Services
Status
Implementation Date
Status Live
EMAR Version 31.01.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As an Energy Consumer, I need Energy Companies to operate consistent processes, to ensure my energy supply is managed efficiently and to retain my trust in the functioning of the energy market.
  2. As a REC Party, I need the REC to provide a consistent baseline, so I can operate in an interoperable way with other Market Participants.
Proposed Solution Document
Document title
Legal Text (Tracked Changes)
Archive
Off
Document title
Link to Change Set (Clean)
Archive
Off
Problem Statement
The implementation of REC V2, as part of the Retail Code Consolidation SCR, was due to consolidate the existing provisions in other codes into the REC on a like-for-like basis. The Code Manager has identified that there were changes made to previous codes that weren’t reflected in the REC V2 drafting that was implemented. This means that the current processes being operated by industry parties are not reflected in the REC. REC Party's and Service Providers rely on the REC to provide a consistent baseline to ensure the industry operate in an effective and interoperable way. There are currently inconsistencies between the drafting of the REC, and the processes operated by REC Party's and Service Providers, which could cause issues in the effective operation and assurance of the retail energy market.
R0012 - Change Proposal Plan v1.0 (Approved)
R0012 - Initial Assessment Report v1.0 (Approved)
R0012 - Preliminary Change Report v1.0
R0012 - Preliminary Change Report v2.0 (Approved)
R0012 - Final Change Report v1.0 (Pre-Vote)
R0012 - Final Change Report v2.0 (Post-Vote)
Company Name
REC Code Manager
Review status
Review required

Consequential New and Amended Market Messages for BSC Modification P375

Date of latest update
Type
Change
ID
R0008
Change Category
Change Path
Priority
Urgent
No
Latest Update
_
Summary
_
Proposer
Gemma Dixon
Change Plan

Initial Assessment Report published

Completed

Start:

08 Sep 2021

Due:

12 Oct 2021

Completion:

12 Oct 2021

Change Panel review

Completed

Start:

12 Oct 2021

Due:

19 Oct 2021

Completion:

19 Oct 2021

Preliminary Change Report issued

Completed

Start:

19 Oct 2021

Due:

01 Nov 2021

Completion:

29 Oct 2021

Technical Expert Panel review

Completed

Start:

01 Nov 2021

Due:

08 Nov 2021

Completion:

08 Nov 2021

Consultation starts

Completed

Start:

08 Nov 2021

Due:

15 Nov 2021

Completion:

12 Nov 2021

Consultation ends

Completed

Start:

15 Nov 2021

Due:

06 Dec 2021

Completion:

06 Dec 2021

Final Change Report issued

Completed

Start:

06 Dec 2021

Due:

10 Dec 2021

Completion:

10 Dec 2021

Technical Expert Panel decision

Completed

Start:

10 Dec 2021

Due:

22 Dec 2021

Completion:

22 Dec 2021
Status
Implementation Date
Status Live
EMAR Version 30.06.2022_live
Implementation Status
Date Raised
REC Decision Maker
Date of Update to Priority
Solution Development
Proposed solution summary
  1. As a Consumer I want to be able to access aggregation services so that I can take full advantage of commercial opportunities for my onsite generation or demand reduction.
  2. As Market Participant, I need to understand any changes to Market Messages I send and receive that may impact my business, so I can engage in the change process and plan any required changes to my systems and processes.
  3. As an Asset Metering Virtual Lead Party, I need to be recognised as a valid Market Data Service, so that I can appoint BSC Qualified Agents and fulfil relevant metering operations and data collection activities for Asset Metering.
Proposed Solution Document
Document title
Legal Text (Tracked Changes)
Archive
Off
Document title
Link to EMAR Change Set
Archive
Off
Problem Statement
BSC Modification P375 will be implemented on 30th June 2022 and introduces a new role of Asset Metering Virtual Lead Party (AMVLP), to allow settlement of meters ‘behind the boundary point’. To enable this, the AMVLP will need to exchange Market Messages with other Market Participants that underpin the new process being introduced by the BSC. Some of these Market Messages are governed by the REC and require a consequential REC Change Proposal to deliver the full solution.
SME
SME Role
Lead Technical Analyst
SME User
beth.brown@capgemini.com
Attachment B- New and amended Market Messages and Data Items for REC.docx
BSC P375 Final Modification Report
R0008 – Initial Assessment Report v1.0 (Approved)
R0008 – Change Proposal Plan v1.0 (Approved)
R0008 - Preliminary Change Report v1.0 (Approved)
R0008 - Final Change Report v2.0 (Post Vote)
Company Name
-
Review status
Review required